Hawke Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2008 to Jun 2025
- Last 24 months
- 5 permits filed
75 permits since 2000: 64 completed, 3 in progress, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
12 deck permits: 11 completed, 1 expired or cancelled. Typically 2 days from filing to permit and 148 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 18, 2025 | Completed final sign-off Sep 2026 | 1646 Grove St | interior renovation level 1 & 2. renovate e) kitchen & 3 baths, new half bath. new deck at rear w/in buildable area. modify e) lightwell at level 2.Details
interior renovation level 1 & 2. renovate e) kitchen & 3 baths, new half bath. new deck at rear w/in buildable area. modify e) lightwell at level 2. | $200,000 |
| Oct 5, 2023 | Completed final sign-off May 2024 | 2550 Vallejo St | existing front deck and stairs are leaking, remove existing stone surface, remove old membrane and haul away, repair if any dryrot, apply new waterproof membrane, install new motarbed and match the existin stone pavers. repair less than 50%Details
existing front deck and stairs are leaking, remove existing stone surface, remove old membrane and haul away, repair if any dryrot, apply new waterproof membrane, install new motarbed and match the existin stone pavers. repair less than 50% | $35,000 |
| Sep 17, 2019 | Completed final sign-off Oct 2019 | 542 Noe St | deck repair on rear of building less than 50% of deck to be replace in-kind.Details
deck repair on rear of building less than 50% of deck to be replace in-kind. | $17,500 |
| Jun 19, 2019 | Completed final sign-off Aug 2020 | 260 Cresta Vista Dr | repair & expansion to deck at rear, remove and/ or replace (e) rotted deck structure per structurl engineer's specification, expand dec on one side as shown, replace all decking boards, replace all guardrailsDetails
repair & expansion to deck at rear, remove and/ or replace (e) rotted deck structure per structurl engineer's specification, expand dec on one side as shown, replace all decking boards, replace all guardrails | $25,000 |
| Feb 7, 2018 | Completed final sign-off Mar 2018 | 1258 Clayton St | repair deck in rear yard less than 50% of deck will be r&r in kindDetails
repair deck in rear yard less than 50% of deck will be r&r in kind | $11,250 |
| Oct 11, 2017 | Completed final sign-off Aug 2018 | 1167 Bosworth St | relocate interior stair from basement to 1/f, renovate kitchen, new retaining wall at rear deck.Details
relocate interior stair from basement to 1/f, renovate kitchen, new retaining wall at rear deck. | $80,000 |
| Jan 5, 2017 | Expired or cancelled cancelled Sep 2017 | 1258 Clayton St | repair leaking roof under deck. replace portions of (e) deck that have rotted less than 50% of (e) deck to be repaired.Details
repair leaking roof under deck. replace portions of (e) deck that have rotted less than 50% of (e) deck to be repaired. | $8,000 |
| Nov 2, 2016 | Completed final sign-off Nov 2016 | 49 Richland Av | repair less than 50% of existing deck & stairs.Details
repair less than 50% of existing deck & stairs. | $4,000 |
| Jan 26, 2016 | Completed final sign-off Jun 2016 | 231 Upper Tr | make structural repairs on existing deck supports with steel channel.repair in kind , less than 50% of deck will be worked on. fur out steel channel and cover with stucco and then paint.Details
make structural repairs on existing deck supports with steel channel.repair in kind , less than 50% of deck will be worked on. fur out steel channel and cover with stucco and then paint. | $10,000 |
| May 20, 2014 | Completed final sign-off Nov 2014 | 377 Clipper St | interior remodel including kitchen and 1/2 bath on 2nd floor. new shower at bath on 1st floor and new built in at bedroom on 3rd floor. no additional floor/envelope square footage. extension to extg rear deck.Details
interior remodel including kitchen and 1/2 bath on 2nd floor. new shower at bath on 1st floor and new built in at bedroom on 3rd floor. no additional floor/envelope square footage. extension to extg rear deck. | $85,000 |
| Apr 5, 2012 | Completed final sign-off Mar 2013 | 237 28th St | replace & reconfigure existing dilapidated non-code complying egress stair with new code complying egress stair & small deck at 3rd level for dwelling unit 239 28th street.Details
replace & reconfigure existing dilapidated non-code complying egress stair with new code complying egress stair & small deck at 3rd level for dwelling unit 239 28th street. | $25,000 |
| Jan 13, 2012 | Completed final sign-off Feb 2012 | 118 Brewster St | replace rotten siding on south facing side of building. replace leaking tile on front deck. all work to replace in kind. less than 50% of siding or deck.Details
replace rotten siding on south facing side of building. replace leaking tile on front deck. all work to replace in kind. less than 50% of siding or deck. | $10,000 |