Back to kitchen remodel contractors
Heaven's Earth Co Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2001 to Jun 2023
- Last 24 months
- 0 permits filed
129 permits since 2000: 110 completed, 7 never finaled, 12 expired or cancelled.
Of the 7 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
55 kitchen remodel permits: 51 completed, 1 never finaled, 3 expired or cancelled. Typically 7 days from filing to permit and 121 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 18, 2022 | Completed final sign-off Apr 2025 | 1130 Quintara St | second floor remodel, remove kitchen and living room, dining room, convert space into four bedroom, two bathrooms. 1st flr remodel. keep on car garage, new kitchen, living room, dining room, new bathroom and office space. comply with nov#: 2021-82268Details
second floor remodel, remove kitchen and living room, dining room, convert space into four bedroom, two bathrooms. 1st flr remodel. keep on car garage, new kitchen, living room, dining room, new bathroom and office space. comply with nov#: 2021-82268 | $100,000 |
| Nov 5, 2021 | Expired or cancelled expired Aug 2026 | 326 Hearst Av | remodel existing one kitchen and one bathroom. remove and replace existing cabinets, toilet, bathtub, and faucet. non structural.Details
remodel existing one kitchen and one bathroom. remove and replace existing cabinets, toilet, bathtub, and faucet. non structural. | $5,000 |
| Dec 4, 2019 | Completed final sign-off Feb 2021 | 887 35th Av | re design interior staircase, add 1 new guest room, 1 family room, 1 full bath on 1st fl. per plan, remodel kitchen area with open design on 2nd fl. per plan, convert (e) 2 bedrooms into 2 master bedrooms with full bath on 3rd fl.Details
re design interior staircase, add 1 new guest room, 1 family room, 1 full bath on 1st fl. per plan, remodel kitchen area with open design on 2nd fl. per plan, convert (e) 2 bedrooms into 2 master bedrooms with full bath on 3rd fl. | $10,000 |
| May 20, 2019 | Completed final sign-off Jun 2020 | 571 32nd Av | add 1 bedroom, 2 baths, 4 closets at 2nd fl per plan. relocate kitchen from 2nd fl to 1st fl. remove rear wall and enclose area below 2nd fl bedroom. relocate living rm from 2nd to 1st fl. add 1 powder rm. remoe wall at garage. infill 2nd fl lightwell.Details
add 1 bedroom, 2 baths, 4 closets at 2nd fl per plan. relocate kitchen from 2nd fl to 1st fl. remove rear wall and enclose area below 2nd fl bedroom. relocate living rm from 2nd to 1st fl. add 1 powder rm. remoe wall at garage. infill 2nd fl lightwell. | $15,000 |
| Mar 29, 2019 | Completed final sign-off Apr 2021 | 1470 12th Av | convert basement into one studio per ordinance 162-16, legalization of unit under pa #201902263838 (from 2 units to 3 units), one kitchen, one bathroom and closet.Details
convert basement into one studio per ordinance 162-16, legalization of unit under pa #201902263838 (from 2 units to 3 units), one kitchen, one bathroom and closet. | $5,000 |
| Feb 16, 2018 | Completed final sign-off Nov 2018 | 551 Los Palmos Dr | at 1st fl, construct 2 new bedrooms, 2 new baths, family rm. 2nd fl remodel e kitchen, new master bath, remodel e common bath, new 1 level wood deck, new interior stairDetails
at 1st fl, construct 2 new bedrooms, 2 new baths, family rm. 2nd fl remodel e kitchen, new master bath, remodel e common bath, new 1 level wood deck, new interior stair | $80,000 |
| Dec 18, 2017 | Completed final sign-off Oct 2019 | 2115 21st Av | infill extg lightwell. 1)remodel extg kitchen and bathroom. add one new bathroom and construct 4 sklylight at 2nd floor. 2)convert extg one bedroom to 2 bedrooms. construct one full bathroom and media room with laundry area ayt ground floor.Details
infill extg lightwell. 1)remodel extg kitchen and bathroom. add one new bathroom and construct 4 sklylight at 2nd floor. 2)convert extg one bedroom to 2 bedrooms. construct one full bathroom and media room with laundry area ayt ground floor. | $68,000 |
