Back to kitchen remodel contractors
Hakewill Construction Co. Inc.
- Based in
- San Rafael
- On San Francisco permits
- Jun 2000 to Jul 2026
- Last 24 months
- 6 permits filed
152 permits since 2000: 122 completed, 6 in progress, 18 never finaled, 6 expired or cancelled.
Of the 18 never-finaled permits, 7 are 5 to 10 years old, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
34 kitchen remodel permits: 30 completed, 1 in progress, 3 never finaled. Typically 1 days from filing to permit and 244 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 23, 2025 | In progress issued Dec 2025 | 1374 Chestnut St | unit 1374 and 1376; remove and replace in kind fixture and finishes in 2 kitchen and 2 bathrooms, no change in plumbing fixture count, no wall demolition or construction.Details
unit 1374 and 1376; remove and replace in kind fixture and finishes in 2 kitchen and 2 bathrooms, no change in plumbing fixture count, no wall demolition or construction. | $50,000 |
| Nov 17, 2022 | Completed final sign-off Jul 2023 | 64 Castro St | demo areas of walls and ceiling for new electrical work. insulate and patch walls and ceiling after electrical work, all floors. no work in kitchen or bathroom.Details
demo areas of walls and ceiling for new electrical work. insulate and patch walls and ceiling after electrical work, all floors. no work in kitchen or bathroom. | $25,000 |
| Oct 26, 2022 | Completed final sign-off Aug 2023 | 461 Pacheco St | remove portion of interior nonstructural wall to open kitchen to living, convert (e) half bath to full bath, relocate laundry machines.Details
remove portion of interior nonstructural wall to open kitchen to living, convert (e) half bath to full bath, relocate laundry machines. | $45,000 |
| Aug 12, 2021 | Completed final sign-off Oct 2022 | 3531 Divisadero St | replace 7 windows in kind on rear and side of building. remodel kitchen and bath in kind. add 1 new baths. 3 new skylights relocate roof access hatchDetails
replace 7 windows in kind on rear and side of building. remodel kitchen and bath in kind. add 1 new baths. 3 new skylights relocate roof access hatch | $350,000 |
| Aug 4, 2021 | Never finaled issued Aug 2021, no final | 1204 Stanyan St | minor kitchen remodel- new cabinets and countertops new appliances. minor bathroom remodel new tile in tub/shower new vanity.Details
minor kitchen remodel- new cabinets and countertops new appliances. minor bathroom remodel new tile in tub/shower new vanity. | $15,000 |
| Jul 21, 2021 | Completed final sign-off Oct 2021 | 1141 Cole St | remove wall btw dining rm and kitchen. provide new beam above (2nd floor)Details
remove wall btw dining rm and kitchen. provide new beam above (2nd floor) | $10,000 |
| Oct 1, 2019 | Completed final sign-off Aug 2020 | 636 Belvedere St | interior alter to the (e) 2nd floor in 2-story dwelling, including remodeling the kitchens & bathroom & powder room, expansion into (e) lightwell to expand (e) powder room. new windows to match & rep (e) new deck on grade and landscape.Details
interior alter to the (e) 2nd floor in 2-story dwelling, including remodeling the kitchens & bathroom & powder room, expansion into (e) lightwell to expand (e) powder room. new windows to match & rep (e) new deck on grade and landscape. | $45,000 |
| May 30, 2019 | Never finaled issued May 2019, no final | 783 Buena Vista West Av | remodel existing kitchen and bathroom at existing locations. new fixtures and finishes. 2nd floor update plumbing and lightingDetails
remodel existing kitchen and bathroom at existing locations. new fixtures and finishes. 2nd floor update plumbing and lighting | $80,000 |
| May 16, 2019 | Completed final sign-off Jan 2020 | 254 17th Av | renovation of kitchen and bathroom. replacement of existing windows. no structural work, no change to front facade of building.Details
renovation of kitchen and bathroom. replacement of existing windows. no structural work, no change to front facade of building. | $60,000 |
| Dec 27, 2018 | Completed final sign-off Dec 2019 | 2542 Washington St | remodel master bathroom- replace fixture and finishes. remodel guest bathroom, replace fixture and finish. remodle kitchen- replace fixture and finsihDetails
remodel master bathroom- replace fixture and finishes. remodel guest bathroom, replace fixture and finish. remodle kitchen- replace fixture and finsih | $150,000 |
| Apr 30, 2018 | Completed final sign-off Aug 2018 | 522 Ashbury St | add (10) recess lights in hall and kitchen. replace sink, toilet and tub in bathroom. replace window in wc. third floor condo.Details
