Back to kitchen remodel contractors
Hasz Construction Inc
- Based in
- Mill Valley
- On San Francisco permits
- Jan 2002 to Mar 2026
- Last 24 months
- 3 permits filed
102 permits since 2000: 42 completed, 7 in progress, 33 never finaled, 20 expired or cancelled.
Of the 33 never-finaled permits, 8 are 3 to 5 years old, 18 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
19 kitchen remodel permits: 11 completed, 2 in progress, 6 never finaled. Typically 54 days from filing to permit and 157 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 5, 2026 | In progress issued Jun 2026 | 2065 Polk St | tenant improvement of an existing restaurant and bar, includes new i terior non-structural partitions, finishes, lighting, millwork, and kitchen equipment> replace exterior storefront windows and entry door. provide associated mep upgrades.Details
tenant improvement of an existing restaurant and bar, includes new i terior non-structural partitions, finishes, lighting, millwork, and kitchen equipment> replace exterior storefront windows and entry door. provide associated mep upgrades. | $500,000 |
| Nov 3, 2025 | In progress issued Nov 2025 | 1326 09th Av | tenant improvement of an (e) restaurant and bar including new interior non-structural partitions, finishes, lighting, millwork, and kitchen equipment. provide associated mep upgrades. fire sprinkler is design/build under a separate permit. replace (e) maintenance ladder with (n) maintenance stair.Details
tenant improvement of an (e) restaurant and bar including new interior non-structural partitions, finishes, lighting, millwork, and kitchen equipment. provide associated mep upgrades. fire sprinkler is design/build under a separate permit. replace (e) maintenance ladder with (n) maintenance stair. | $500,000 |
| Jun 13, 2024 | Completed final sign-off Apr 2025 | 3345 Steiner St | rev to pa# 2020-1217-1239; to revise design t.i. to expand (e) kitchen and bar area at 1s and 2nd fls. along with micellaneous interior upgrades to mep and ff&e along with code required pot and restroom upgrades no exterior work.Details
rev to pa# 2020-1217-1239; to revise design t.i. to expand (e) kitchen and bar area at 1s and 2nd fls. along with micellaneous interior upgrades to mep and ff&e along with code required pot and restroom upgrades no exterior work. | |
| May 9, 2024 | Completed final sign-off Oct 2024 | 3416 19th St | project involves the renovation of portions of an extg restaurant. the project consists of built in seating and service milwork as well as lighting, restroom and kitchen upgrade.Details
project involves the renovation of portions of an extg restaurant. the project consists of built in seating and service milwork as well as lighting, restroom and kitchen upgrade. | $350,000 |
| Apr 11, 2023 | Never finaled issued Aug 2023, no final | 300 16th St | revision to 201908138652 and 201910164647. changes to tenant space 23. includes kitchen, indoor and patio seating area, patio bar, restroom and other support spaces. mep. project includes roof equipment and roof screenDetails
revision to 201908138652 and 201910164647. changes to tenant space 23. includes kitchen, indoor and patio seating area, patio bar, restroom and other support spaces. mep. project includes roof equipment and roof screen | |
| Jul 29, 2022 | Completed final sign-off Feb 2024 | 243 West Portal Av | remodel of (e) 2 tenant space into a new restaurant & small office. work to include construction of new restrooms, new kitchen equipment, new interior finishes, new structural system to support new roof top equipment & new secord floor level.Details
remodel of (e) 2 tenant space into a new restaurant & small office. work to include construction of new restrooms, new kitchen equipment, new interior finishes, new structural system to support new roof top equipment & new secord floor level. | $900,000 |
| Apr 20, 2022 | Completed final sign-off Sep 2023 | 1601 Mariposa St | new interior built out of 3 restaurant venues with shared common kitchen - air intake louvers - new kitchen, new hood, new electrical , new plumbing - sprinkler (existing) and new fire alarm under seperate permitDetails
new interior built out of 3 restaurant venues with shared common kitchen - air intake louvers - new kitchen, new hood, new electrical , new plumbing - sprinkler (existing) and new fire alarm under seperate permit | $1,000,000 |
| Sep 7, 2021 | Never finaled issued Oct 2021, no final | 501 Hayes St | ti of (e) ground fl restaurant. (n) interior non-structural partitions & bar. (n) finishes, lighting, millwork, & kitchen equip. accessibility upgrades to (e) restrooms. no work to exterior. mep & ansul system under separate permit.Details
ti of (e) ground fl restaurant. (n) interior non-structural partitions & bar. (n) finishes, lighting, millwork, & kitchen equip. accessibility upgrades to (e) restrooms. no work to exterior. mep & ansul system under separate permit. | $110,000 |
| Jul 2, 2018 | Never finaled issued Jul 2018, no final | 3092 16th St | adjust kitchen size and move 2 bathrooms, updating one to be accessible for the restaurant spaceDetails
