Hcg Associates Inc
- Based in
- Napa
- On San Francisco permits
- Dec 2010 to Oct 2026
- Last 24 months
- 7 permits filed
70 permits since 2000: 49 completed, 7 in progress, 10 never finaled, 4 expired or cancelled.
Of the 10 never-finaled permits, 3 are 3 to 5 years old, 5 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
6 stairs permits: 3 completed, 2 in progress, 1 never finaled. Typically 88 days from filing to permit and 759 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 29, 2024 | In progress issued Aug 2024 | 88 Bernal Heights Bl | 1st/fl construct n) floor in crawspace area add n) living space(435 sf) construct interior stairs to 2nd/fl. new exterior stairs & deck to rear yard. 2nd/fl remodel e) bath, laundry, bedroom & walkin closet. reconstruct partial e) interior stairs to 3rd floor. add guard rail. foundation replacementDetails
1st/fl construct n) floor in crawspace area add n) living space(435 sf) construct interior stairs to 2nd/fl. new exterior stairs & deck to rear yard. 2nd/fl remodel e) bath, laundry, bedroom & walkin closet. reconstruct partial e) interior stairs to 3rd floor. add guard rail. foundation replacement | $200,000 |
| Jan 10, 2024 | Completed final sign-off Apr 2026 | 1640 Florida St | voluntary seismic strengthening of ground floor by adding new plywood shearwall and foundation elements; new wood braces to rear stairway; no lowering of 1st floor elevation.Details
voluntary seismic strengthening of ground floor by adding new plywood shearwall and foundation elements; new wood braces to rear stairway; no lowering of 1st floor elevation. | $50,000 |
| Nov 8, 2023 | In progress issued May 2024 | 530 18th Av | add rear stairs and landing, dry rot repair in south lightwellDetails
add rear stairs and landing, dry rot repair in south lightwell | $8,000 |
| Jan 13, 2021 | Completed final sign-off Feb 2023 | 425 Upper Tr | unit #2: structural repairs to rear cantilevered balconies and courtyard stairs.Details
unit #2: structural repairs to rear cantilevered balconies and courtyard stairs. | $80,000 |
| Jun 20, 2019 | Never finaled issued Sep 2019, no final | 22 Cervantes Bl | remove and replace extg stair in kind. n/a for maherDetails
remove and replace extg stair in kind. n/a for maher | $10,000 |
| Nov 29, 2016 | Completed final sign-off May 2020 | 551 37th Av | add to kitchen/bath permit 201609228590, add concrete walkway, reconfig rear stair. 2nd fl:raise roof w kitchen popout, move dbrm doors, gas fireplc, plumb,elec,hvac, n vinyls windows, refinish flrs, widen opening ktich/lvrm rm.1st fl:raise ceiling,n bedrm,family rm,storage,2 full bath,grade beam,Details
add to kitchen/bath permit 201609228590, add concrete walkway, reconfig rear stair. 2nd fl:raise roof w kitchen popout, move dbrm doors, gas fireplc, plumb,elec,hvac, n vinyls windows, refinish flrs, widen opening ktich/lvrm rm.1st fl:raise ceiling,n bedrm,family rm,storage,2 full bath,grade beam, | $275,000 |