| Aug 1, 2017 | Completed final sign-off Oct 2017 | 1935 Jefferson St | unit #301: remoedl (e) kitchen, replace cabinets and faucet, sink, appliances. no walls moved, rmeoved, added or infilled. all existing layout to remain unchanged.Details
unit #301: remoedl (e) kitchen, replace cabinets and faucet, sink, appliances. no walls moved, rmeoved, added or infilled. all existing layout to remain unchanged. | $22,100 |
| Jun 29, 2017 | Completed final sign-off Dec 2017 | 402 Duboce Av | work only on #402, no exterior changes, remove (e) bath and add 2 (n) baths, (n) office, remodel kitchen, (n) cabinets, countertops and appliances.Details
work only on #402, no exterior changes, remove (e) bath and add 2 (n) baths, (n) office, remodel kitchen, (n) cabinets, countertops and appliances. | $25,000 |
| May 5, 2017 | Completed final sign-off Aug 2017 | 155 Bartlett St | unit#155b - convert from 2 bedrooms, 1 bath layout to 3 bedrooms & 2 baths. new kitchen appliances.Details
unit#155b - convert from 2 bedrooms, 1 bath layout to 3 bedrooms & 2 baths. new kitchen appliances. | $10,000 |
| Nov 10, 2016 | Completed final sign-off Mar 2017 | 811 14th St | #5 - interior remodel 2nd floor - install wall to add bedroom, remodel bath & kitchen, replace heating furnace. no change in exit & occupied area.Details
#5 - interior remodel 2nd floor - install wall to add bedroom, remodel bath & kitchen, replace heating furnace. no change in exit & occupied area. | $30,000 |
| Nov 10, 2016 | Completed final sign-off Sep 2017 | 1539 24th Av | relocate (e) kitchen, remodel (e) bathroom, add one new bathroom & convert (e) kitchen into study room & relocate interior staircase at 2/f, construct 2 bedrooms, media room, laundry area & 2 full bathrooms at g/f, construct deck at rear of bldg., add four 3'x3' roof skylight.Details
relocate (e) kitchen, remodel (e) bathroom, add one new bathroom & convert (e) kitchen into study room & relocate interior staircase at 2/f, construct 2 bedrooms, media room, laundry area & 2 full bathrooms at g/f, construct deck at rear of bldg., add four 3'x3' roof skylight. | $89,000 |
| Jul 26, 2016 | Completed final sign-off Jan 2017 | 2178 17th Av | remodel (e) kitchen. construct 1 new bathroom. rewire partial elect all work at 2nd floorDetails
remodel (e) kitchen. construct 1 new bathroom. rewire partial elect all work at 2nd floor | $26,000 |
| Jul 22, 2016 | Completed final sign-off Dec 2016 | 335 10th St | work in units #335a, 337a, 339a. replace in kind rear portion of building at units 335a, 337a, 339a. kitchen remodel at 335a & 339a. new wall at hallway at 335a & 339a maher naDetails
work in units #335a, 337a, 339a. replace in kind rear portion of building at units 335a, 337a, 339a. kitchen remodel at 335a & 339a. new wall at hallway at 335a & 339a maher na | $40,000 |
| Jun 23, 2016 | Completed final sign-off Oct 2016 | 1441 Clay St | 9th floor: unit 9: interior remodel. install partitions to add bedroom. relocate kitchen. remodel bathroom. no change in exit or occupied area maher naDetails
9th floor: unit 9: interior remodel. install partitions to add bedroom. relocate kitchen. remodel bathroom. no change in exit or occupied area maher na | $25,000 |
| Jun 16, 2016 | Completed final sign-off Aug 2016 | 1489 Webster St | 7th floor, unit 702: interior remodel: relocate walls. install partitions to add bedroom. remodel kitchen and bath. no change in exit or occupied area. maher na. sprinklers deferred.Details
7th floor, unit 702: interior remodel: relocate walls. install partitions to add bedroom. remodel kitchen and bath. no change in exit or occupied area. maher na. sprinklers deferred. | $35,000 |
| Jun 9, 2016 | Completed final sign-off Aug 2016 | 1489 Webster St | interior remodel of apt 902,9th floor - remodel kitchen & bath in kind. relocate walls & install partitions to add 1 new bedrooms. no change in exist & occupied area. maher na sprinklers deferred.Details
interior remodel of apt 902,9th floor - remodel kitchen & bath in kind. relocate walls & install partitions to add 1 new bedrooms. no change in exist & occupied area. maher na sprinklers deferred. | $30,000 |
