Back to kitchen remodel contractors
Hammer Down Construction Co
- Based in
- South San Francisco
- On San Francisco permits
- Jul 2018 to Jan 2024
- Last 24 months
- 0 permits filed
10 permits since 2000: 5 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 2 completed, 1 never finaled. Typically 43 days from filing to permit and 132 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 19, 2019 | Never finaled issued Apr 2019, no final | 645 Stockton St | rehabilitate e kitchen, bath, washer dryerDetails
rehabilitate e kitchen, bath, washer dryer | $25,000 |
| Mar 5, 2019 | Completed final sign-off Jul 2019 | 1870 Pacific Av | unit 402 - convert existing kitchen to bedroom, relocate kitchen, rehabilitate existing bathroom, install washer/dryer.Details
unit 402 - convert existing kitchen to bedroom, relocate kitchen, rehabilitate existing bathroom, install washer/dryer. | $33,000 |
| Jan 30, 2019 | Completed final sign-off Sep 2019 | 1840 Clay St | unit 104 - convert (e) kitchen to study; relocate kitchen, rehabilitate (e) bathroom. install washer/dryerDetails
unit 104 - convert (e) kitchen to study; relocate kitchen, rehabilitate (e) bathroom. install washer/dryer | $36,000 |