Harte Building & Design Inc.
- Based in
- San Rafael
- On San Francisco permits
- Dec 2003 to Feb 2025
- Last 24 months
- 3 permits filed
44 permits since 2000: 28 completed, 2 in progress, 10 never finaled, 4 expired or cancelled.
Of the 10 never-finaled permits, 2 are 5 to 10 years old, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 7 completed, 1 in progress, 2 never finaled, 1 expired or cancelled. Typically 11 days from filing to permit and 203 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 17, 2025 | In progress issued Jun 2025 | 851 Alvarado St | ab1114:adu converted @ basement(no addition)including:(n) windows & doors,(n)1hr fire rated interior corridor to access adu.remodel of(e)kitchen & bath,exterior stairs replaced & roof deck repair waterproofing issues.no fire sprinkler required.no work on 1st & 2 fls.Details
ab1114:adu converted @ basement(no addition)including:(n) windows & doors,(n)1hr fire rated interior corridor to access adu.remodel of(e)kitchen & bath,exterior stairs replaced & roof deck repair waterproofing issues.no fire sprinkler required.no work on 1st & 2 fls. | $220,000 |
| Jul 8, 2022 | Expired or cancelled expired Dec 2024 | 2390 Hyde St | unit 3 - renovation of (e) 2-level condo: kitchen, 3 baths main fl, 1 bath lower level, interior stair upgrade, bedroom upgrades. ref 202201196232.Details
unit 3 - renovation of (e) 2-level condo: kitchen, 3 baths main fl, 1 bath lower level, interior stair upgrade, bedroom upgrades. ref 202201196232. | $39,221 |
| Mar 6, 2020 | Completed final sign-off Jan 2021 | 755 14th Av | bathroom remodel. new plumbing fixtures and tile. convert bathtub to shower. reconfigure closet next to bathroom.Details
bathroom remodel. new plumbing fixtures and tile. convert bathtub to shower. reconfigure closet next to bathroom. | $16,000 |
| Feb 12, 2015 | Never finaled issued Feb 2015, no final | 40 Jersey St | scope includes renovation of e bathrooms, kitchens at unit 40, 42, 46. new french door and deck at unit 40.Details
scope includes renovation of e bathrooms, kitchens at unit 40, 42, 46. new french door and deck at unit 40. | $50,000 |
| Apr 8, 2014 | Never finaled issued May 2014, no final | 373 Arguello Bl | ground floor: re-build existing interior stair, remodel existing habitable space to new master bedroom & bth, new 1/2 bath. second floor: remodel ktichen & stair to ground floor. compliance with ordinance #155-13 not requiredDetails
ground floor: re-build existing interior stair, remodel existing habitable space to new master bedroom & bth, new 1/2 bath. second floor: remodel ktichen & stair to ground floor. compliance with ordinance #155-13 not required | $150,000 |
| Jul 23, 2013 | Completed final sign-off Feb 2014 | 34 Porter St | kitchen and bathroom renovation. replace (e) window in both two total. no structural work new electrical and new plumbing work.Details
kitchen and bathroom renovation. replace (e) window in both two total. no structural work new electrical and new plumbing work. | $45,000 |
| Oct 14, 2011 | Completed final sign-off May 2012 | 201 Vicente St | 1st floor: kitchen remodel with removal of 1 non-structural wall, partial powder rm remodel, minor dry rot repair. adding structural support for floor joists above. 2nd floor: master bath and guest bath remodel, relocation of washer/dryer closet.Details
1st floor: kitchen remodel with removal of 1 non-structural wall, partial powder rm remodel, minor dry rot repair. adding structural support for floor joists above. 2nd floor: master bath and guest bath remodel, relocation of washer/dryer closet. | $70,000 |
| Jul 28, 2011 | Completed final sign-off May 2012 | 209 Noe St | remodel of kitchen & 2 bathrooms to include addition of 2 new skylights and parapetsDetails
remodel of kitchen & 2 bathrooms to include addition of 2 new skylights and parapets | $75,000 |
| Aug 12, 2009 | Completed final sign-off Jan 2010 | 1 Lupine Av | remodel of existing bathroom - change out plumbing fixtures tile & electrical, provide high efficancy lights ore "manual on" occupancy sensor in bathroom.Details
remodel of existing bathroom - change out plumbing fixtures tile & electrical, provide high efficancy lights ore "manual on" occupancy sensor in bathroom. | $10,000 |
| Jun 16, 2004 | Completed final sign-off Apr 2005 | 2312 Greenwich St | residential remodel. remodel kitchen, remodel 2 baths, 1 structural wall-see structural eng calcs &Details
residential remodel. remodel kitchen, remodel 2 baths, 1 structural wall-see structural eng calcs & | $80,000 |
| Dec 9, 2003 | Completed final sign-off Dec 2004 | 36 Santa Ynez Av | renovation of (e) bsmt, upstairs bathroom, add 1 bath @ lower level,add paved patio in back yard,Details
renovation of (e) bsmt, upstairs bathroom, add 1 bath @ lower level,add paved patio in back yard, | $80,000 |