| May 23, 2016 | Completed final sign-off Sep 2016 | 948 Pacific Av | remodel (e) kitchen, bathroom (replace counters, cabinets, sink & flooring). rewire electrical. all work at ground floor.Details
remodel (e) kitchen, bathroom (replace counters, cabinets, sink & flooring). rewire electrical. all work at ground floor. | $10,000 |
| Apr 27, 2016 | Completed final sign-off Aug 2016 | 811 14th St | apt #4, 1st floor interior remodel. remodel kitchen & bathroom. add 2 new bedrooms. no change in exit & occupied area.Details
apt #4, 1st floor interior remodel. remodel kitchen & bathroom. add 2 new bedrooms. no change in exit & occupied area. | $25,000 |
| Mar 24, 2016 | Completed final sign-off Jun 2016 | 885 Franklin St | interior remodel of apts 306. remodel kitchen, build walls to add one bedroom, dining room, studyDetails
interior remodel of apts 306. remodel kitchen, build walls to add one bedroom, dining room, study | $60,000 |
| Oct 30, 2015 | Completed final sign-off Dec 2015 | 155 Haight St | unit 204, interior remodel - add 1 bedroom and relocate kitchenDetails
unit 204, interior remodel - add 1 bedroom and relocate kitchen | $18,000 |
| Aug 21, 2015 | Completed final sign-off Oct 2015 | 155 Haight St | 3rd floor apt 305: interior remodel - relocate kitchen, add one bedroom. all exits & egress thru windows & sliding door to exterior to remain unchanged. all rated horizontal and vertical assemblies to remain intact.Details
3rd floor apt 305: interior remodel - relocate kitchen, add one bedroom. all exits & egress thru windows & sliding door to exterior to remain unchanged. all rated horizontal and vertical assemblies to remain intact. | $15,000 |
| Mar 20, 2015 | Completed final sign-off Jul 2015 | 155 Haight St | #202 - remodel, install wall to add bedroom, relocate kitchen. all fire rated assemblies to be maintained.Details
#202 - remodel, install wall to add bedroom, relocate kitchen. all fire rated assemblies to be maintained. | $20,000 |
| Dec 12, 2014 | Completed final sign-off Mar 2015 | 155 Haight St | interior work in apt #208. relocate kitchen. divide space for a bedroom. no exit or egress door changes.Details
interior work in apt #208. relocate kitchen. divide space for a bedroom. no exit or egress door changes. | $35,000 |
| Oct 22, 2014 | Completed final sign-off Feb 2015 | 155 Haight St | #205 2/f- divide with wall & door to add 1 bedroom, relocate kitchen.Details
#205 2/f- divide with wall & door to add 1 bedroom, relocate kitchen. | $25,000 |
| Aug 28, 2014 | Completed final sign-off Jan 2015 | 155 Haight St | work in apt 309. relocate kitchen, remodel bath, install wall and door to divide room, create one bedroom.Details
work in apt 309. relocate kitchen, remodel bath, install wall and door to divide room, create one bedroom. | $20,000 |
| Jul 18, 2014 | Completed final sign-off Sep 2015 | 51 Lupine Av | in both units - remodel 2 kitchens, 4 bathrroms, upgrade elctrical service to 200 amp; to comply with cec150(k) 8 & 10Details
in both units - remodel 2 kitchens, 4 bathrroms, upgrade elctrical service to 200 amp; to comply with cec150(k) 8 & 10 | $50,000 |
| Jul 18, 2014 | Completed final sign-off Oct 2014 | 1935 Jefferson St | #101- remodel kitchen to comply with cec150(k) 8. n/a ordinance #155-13.Details
#101- remodel kitchen to comply with cec150(k) 8. n/a ordinance #155-13. | $10,000 |
| Feb 21, 2014 | Completed final sign-off Mar 2015 | 1615 Mcallister St | revision to approved applicaiton #2012-0611-2251 to reconfigure kitchen area & restroom layout per plan at ground floor. compliance of maher ordinance # 155-13 does not applyDetails
revision to approved applicaiton #2012-0611-2251 to reconfigure kitchen area & restroom layout per plan at ground floor. compliance of maher ordinance # 155-13 does not apply | $2,000 |
| Dec 20, 2013 | Completed final sign-off Sep 2015 | 108 Burlwood Dr | remodel (e) bathroom, kitchen, bathroom & convert two (e) bedroom into one bedroom & upgrade partial ceiling joists. replace all sheetrock at 2nd floor. remodel (e) bthroom & (e) family rm at 1st floor. re-wire elect & lightings at 2nd /1st floor.Details
