Harte Building & Design Inc.
- Based in
- San Rafael
- On San Francisco permits
- Dec 2003 to Feb 2025
- Last 24 months
- 3 permits filed
44 permits since 2000: 28 completed, 2 in progress, 10 never finaled, 4 expired or cancelled.
Of the 10 never-finaled permits, 2 are 5 to 10 years old, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
6 roof deck permits: 3 completed, 1 in progress, 1 never finaled, 1 expired or cancelled. Typically 156 days from filing to permit and 385 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 17, 2025 | In progress issued Jun 2025 | 851 Alvarado St | ab1114:adu converted @ basement(no addition)including:(n) windows & doors,(n)1hr fire rated interior corridor to access adu.remodel of(e)kitchen & bath,exterior stairs replaced & roof deck repair waterproofing issues.no fire sprinkler required.no work on 1st & 2 fls.Details
ab1114:adu converted @ basement(no addition)including:(n) windows & doors,(n)1hr fire rated interior corridor to access adu.remodel of(e)kitchen & bath,exterior stairs replaced & roof deck repair waterproofing issues.no fire sprinkler required.no work on 1st & 2 fls. | $220,000 |
| Feb 7, 2017 | Expired or cancelled expired Jul 2024 | 670 12th Av | new roof deck at front roof. no expansion of bld envelope. no added sq footage.additional scope to bpa #2016/1014/0322Details
new roof deck at front roof. no expansion of bld envelope. no added sq footage.additional scope to bpa #2016/1014/0322 | $5,000 |
| Oct 14, 2016 | Completed final sign-off Dec 2018 | 670 12th Av | interior remodel on all existing floors, replace exterior windows, new skylights, new roof deck over e roof at rear, replace rear deck, removeal of bay window at rear, partial lightwell infillDetails
interior remodel on all existing floors, replace exterior windows, new skylights, new roof deck over e roof at rear, replace rear deck, removeal of bay window at rear, partial lightwell infill | $600,000 |
| Mar 10, 2015 | Never finaled issued Mar 2015, no final | 44 Jersey St | scope includes stair access and roof deck for the use of unit 44 onlyDetails
scope includes stair access and roof deck for the use of unit 44 only | $45,000 |
| Apr 27, 2009 | Completed final sign-off Jan 2010 | 1405 Douglass St | revision to appl #200803217683 to add a sink cabient, refrigerator cabient, built-in barbeque w/2' tall splash bedhind it & warming , storage drawers beneath it at the north roof deck under the proposed trellis.Details
revision to appl #200803217683 to add a sink cabient, refrigerator cabient, built-in barbeque w/2' tall splash bedhind it & warming , storage drawers beneath it at the north roof deck under the proposed trellis. | $3,000 |
| Dec 10, 2008 | Completed final sign-off Jul 2012 | 824 Green St | new 250 sf roof deck, new exterior spiral stair to 3rd floor deck, new door to new stairDetails
new 250 sf roof deck, new exterior spiral stair to 3rd floor deck, new door to new stair | $50,000 |