adjust kitchen size and move 2 bathrooms, updating one to be accessible for the restaurant space | $250,000 |
| Jan 5, 2018 | Completed final sign-off Jun 2018 | 2240 Chestnut St | demo (e) millwork and walk in. install new millwork, banquet seating, new finishe and lighting. install new kitchen equipment & extend type 1 hood to 96". signage under separate.Details
demo (e) millwork and walk in. install new millwork, banquet seating, new finishe and lighting. install new kitchen equipment & extend type 1 hood to 96". signage under separate. | $100,000 |
| Nov 9, 2017 | Completed final sign-off Aug 2018 | 901 Valencia St | tenant improvement of an existing ground floor and basement floor restaurand space to a new restaurant. new interior non structural partitions, kitchen equipment, millwork and finishes. new structural beam and column. new exterior paint only. maher naDetails
tenant improvement of an existing ground floor and basement floor restaurand space to a new restaurant. new interior non structural partitions, kitchen equipment, millwork and finishes. new structural beam and column. new exterior paint only. maher na | $302,468 |
| Jul 7, 2017 | Completed final sign-off Jun 2018 | 838 Divisadero St | revision to pa#201507070795, specify different pollution control unit for solid fuel kitchen exhaust. ul300 and f/s connection sep permits. n/a ordinance #155-13Details
revision to pa#201507070795, specify different pollution control unit for solid fuel kitchen exhaust. ul300 and f/s connection sep permits. n/a ordinance #155-13 | |
| May 11, 2017 | Completed final sign-off Oct 2017 | 3130 Fillmore St | t.i. for an existing ground fl. restaurant space to a new restaurant. new interior non-structural partitions, kitchen equip, millwork, and finishes. newmech, elec, plumb work. new exterior siding and lighting and retractable awning.Details
t.i. for an existing ground fl. restaurant space to a new restaurant. new interior non-structural partitions, kitchen equip, millwork, and finishes. newmech, elec, plumb work. new exterior siding and lighting and retractable awning. | $157,000 |
| Dec 16, 2016 | Completed final sign-off Jun 2018 | 834 Divisadero St | restaurant tenant improvement including kitchen & kitchen hood. change of occupancy from mercantile (m) to restaurant (a-2). ** maher: n/a **Details
restaurant tenant improvement including kitchen & kitchen hood. change of occupancy from mercantile (m) to restaurant (a-2). ** maher: n/a ** | $200,000 |
| Sep 27, 2016 | Completed final sign-off Jun 2017 | 51 Yerba Buena Ln | t.i. of an extg retail space to a new restaurant. new interior non-structural partitions, kitchen equipment, millwork, and finishes. new mechanical, electrical and plmg. all work to remain within the interior shell of the extg bldg. no increase in square footage. life safety deferred. n/a maherDetails
t.i. of an extg retail space to a new restaurant. new interior non-structural partitions, kitchen equipment, millwork, and finishes. new mechanical, electrical and plmg. all work to remain within the interior shell of the extg bldg. no increase in square footage. life safety deferred. n/a maher | $300,000 |
| Aug 31, 2016 | Never finaled issued Dec 2016, no final | 590 Van Ness Av | to comply with nov 2105018052 enf, per discussion w/ planning dept to establish limited restaurant. ti for 6915 sq ft 1st floor restaurant. no change to exterior. new epoxy flooring. expand kitchen prep area into dining area. new ada bathroom. new lighting.Details
to comply with nov 2105018052 enf, per discussion w/ planning dept to establish limited restaurant. ti for 6915 sq ft 1st floor restaurant. no change to exterior. new epoxy flooring. expand kitchen prep area into dining area. new ada bathroom. new lighting. | $75,000 |
| Apr 6, 2016 | Completed final sign-off Sep 2016 | 240 Kearny St | tenant improvement of existing ground flr & basement restaurant space. new,non-structural partitions & finishes,lighting,millwork & kitchen equipment.new plumbing,electrical & mechanical work.Details
tenant improvement of existing ground flr & basement restaurant space. new,non-structural partitions & finishes,lighting,millwork & kitchen equipment.new plumbing,electrical & mechanical work. | $170,000 |
| Mar 18, 2015 | Never finaled issued Mar 2015, no final | 2000 Union St | remodel of extg restuarant ground floor kitchen area to add dishwashing station and relocate extg equipment and provided a pass thru window.Details
remodel of extg restuarant ground floor kitchen area to add dishwashing station and relocate extg equipment and provided a pass thru window. | $11,500 |
| Jun 24, 2014 | Never finaled issued Jun 2014, no final | 590 Van Ness Av | g/f -addition of new equipment in existing kitchen. install 2 new walk in refrigerators and low wall around prep tables. change of tenant from vacant to sprg; mep under separate permit- new occupanct load- assembly permit requiredDetails
g/f -addition of new equipment in existing kitchen. install 2 new walk in refrigerators and low wall around prep tables. change of tenant from vacant to sprg; mep under separate permit- new occupanct load- assembly permit required | $100,000 |