remodel (e) bathroom, kitchen, bathroom & convert two (e) bedroom into one bedroom & upgrade partial ceiling joists. replace all sheetrock at 2nd floor. remodel (e) bthroom & (e) family rm at 1st floor. re-wire elect & lightings at 2nd /1st floor. | $42,000 |
| Jul 15, 2013 | Completed final sign-off Dec 2013 | 141 Forest View Dr | remodel (e) kitchen & convert (e) half bath room into full bath room, all work at second floor.Details
remodel (e) kitchen & convert (e) half bath room into full bath room, all work at second floor. | $18,000 |
| Aug 20, 2012 | Completed final sign-off Jul 2013 | 230 Gellert Dr | remodel (e) kitchen, two full bathroom & half bathroom, re-wire elect lighting in dining & living room & kitchen area at 2nd floor.Details
remodel (e) kitchen, two full bathroom & half bathroom, re-wire elect lighting in dining & living room & kitchen area at 2nd floor. | $30,000 |
| Aug 6, 2012 | Completed final sign-off Apr 2013 | 765 36th Av | remodel (e) kitchen, relocate bathrm, add one new bathrm. const (2) new skylight & upgrade (e) ceiling framing at third fl. repair/replace partial dry wall at rear of bldg at third fl. replace (e) window/fench door w/ new in kind.Details
remodel (e) kitchen, relocate bathrm, add one new bathrm. const (2) new skylight & upgrade (e) ceiling framing at third fl. repair/replace partial dry wall at rear of bldg at third fl. replace (e) window/fench door w/ new in kind. | $42,000 |
| May 31, 2011 | Completed final sign-off Jan 2012 | 1532 Larkin St | remodel extg kitchen and bath room. all work at 3rd floor at 1538 larkin street.Details
remodel extg kitchen and bath room. all work at 3rd floor at 1538 larkin street. | $25,000 |
| May 5, 2011 | Completed final sign-off Feb 2012 | 2462 40th Av | 1)remodel extg bath room, kitchen, remove part of partition wall, upgrade ceiling joists and re-wire elect, lighting at 2nd floor.2)remodel extg bath room, add one storage room and rewire elect. lighting in extg family room at ground floor.Details
1)remodel extg bath room, kitchen, remove part of partition wall, upgrade ceiling joists and re-wire elect, lighting at 2nd floor.2)remodel extg bath room, add one storage room and rewire elect. lighting in extg family room at ground floor. | $32,000 |
| Mar 17, 2011 | Completed final sign-off May 2011 | 1935 Jefferson St | work at unit #202: kitchen renovation, replace cabinetry, new dry wall finish, paint, sink, faucet, garbage disposal, countertops and flooring, no wall relocation. at least 50% high efficacy lighting (by wattage)Details
work at unit #202: kitchen renovation, replace cabinetry, new dry wall finish, paint, sink, faucet, garbage disposal, countertops and flooring, no wall relocation. at least 50% high efficacy lighting (by wattage) | $12,000 |
| Nov 22, 2010 | Completed final sign-off Dec 2010 | 555 Diamond St | repair 2' x 14' dry rot @ exterior rear kitchen area below patio door sill.Details
repair 2' x 14' dry rot @ exterior rear kitchen area below patio door sill. | $10,000 |
| Jul 12, 2010 | Completed final sign-off Sep 2010 | 542 Rockdale Dr | renovate existing kitchen, new cabinetry, sink, faucet and floors, new lighting comply with cec 150(k), no structural changes.Details
renovate existing kitchen, new cabinetry, sink, faucet and floors, new lighting comply with cec 150(k), no structural changes. | $10,000 |
| Feb 1, 2010 | Completed final sign-off May 2010 | 20 Toledo Wy | remodel (e) bathroom/kitchen, replace fixtures, counter & cabinets. all work at second floor - 20 toledo way.Details
remodel (e) bathroom/kitchen, replace fixtures, counter & cabinets. all work at second floor - 20 toledo way. | $15,000 |
| Sep 1, 2009 | Completed final sign-off Feb 2010 | 391 Oak Park Dr | remodel (e) kitchen. install (n) lighting fixtures in kitchen, dining rm. & living rm. all work at second floor.Details
remodel (e) kitchen. install (n) lighting fixtures in kitchen, dining rm. & living rm. all work at second floor. | $13,000 |