add (10) recess lights in hall and kitchen. replace sink, toilet and tub in bathroom. replace window in wc. third floor condo. | $10,000 |
| Dec 8, 2017 | Completed final sign-off Oct 2018 | 141 Wawona St | 2st floor: remodel kitchen, relocate powder room and laundry, enlarge back patio door, add back window, fill side window. enlarge dining/family opening. replace stair railing, update electrical & lighting. 3rd floor: remodel master bathroom.Details
2st floor: remodel kitchen, relocate powder room and laundry, enlarge back patio door, add back window, fill side window. enlarge dining/family opening. replace stair railing, update electrical & lighting. 3rd floor: remodel master bathroom. | $70,000 |
| Nov 20, 2017 | Completed final sign-off Aug 2018 | 153 Clifford Tr | remodel kitchen & baths. extend floor arer into bld access (this floor only) <20 sqft. demo (1) 1.2 bath & (1) water closet. build (2) new full baths incld (1) shower, (1) tub/shower, new sinks, new toilets. new kitchen cabinets, relocate appliances. demo walls @ kitchenDetails
remodel kitchen & baths. extend floor arer into bld access (this floor only) <20 sqft. demo (1) 1.2 bath & (1) water closet. build (2) new full baths incld (1) shower, (1) tub/shower, new sinks, new toilets. new kitchen cabinets, relocate appliances. demo walls @ kitchen | $100,000 |
| Nov 30, 2016 | Completed final sign-off Feb 2017 | 1372 Florida St | minor kitchen remodel, new cabinets, countertops, floors & lighting.Details
minor kitchen remodel, new cabinets, countertops, floors & lighting. | $15,000 |
| Aug 17, 2016 | Completed final sign-off Jul 2017 | 137 Alma St | fill in rear side court on basement, 1st & 2nd flr. remodel kitchen/ family room, master bedroom suite & hall bathroom. add laundry room on 2nd flr. upgrade elect/heating systems. relocate stairs fron yard to basementDetails
fill in rear side court on basement, 1st & 2nd flr. remodel kitchen/ family room, master bedroom suite & hall bathroom. add laundry room on 2nd flr. upgrade elect/heating systems. relocate stairs fron yard to basement | $156,000 |
| Apr 15, 2015 | Completed final sign-off Dec 2015 | 638 Belvedere St | lower unit: remodel kitchen, bath, powder room, closet, laundry area. reinforce existing front bay. no change to front facadeDetails
lower unit: remodel kitchen, bath, powder room, closet, laundry area. reinforce existing front bay. no change to front facade | $50,000 |
| Mar 20, 2015 | Completed final sign-off Jul 2015 | 921 Oak St | interior kitchen remodel in 2nd floor unit of a 2 unit building. no change in sq. ft.Details
interior kitchen remodel in 2nd floor unit of a 2 unit building. no change in sq. ft. | $48,525 |
| Feb 25, 2015 | Completed final sign-off Mar 2016 | 1976 California St | unit #6: kitchen-bathroom remodel, new fixtures & appliances, 2 voluntary shear walls, work at ground floor; maher n/aDetails
unit #6: kitchen-bathroom remodel, new fixtures & appliances, 2 voluntary shear walls, work at ground floor; maher n/a | $35,000 |
| Sep 12, 2014 | Completed final sign-off Jun 2015 | 145 Alma St | add full bath to lower unit at kitchen area. convert toilet room to lauindry room at ground floorDetails
add full bath to lower unit at kitchen area. convert toilet room to lauindry room at ground floor | $30,000 |
| Sep 12, 2014 | Completed final sign-off Jun 2015 | 145 Alma St | replace windows in existing openings in-kind. remodel existing kitchen and bathroom.Details
replace windows in existing openings in-kind. remodel existing kitchen and bathroom. | $90,000 |
| Aug 7, 2014 | Completed final sign-off Apr 2015 | 15 Montalvo Av | first floor kitchen and bath remodel.Details
first floor kitchen and bath remodel. | $78,000 |
| Apr 16, 2013 | Completed final sign-off Oct 2013 | 788 16th Av | alteration to an (e) residence involving the re-configuration of an existing 1/f kitchen and office into a renovated kitchen, powder room and closet on the 2/f, a bathrm and walk-in closet will be reconfigured into 2 bathrms, (n) windows (double-hung wood) and a (n) wood door in kitcheDetails
alteration to an (e) residence involving the re-configuration of an existing 1/f kitchen and office into a renovated kitchen, powder room and closet on the 2/f, a bathrm and walk-in closet will be reconfigured into 2 bathrms, (n) windows (double-hung wood) and a (n) wood door in kitche | $137,000 |
