Heaven's Earth Co Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2001 to Jun 2023
- Last 24 months
- 0 permits filed
129 permits since 2000: 110 completed, 7 never finaled, 12 expired or cancelled.
Of the 7 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
12 stairs permits: 10 completed, 2 never finaled. Typically 2 days from filing to permit and 160 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 4, 2019 | Completed final sign-off Feb 2021 | 887 35th Av | re design interior staircase, add 1 new guest room, 1 family room, 1 full bath on 1st fl. per plan, remodel kitchen area with open design on 2nd fl. per plan, convert (e) 2 bedrooms into 2 master bedrooms with full bath on 3rd fl.Details
re design interior staircase, add 1 new guest room, 1 family room, 1 full bath on 1st fl. per plan, remodel kitchen area with open design on 2nd fl. per plan, convert (e) 2 bedrooms into 2 master bedrooms with full bath on 3rd fl. | $10,000 |
| Jul 29, 2019 | Completed final sign-off Feb 2020 | 555 Miramar Av | convert 2 (e) office to 2 bedrm & convert (e) bath to 2 bathrm at ground flr. convert (e) 1 bath to 2 bath rm on 2nd flr. rebuilt (e) interior staircase from 2nd to ground flr.Details
convert 2 (e) office to 2 bedrm & convert (e) bath to 2 bathrm at ground flr. convert (e) 1 bath to 2 bath rm on 2nd flr. rebuilt (e) interior staircase from 2nd to ground flr. | $60,000 |
| May 20, 2019 | Completed final sign-off Jan 2021 | 351 Los Palmos Dr | add 1 master bedroom/bathroom, 1 powder room,1 mech room on 1st fl. add 1 bathroom on 2nd fl. relocate existing living room. reconfigure to open staircase. repair 1st fl rear deck post at grade level per plan.Details
add 1 master bedroom/bathroom, 1 powder room,1 mech room on 1st fl. add 1 bathroom on 2nd fl. relocate existing living room. reconfigure to open staircase. repair 1st fl rear deck post at grade level per plan. | $8,000 |
| Feb 16, 2018 | Completed final sign-off Nov 2018 | 551 Los Palmos Dr | at 1st fl, construct 2 new bedrooms, 2 new baths, family rm. 2nd fl remodel e kitchen, new master bath, remodel e common bath, new 1 level wood deck, new interior stairDetails
at 1st fl, construct 2 new bedrooms, 2 new baths, family rm. 2nd fl remodel e kitchen, new master bath, remodel e common bath, new 1 level wood deck, new interior stair | $80,000 |
| Nov 10, 2016 | Completed final sign-off Sep 2017 | 1539 24th Av | relocate (e) kitchen, remodel (e) bathroom, add one new bathroom & convert (e) kitchen into study room & relocate interior staircase at 2/f, construct 2 bedrooms, media room, laundry area & 2 full bathrooms at g/f, construct deck at rear of bldg., add four 3'x3' roof skylight.Details
relocate (e) kitchen, remodel (e) bathroom, add one new bathroom & convert (e) kitchen into study room & relocate interior staircase at 2/f, construct 2 bedrooms, media room, laundry area & 2 full bathrooms at g/f, construct deck at rear of bldg., add four 3'x3' roof skylight. | $89,000 |
| Aug 4, 2011 | Completed final sign-off Jan 2012 | 1635 21st Av | construct new fire wall in light well. new staircase from 2nd floor down to rear yardDetails
construct new fire wall in light well. new staircase from 2nd floor down to rear yard | $15,000 |
| Apr 18, 2008 | Completed final sign-off Jun 2008 | 1827 Hyde St | repair rear exterior stairs dry rot, less than 50%.Details
repair rear exterior stairs dry rot, less than 50%. | $5,500 |
| Apr 18, 2008 | Never finaled issued Apr 2008, no final | 5432 Fulton St | repair rear exterior stairs dry rot, less than 50%.Details
repair rear exterior stairs dry rot, less than 50%. | $5,000 |
| Apr 14, 2008 | Never finaled issued Apr 2008, no final | 1833 Scott St | repair front exterior stairs less than 50%Details
repair front exterior stairs less than 50% | $3,500 |
| Apr 25, 2007 | Completed final sign-off Aug 2007 | 571 12th Av | (e) partion wall to remain and change room name from study room to storage room. remove (e) outside stair. revisions to 200612159918.Details
(e) partion wall to remain and change room name from study room to storage room. remove (e) outside stair. revisions to 200612159918. | $800 |
| Dec 9, 2003 | Completed final sign-off Dec 2003 | 945 Capp St | repair exterior side stairway dry rot. less than 50% of stairway.Details
repair exterior side stairway dry rot. less than 50% of stairway. | $2,000 |
| Apr 22, 2002 | Completed final sign-off May 2002 | 623 Ellis St | repair back ;stairs dry rot, replace wood (less than 50% of the stair element being replaced) nov200Details
repair back ;stairs dry rot, replace wood (less than 50% of the stair element being replaced) nov200 | $1,500 |