Back to kitchen remodel contractors
Harrold Square Remodeling
- Based in
- Daly City
- On San Francisco permits
- Apr 2004 to Sep 2016
- Last 24 months
- 0 permits filed
16 permits since 2000: 13 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 7 completed. Typically 0 days from filing to permit and 114 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 18, 2015 | Completed final sign-off Sep 2015 | 3439 26th St | kitchen remodel for 3439 26th street per 3r cc-7688 (page 3 of 6).Details
kitchen remodel for 3439 26th street per 3r cc-7688 (page 3 of 6). | $30,000 |
| Aug 19, 2013 | Completed final sign-off Feb 2014 | 3437 26th St | remodel kitchen same for same.Details
remodel kitchen same for same. | $30,000 |
| Aug 6, 2008 | Completed final sign-off Jan 2009 | 22 Staples Av | extend (e) windows. revision to permit application # 200807156691 to floor. one on rear bedroom, one in kitchen. wood framed not visible from the street. doors to be narrower or under same header size. remodel bedroom with new lights, outlets & insulation. no structural work. windows u-max =0.67Details
extend (e) windows. revision to permit application # 200807156691 to floor. one on rear bedroom, one in kitchen. wood framed not visible from the street. doors to be narrower or under same header size. remodel bedroom with new lights, outlets & insulation. no structural work. windows u-max =0.67 | $1,000 |
| Jul 15, 2008 | Completed final sign-off Jan 2009 | 22 Staples Av | kitchen remodel same for same all work to comply w/cbc, cmc, cec, cpc & tile 24. no structural work. some new lighting 50% min high efficacy.Details
kitchen remodel same for same all work to comply w/cbc, cmc, cec, cpc & tile 24. no structural work. some new lighting 50% min high efficacy. | $10,000 |
| Feb 7, 2008 | Completed final sign-off Mar 2008 | 1227 York St | remodel current rear building with new insulation and window, drywall, kitchen cabinets, bath fixtures, 2 buildings on 1 lot. work to be done on rear building. comply w/nov 200842956.Details
remodel current rear building with new insulation and window, drywall, kitchen cabinets, bath fixtures, 2 buildings on 1 lot. work to be done on rear building. comply w/nov 200842956. | $2,500 |
| Apr 23, 2004 | Completed final sign-off Jun 2004 | 73 Germania St | replace 1 window, in kitchen facing rear.Details
replace 1 window, in kitchen facing rear. | $350 |
| Apr 16, 2004 | Completed final sign-off Jun 2004 | 73 Germania St | remodel kitchen, add 1/2 bath in (e) closet,no change to kitchen wallsDetails
remodel kitchen, add 1/2 bath in (e) closet,no change to kitchen walls | $10,000 |