| May 30, 2008 | Completed final sign-off Oct 2008 | 2218 20th Av | replace kitchen cabinets, flooring, sink & stove. replace bathtub, venity sink & flooring. replace drywall, add insulation. lighting to comply with title 24.Details
replace kitchen cabinets, flooring, sink & stove. replace bathtub, venity sink & flooring. replace drywall, add insulation. lighting to comply with title 24. | $20,000 |
| Oct 16, 2007 | Completed final sign-off Dec 2007 | 1935 Jefferson St | work @ unit# 302 only. kitchen renovation. replace cabinets, kitchen counter, sink & flooring. min 50% of kitchen lighting wattage must be fluorescent.Details
work @ unit# 302 only. kitchen renovation. replace cabinets, kitchen counter, sink & flooring. min 50% of kitchen lighting wattage must be fluorescent. | $12,000 |
| Oct 16, 2007 | Completed final sign-off Jan 2008 | 2230 Francisco St | work @ unit# 103 only. kitchen renovation. replace cabinets, kitchen counter, sink & flooring. min 50% of kitchen lighting wattage must be fluorescent.Details
work @ unit# 103 only. kitchen renovation. replace cabinets, kitchen counter, sink & flooring. min 50% of kitchen lighting wattage must be fluorescent. | $10,000 |
| Mar 12, 2007 | Completed final sign-off Jun 2007 | 1670 40th Av | kitchen renovation, replace cabinets, sink., flooring.Details
kitchen renovation, replace cabinets, sink., flooring. | $10,000 |
| Aug 9, 2005 | Completed final sign-off Sep 2005 | 122 Galewood Cr | kitchen & bath remodel -replace cabinets, sinks and toiletDetails
kitchen & bath remodel -replace cabinets, sinks and toilet | $10,000 |
| Jun 9, 2005 | Completed final sign-off Sep 2005 | 1801 Page St | interior renovate 3 kitchen &3bath.replace cabinets&plumb fixtures.no structural work.Details
interior renovate 3 kitchen &3bath.replace cabinets&plumb fixtures.no structural work. | $40,000 |
| Jan 28, 2005 | Never finaled issued Jan 2005, no final | 1922 22nd Av | construct room on ground floor behind garage remodel (e) kitchen &baths on 2nd floor.Details
construct room on ground floor behind garage remodel (e) kitchen &baths on 2nd floor. | $28,000 |
| Mar 29, 2004 | Completed final sign-off Aug 2004 | 1671 33rd Av | remodel kitchen (new flooring, cabinets & plumbing fixtures) remodel bath (new shower pan, tiling,Details
remodel kitchen (new flooring, cabinets & plumbing fixtures) remodel bath (new shower pan, tiling, | $20,000 |
| Mar 29, 2004 | Completed final sign-off Jul 2004 | 1915 35th Av | remodel kitchen (new flooring, cabinets & plumbing fixtures) remodel bath (new shower pan, tiling,Details
remodel kitchen (new flooring, cabinets & plumbing fixtures) remodel bath (new shower pan, tiling, | $20,000 |
| Nov 25, 2003 | Completed final sign-off Jun 2004 | 2421 Lawton St | remodel kitchen and 2 bedroomsDetails
remodel kitchen and 2 bedrooms | $12,000 |
| Jan 6, 2003 | Expired or cancelled expired Aug 2006 | 107 28th St | remodel kitchen and dining room replace windows (includes installation of new dry wall, insulation oDetails
remodel kitchen and dining room replace windows (includes installation of new dry wall, insulation o | $28,000 |
| Oct 1, 2001 | Completed final sign-off Apr 2002 | 735 32nd Av | remodel 2/f bath and kitchen remodel 3/f two baths 1 closet and 2 skylits install r-19 ceilingDetails
remodel 2/f bath and kitchen remodel 3/f two baths 1 closet and 2 skylits install r-19 ceiling | $35,000 |
| Jul 20, 2001 | Completed final sign-off Jan 2002 | 3737 Washington St | replace kitchen cabinets & countertops. lighting.Details
replace kitchen cabinets & countertops. lighting. | $8,000 |
| Jul 20, 2001 | Expired or cancelled expired Jan 2002 | 735 32nd Av | replace kitchen cabinets, countertops, lighting and electrical service, replace sheetrockDetails
replace kitchen cabinets, countertops, lighting and electrical service, replace sheetrock | $8,000 |
| Jun 25, 2001 | Completed final sign-off Jan 2002 | 3388 Washington St | replace kitchen cabinets & counter tops only.Details
replace kitchen cabinets & counter tops only. | $10,000 |