Back to kitchen remodel contractors
Hawke Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2008 to Jun 2025
- Last 24 months
- 5 permits filed
75 permits since 2000: 64 completed, 3 in progress, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
23 kitchen remodel permits: 18 completed, 2 in progress, 2 never finaled, 1 expired or cancelled. Typically 8 days from filing to permit and 281 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 17, 2025 | In progress issued Jul 2025 | 1371 06th Av | revision to pa# 202501098027: to include 98 sf horizontal extension (kitchen) at rear yard.Details
revision to pa# 202501098027: to include 98 sf horizontal extension (kitchen) at rear yard. | $6,319 |
| Feb 18, 2025 | Completed final sign-off Sep 2026 | 1646 Grove St | interior renovation level 1 & 2. renovate e) kitchen & 3 baths, new half bath. new deck at rear w/in buildable area. modify e) lightwell at level 2.Details
interior renovation level 1 & 2. renovate e) kitchen & 3 baths, new half bath. new deck at rear w/in buildable area. modify e) lightwell at level 2. | $200,000 |
| Jan 9, 2025 | In progress issued Jan 2025 | 1371 06th Av | demolish (e) kitchen, rewire & plumb, install new kitchen "in kind".Details
demolish (e) kitchen, rewire & plumb, install new kitchen "in kind". | $45,000 |
| May 25, 2023 | Completed final sign-off Jul 2024 | 863 Elizabeth St | remodel (e) basement bedrooms/bathroom, add new bathroom & relocat (e) laundry closet. remodel (e) 1st floor kitchen, convert shower room to powder romm. remodel add separating door between subject unit and common area. no other work, no structural, no work to facadesDetails
remodel (e) basement bedrooms/bathroom, add new bathroom & relocat (e) laundry closet. remodel (e) 1st floor kitchen, convert shower room to powder romm. remodel add separating door between subject unit and common area. no other work, no structural, no work to facades | $120,000 |
| May 2, 2023 | Completed final sign-off Apr 2024 | 601 Arkansas St | remodel of 3-story single family dwelling, kitchen/bathrooms, all associated plumbing, electrical/mechanical work. no additional square footage/structural workDetails
remodel of 3-story single family dwelling, kitchen/bathrooms, all associated plumbing, electrical/mechanical work. no additional square footage/structural work | $200,000 |
| Sep 24, 2021 | Completed final sign-off Jul 2022 | 816 Duboce Av | demo and remodel (e) (1) kitchen and (1) laundry, all construction will be "in kind" no framing/strucural workDetails
demo and remodel (e) (1) kitchen and (1) laundry, all construction will be "in kind" no framing/strucural work | $85,000 |
| Sep 8, 2021 | Completed final sign-off Mar 2023 | 21 Homewood Ct | remodel (e) kitchen & (2) bathrooms. remove load baring wall. add new skylightDetails
remodel (e) kitchen & (2) bathrooms. remove load baring wall. add new skylight | $60,000 |
| Apr 1, 2021 | Never finaled issued Nov 2021, no final | 606 Arkansas St | remodel & addition to a 2-story single family residence. an addition of 126 sq ft conditioned space at rear of building including new bathroom. existing kitchen & bathroom are being remodeled including associated plumbing & electrical work.Details
remodel & addition to a 2-story single family residence. an addition of 126 sq ft conditioned space at rear of building including new bathroom. existing kitchen & bathroom are being remodeled including associated plumbing & electrical work. | $150,000 |
| Jan 29, 2021 | Never finaled issued Apr 2021, no final | 3914 Cesar Chavez St | interior remodel of upper unit only including kitchen & bath. create 2nd bathroom & associated m.e.p. work. new windows at rear, no change to footprint.Details
interior remodel of upper unit only including kitchen & bath. create 2nd bathroom & associated m.e.p. work. new windows at rear, no change to footprint. | $110,000 |
| Feb 4, 2020 | Completed final sign-off Aug 2020 | 672 Bay St | revision to pa 2019-1204-8699 - removal of wall between kitchen & dining roomDetails
revision to pa 2019-1204-8699 - removal of wall between kitchen & dining room | $800 |
| Dec 4, 2019 | Completed final sign-off Aug 2020 | 672 Bay St | renovation of condo unit bldg to include renovation of kitchen and bathroom, lighting, electrical and 2 (n) windows and exterior doorsDetails
renovation of condo unit bldg to include renovation of kitchen and bathroom, lighting, electrical and 2 (n) windows and exterior doors | $55,193 |
| Apr 29, 2019 | Completed final sign-off Jul 2020 | 863 Elizabeth St | interior remodel of kitchen, bathrooms, & stairs, including associated mech, elec, plumb work. no change to (e) footprints. replace (2) windows & (2) doors @ rear elevation. no change to street facade.Details
interior remodel of kitchen, bathrooms, & stairs, including associated mech, elec, plumb work. no change to (e) footprints. replace (2) windows & (2) doors @ rear elevation. no change to street facade. | $450,000 |
