Back to bathroom remodel contractors
Hcg Associates Inc
- Based in
- Napa
- On San Francisco permits
- Dec 2010 to Oct 2026
- Last 24 months
- 7 permits filed
70 permits since 2000: 49 completed, 7 in progress, 10 never finaled, 4 expired or cancelled.
Of the 10 never-finaled permits, 3 are 3 to 5 years old, 5 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 3 completed, 1 in progress, 1 never finaled. Typically 7 days from filing to permit and 1261 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 17, 2024 | Completed final sign-off Jan 2026 | 3733 23rd St | kitchen & bathroom remodel. remove/replace flooring in kitchen and bathroom in-kind. install new cabinets under new counter, new appliances. repaint walls. no additional plumbing fixtures.Details
kitchen & bathroom remodel. remove/replace flooring in kitchen and bathroom in-kind. install new cabinets under new counter, new appliances. repaint walls. no additional plumbing fixtures. | $20,000 |
| Jul 29, 2024 | In progress issued Aug 2024 | 88 Bernal Heights Bl | 1st/fl construct n) floor in crawspace area add n) living space(435 sf) construct interior stairs to 2nd/fl. new exterior stairs & deck to rear yard. 2nd/fl remodel e) bath, laundry, bedroom & walkin closet. reconstruct partial e) interior stairs to 3rd floor. add guard rail. foundation replacementDetails
1st/fl construct n) floor in crawspace area add n) living space(435 sf) construct interior stairs to 2nd/fl. new exterior stairs & deck to rear yard. 2nd/fl remodel e) bath, laundry, bedroom & walkin closet. reconstruct partial e) interior stairs to 3rd floor. add guard rail. foundation replacement | $200,000 |
| Nov 29, 2016 | Completed final sign-off May 2020 | 551 37th Av | add to kitchen/bath permit 201609228590, add concrete walkway, reconfig rear stair. 2nd fl:raise roof w kitchen popout, move dbrm doors, gas fireplc, plumb,elec,hvac, n vinyls windows, refinish flrs, widen opening ktich/lvrm rm.1st fl:raise ceiling,n bedrm,family rm,storage,2 full bath,grade beam,Details
add to kitchen/bath permit 201609228590, add concrete walkway, reconfig rear stair. 2nd fl:raise roof w kitchen popout, move dbrm doors, gas fireplc, plumb,elec,hvac, n vinyls windows, refinish flrs, widen opening ktich/lvrm rm.1st fl:raise ceiling,n bedrm,family rm,storage,2 full bath,grade beam, | $275,000 |
| Sep 22, 2016 | Completed final sign-off May 2020 | 551 37th Av | kitchen & bathroom remodel: replace cabinets, sheet rock, counter tops, flooring, tile toilet tub & sink, electrical bring up to code, plumbing: p traps & hook up sink/ toilet tub faucet. no walls to be altered.Details
kitchen & bathroom remodel: replace cabinets, sheet rock, counter tops, flooring, tile toilet tub & sink, electrical bring up to code, plumbing: p traps & hook up sink/ toilet tub faucet. no walls to be altered. | $25,000 |
| Apr 9, 2014 | Never finaled issued Mar 2015, no final | 153 Clipper St | convert (e) underfloor basement into living space, parking garage & bathroom.Details
convert (e) underfloor basement into living space, parking garage & bathroom. | $75,000 |