Back to bathroom remodel contractors
Harrold Square Remodeling
- Based in
- Daly City
- On San Francisco permits
- Apr 2004 to Sep 2016
- Last 24 months
- 0 permits filed
16 permits since 2000: 13 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
6 bathroom remodel permits: 4 completed, 1 never finaled, 1 expired or cancelled. Typically 2 days from filing to permit and 78 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 30, 2016 | Expired or cancelled expired Mar 2018 | 467 Gold Mine Dr | remodel of two existing bathrooms. one 6 ft wide wall to be relcoated non-load bearing on 2nd floor. reducing size of guest bathroom to enlarge master bath & create a walk-in closet.Details
remodel of two existing bathrooms. one 6 ft wide wall to be relcoated non-load bearing on 2nd floor. reducing size of guest bathroom to enlarge master bath & create a walk-in closet. | $31,000 |
| Feb 7, 2013 | Completed final sign-off Jul 2013 | 49 Wilder St | knocking out 4 walls to extend rooms, making handicap bathroom that is already there, making den/playroom. storage area bigger, moving washer & dryer. adding door where existing windows is at now.Details
knocking out 4 walls to extend rooms, making handicap bathroom that is already there, making den/playroom. storage area bigger, moving washer & dryer. adding door where existing windows is at now. | $20,000 |
| Apr 11, 2008 | Completed final sign-off Apr 2009 | 525 Lombard St | remodel basement room into social room and bathroom, increase ceiling height fron 7'6" to 8', replace 2 windows fron single to double pane. rear elevation of buildingDetails
remodel basement room into social room and bathroom, increase ceiling height fron 7'6" to 8', replace 2 windows fron single to double pane. rear elevation of building | $40,000 |
| Feb 7, 2008 | Completed final sign-off Mar 2008 | 1227 York St | remodel current rear building with new insulation and window, drywall, kitchen cabinets, bath fixtures, 2 buildings on 1 lot. work to be done on rear building. comply w/nov 200842956.Details
remodel current rear building with new insulation and window, drywall, kitchen cabinets, bath fixtures, 2 buildings on 1 lot. work to be done on rear building. comply w/nov 200842956. | $2,500 |
| Jan 18, 2006 | Never finaled issued Jan 2006, no final | 11 Cragmont Av | den to bed/bath conversion.Details
den to bed/bath conversion. | $10,000 |
| Apr 16, 2004 | Completed final sign-off Jun 2004 | 73 Germania St | remodel kitchen, add 1/2 bath in (e) closet,no change to kitchen wallsDetails
remodel kitchen, add 1/2 bath in (e) closet,no change to kitchen walls | $10,000 |