| Jun 27, 2018 | Completed final sign-off May 2019 | 764 Elizabeth St | renovate kitchen and new 1/2 bath at 1st. new bath and laundry, reno (e) bath at 2nd. new patio at grade at rearDetails
renovate kitchen and new 1/2 bath at 1st. new bath and laundry, reno (e) bath at 2nd. new patio at grade at rear | $128,600 |
| Oct 11, 2017 | Completed final sign-off Aug 2018 | 1167 Bosworth St | relocate interior stair from basement to 1/f, renovate kitchen, new retaining wall at rear deck.Details
relocate interior stair from basement to 1/f, renovate kitchen, new retaining wall at rear deck. | $80,000 |
| Jan 12, 2017 | Completed final sign-off Aug 2017 | 1258 Clayton St | interior renovation 1/f to include: remove wall and renovate (e) kitchen & bath, reconfigure windows at side elevation (south), not visable from street.Details
interior renovation 1/f to include: remove wall and renovate (e) kitchen & bath, reconfigure windows at side elevation (south), not visable from street. | $56,000 |
| Jun 30, 2016 | Expired or cancelled cancelled Jan 2018 | 670 05th Av | new interconnecting stair structure from 1st to 2nd floor (external extension). remove wall between kitchen and dining room, 2nd flr. open up hallway, fill in kitchen door openingDetails
new interconnecting stair structure from 1st to 2nd floor (external extension). remove wall between kitchen and dining room, 2nd flr. open up hallway, fill in kitchen door opening | $40,000 |
| Jan 5, 2016 | Completed final sign-off Jul 2016 | 961 14th St | renovation of an extg condo within 2 unit residence. remodel of 2nd floor kitchen and bath room and nw powder room. new laundry closet with new washer and dryer, new windows and doors at areas of renovation(side and rear elevations). fillin area under roof on side. structural work at rearDetails
renovation of an extg condo within 2 unit residence. remodel of 2nd floor kitchen and bath room and nw powder room. new laundry closet with new washer and dryer, new windows and doors at areas of renovation(side and rear elevations). fillin area under roof on side. structural work at rear | $94,500 |
| Mar 13, 2015 | Completed final sign-off Dec 2015 | 286 Fair Oaks St | construct new mudroom and stairs from garage to 2nd level. reconfigure (e) master bathroom/kitchen/laundry at 2nd level. at 3rd level, renovate/reconfigure (e) kitchen, family rm & bathroom, add new 1/2 bath. no work visible from street and no expansion to bldg envelope.Details
construct new mudroom and stairs from garage to 2nd level. reconfigure (e) master bathroom/kitchen/laundry at 2nd level. at 3rd level, renovate/reconfigure (e) kitchen, family rm & bathroom, add new 1/2 bath. no work visible from street and no expansion to bldg envelope. | $178,000 |
| May 20, 2014 | Completed final sign-off Nov 2014 | 377 Clipper St | interior remodel including kitchen and 1/2 bath on 2nd floor. new shower at bath on 1st floor and new built in at bedroom on 3rd floor. no additional floor/envelope square footage. extension to extg rear deck.Details
interior remodel including kitchen and 1/2 bath on 2nd floor. new shower at bath on 1st floor and new built in at bedroom on 3rd floor. no additional floor/envelope square footage. extension to extg rear deck. | $85,000 |
| Apr 16, 2013 | Completed final sign-off Feb 2014 | 57 Fernwood Dr | kitchen remodel 3 bathrooms remodel & laundry room. replace garage door. add balcony guardrails.Details
kitchen remodel 3 bathrooms remodel & laundry room. replace garage door. add balcony guardrails. | $65,000 |
| Dec 20, 2011 | Completed final sign-off Mar 2013 | 237 28th St | remodel interior-kitchens & bathrooms, add 590 sq ft of conditioned living space at (e) ground level for unit #237. add a connecting stair at unit #237, add a total of 3 new bathrooms, replace windows & add, reconfigure windows at the rear of the building, add beams & shear wallsDetails
remodel interior-kitchens & bathrooms, add 590 sq ft of conditioned living space at (e) ground level for unit #237. add a connecting stair at unit #237, add a total of 3 new bathrooms, replace windows & add, reconfigure windows at the rear of the building, add beams & shear walls | $300,000 |
| Oct 18, 2010 | Completed final sign-off Jan 2011 | 46 Alpine Tr | remodel existing bathroom & kitchen. inclusive of new plumbing electrical. new layout will be exactly the same as existing. no drawings are attached to this project.Details
remodel existing bathroom & kitchen. inclusive of new plumbing electrical. new layout will be exactly the same as existing. no drawings are attached to this project. | $30,000 |
| Jun 3, 2009 | Completed final sign-off Aug 2009 | 125 Hernandez Av | kitchen to be remodeled. new cabinets, countertops, drywall, plumbing & electrical to be upgraded. (under seperate permit). min 50% ofkitchen light wattage shall be of fluorescent light.Details
kitchen to be remodeled. new cabinets, countertops, drywall, plumbing & electrical to be upgraded. (under seperate permit). min 50% ofkitchen light wattage shall be of fluorescent light. | $42,000 |