| Jan 24, 2012 | Completed final sign-off Jul 2012 | 1451 Masonic Av | interior renovation @ kitchen - new cabients, finishes, appliances replaced,new fixtures @ (e) powder room. changes to exterior openings at south & west elevations, side & rear windows & doors replaced, bay window & new back door. no change to (e) sq footage.Details
interior renovation @ kitchen - new cabients, finishes, appliances replaced,new fixtures @ (e) powder room. changes to exterior openings at south & west elevations, side & rear windows & doors replaced, bay window & new back door. no change to (e) sq footage. | $72,900 |
| Jul 30, 2010 | Completed final sign-off Nov 2010 | 3500 Lawton St | kitchen & bathroom remodel, interior work only, new cabinets, lighting & floor covering @ kitchen, bathroom work includes new cabinets, toilet & enlarged shower.Details
kitchen & bathroom remodel, interior work only, new cabinets, lighting & floor covering @ kitchen, bathroom work includes new cabinets, toilet & enlarged shower. | $35,000 |
| May 19, 2008 | Completed final sign-off Jan 2009 | 4139 24th St | remodel lower & upper level, kitchen, dining room, 1 bathroom & sun porch. replace (e) handrail in front entry, reconstruct exterior rear stairs, same size & location, install (n) trench drain, replace 8 (e) rear windows.Details
remodel lower & upper level, kitchen, dining room, 1 bathroom & sun porch. replace (e) handrail in front entry, reconstruct exterior rear stairs, same size & location, install (n) trench drain, replace 8 (e) rear windows. | $120,000 |
| Apr 1, 2008 | Completed final sign-off Mar 2009 | 1616 Shrader St | remodel ex. kitchen, master bedroom, masterbath, relocate some doors and windows. drop partial ceiling in master bedroom and open new attic space to connect ex. attic space.Details
remodel ex. kitchen, master bedroom, masterbath, relocate some doors and windows. drop partial ceiling in master bedroom and open new attic space to connect ex. attic space. | $140,000 |
| Feb 20, 2008 | Completed final sign-off Jul 2008 | 1807 Jones St | work on #1807. remove/replace kitchen cabinets, no change in layout. no new lighting.Details
work on #1807. remove/replace kitchen cabinets, no change in layout. no new lighting. | $20,000 |
| Jun 20, 2007 | Completed final sign-off Apr 2008 | 632 11th Av | interior remodel - kitchen remodel, reconfiguration of bathrooms and bedrooms per plan.Details
interior remodel - kitchen remodel, reconfiguration of bathrooms and bedrooms per plan. | $240,000 |
| Jun 5, 2006 | Completed final sign-off Jan 2007 | 2247 Bay St | all work in unit 2249 only. interior remodel of (e) building including kitchen bathroom & relocation of laundry room. replace 6 (e) windows with double insulated units. no change in size or style. install new forced air heat system.Details
all work in unit 2249 only. interior remodel of (e) building including kitchen bathroom & relocation of laundry room. replace 6 (e) windows with double insulated units. no change in size or style. install new forced air heat system. | $100,000 |
| May 9, 2006 | Completed final sign-off Oct 2007 | 15 Hill Point Av | expansion & remodel of (e) kitchen and nook at 2nd story.; new master bathroom addition & remodel of (e) master bedroom & (e) bath at 3rd story. minor structural & const. alterations at 1st story.Details
expansion & remodel of (e) kitchen and nook at 2nd story.; new master bathroom addition & remodel of (e) master bedroom & (e) bath at 3rd story. minor structural & const. alterations at 1st story. | $125,000 |
| Dec 12, 2005 | Completed final sign-off May 2008 | 50 Pemberton Pl | remodel main level (kitchen, living, dining) add deck partial window replacement total of 8 windows per plans.Details
remodel main level (kitchen, living, dining) add deck partial window replacement total of 8 windows per plans. | $250,000 |
| Dec 18, 2003 | Completed final sign-off Aug 2004 | 3868 Jackson St | remodel kitchen - structural work & 3 bathDetails
remodel kitchen - structural work & 3 bath | $40,000 |
| Apr 18, 2002 | Never finaled issued Jun 2002, no final | 936 Noe St | remodel fo kitchen including minor structural, plumbing, door, window, new powder rm. no new sqfDetails
remodel fo kitchen including minor structural, plumbing, door, window, new powder rm. no new sqf | $20,000 |
| Mar 22, 2001 | Completed final sign-off Dec 2001 | 7 Fernwood Dr | remodel kitchen, bathrm & closet, demo partition, non-bearing wallsDetails
remodel kitchen, bathrm & closet, demo partition, non-bearing walls | $60,000 |