Back to bathroom remodel contractors
Hakewill Construction Co. Inc.
- Based in
- San Rafael
- On San Francisco permits
- Jun 2000 to Jul 2026
- Last 24 months
- 6 permits filed
152 permits since 2000: 122 completed, 6 in progress, 18 never finaled, 6 expired or cancelled.
Of the 18 never-finaled permits, 7 are 5 to 10 years old, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
50 bathroom remodel permits: 41 completed, 4 in progress, 4 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 239 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 31, 2026 | In progress issued Jul 2026 | 1976 California St | unit 5 on ground floor - partial remodel bathroom: new electrical, new sink, new drywall(only). tub and toilet to remain. in kindDetails
unit 5 on ground floor - partial remodel bathroom: new electrical, new sink, new drywall(only). tub and toilet to remain. in kind | $15,000 |
| Jul 31, 2026 | In progress issued Jul 2026 | 1976 California St | unit 3 on 3rd floor - remodel bathroom, new fixtures and finishes in kindDetails
unit 3 on 3rd floor - remodel bathroom, new fixtures and finishes in kind | $35,000 |
| Feb 5, 2026 | In progress issued Feb 2026 | 1374 Chestnut St | revision ot #202512232460: #1376 - (n) 336 sqft conditioned media room w/ media room w/ wetbar, full bath & laundry on 1/f. add additional bath in each unit. install new furnaces, water heaters, new windows in (e) location. no structural work, no change to envelope.Details
revision ot #202512232460: #1376 - (n) 336 sqft conditioned media room w/ media room w/ wetbar, full bath & laundry on 1/f. add additional bath in each unit. install new furnaces, water heaters, new windows in (e) location. no structural work, no change to envelope. | $300,000 |
| Dec 23, 2025 | In progress issued Dec 2025 | 1374 Chestnut St | unit 1374 and 1376; remove and replace in kind fixture and finishes in 2 kitchen and 2 bathrooms, no change in plumbing fixture count, no wall demolition or construction.Details
unit 1374 and 1376; remove and replace in kind fixture and finishes in 2 kitchen and 2 bathrooms, no change in plumbing fixture count, no wall demolition or construction. | $50,000 |
| Nov 17, 2022 | Completed final sign-off Jul 2023 | 64 Castro St | demo areas of walls and ceiling for new electrical work. insulate and patch walls and ceiling after electrical work, all floors. no work in kitchen or bathroom.Details
demo areas of walls and ceiling for new electrical work. insulate and patch walls and ceiling after electrical work, all floors. no work in kitchen or bathroom. | $25,000 |
| Oct 26, 2022 | Completed final sign-off Aug 2023 | 461 Pacheco St | remove portion of interior nonstructural wall to open kitchen to living, convert (e) half bath to full bath, relocate laundry machines.Details
remove portion of interior nonstructural wall to open kitchen to living, convert (e) half bath to full bath, relocate laundry machines. | $45,000 |
| May 26, 2022 | Completed final sign-off Mar 2023 | 254 17th Av | remodel 3rd fl bathroom and bedroom in upper unit. new fixtures and finishes. replace 1 existing window and 1 existing door with new marvin insulated units at rear.Details
remodel 3rd fl bathroom and bedroom in upper unit. new fixtures and finishes. replace 1 existing window and 1 existing door with new marvin insulated units at rear. | $40,000 |
| May 26, 2022 | Completed final sign-off Oct 2022 | 1451 Masonic Av | remodel existing ground floor bathroom, new fixtures and finishes. replace 4 existing rear faving windows in-kind with marvin clad insulated windows. no street facing workDetails
remodel existing ground floor bathroom, new fixtures and finishes. replace 4 existing rear faving windows in-kind with marvin clad insulated windows. no street facing work | $40,000 |
| Apr 21, 2022 | Completed final sign-off Jul 2023 | 265 Ewing Tr | remodel of (e) fist fl bathroom. replace (e) furnance w/ radiant heating at 1st and 2nd fl. replace (e) stair w/ (n) wood stair. upgrade and replace elect panel and subpanel. add addtional 345 sf of habitable space at ground floor.Details
remodel of (e) fist fl bathroom. replace (e) furnance w/ radiant heating at 1st and 2nd fl. replace (e) stair w/ (n) wood stair. upgrade and replace elect panel and subpanel. add addtional 345 sf of habitable space at ground floor. | $200,000 |
| Aug 12, 2021 | Completed final sign-off Oct 2022 | 3531 Divisadero St | replace 7 windows in kind on rear and side of building. remodel kitchen and bath in kind. add 1 new baths. 3 new skylights relocate roof access hatchDetails
replace 7 windows in kind on rear and side of building. remodel kitchen and bath in kind. add 1 new baths. 3 new skylights relocate roof access hatch | $350,000 |
| Aug 4, 2021 | Never finaled issued Aug 2021, no final | 1204 Stanyan St | minor kitchen remodel- new cabinets and countertops new appliances. minor bathroom remodel new tile in tub/shower new vanity.Details
minor kitchen remodel- new cabinets and countertops new appliances. minor bathroom remodel new tile in tub/shower new vanity. | $15,000 |
| Aug 20, 2020 | Completed final sign-off Dec 2020 | 1370 Florida St | basic bathroom (40 sf) remodel, tile work, new fixtures, cabinetry. no walls moving.Details
basic bathroom (40 sf) remodel, tile work, new fixtures, cabinetry. no walls moving. | $35,000 |
| Oct 1, 2019 | Completed final sign-off Aug 2020 | 636 Belvedere St | interior alter to the (e) 2nd floor in 2-story dwelling, including remodeling the kitchens & bathroom & powder room, expansion into (e) lightwell to expand (e) powder room. new windows to match & rep (e) new deck on grade and landscape.Details
interior alter to the (e) 2nd floor in 2-story dwelling, including remodeling the kitchens & bathroom & powder room, expansion into (e) lightwell to expand (e) powder room. new windows to match & rep (e) new deck on grade and landscape. | $45,000 |
| Sep 25, 2019 | Never finaled issued Sep 2019, no final | 256 17th Av | relocate laundry in garage to existing closet. add exhaust fan and light ot existing main bathroom, ventless dryer.Details
relocate laundry in garage to existing closet. add exhaust fan and light ot existing main bathroom, ventless dryer. | $2,500 |
| May 30, 2019 | Never finaled issued May 2019, no final | 783 Buena Vista West Av | remodel existing kitchen and bathroom at existing locations. new fixtures and finishes. 2nd floor update plumbing and lightingDetails
remodel existing kitchen and bathroom at existing locations. new fixtures and finishes. 2nd floor update plumbing and lighting | $80,000 |
| May 16, 2019 | Completed final sign-off Jan 2020 | 254 17th Av | renovation of kitchen and bathroom. replacement of existing windows. no structural work, no change to front facade of building.Details
renovation of kitchen and bathroom. replacement of existing windows. no structural work, no change to front facade of building. | $60,000 |
| May 2, 2019 | Completed final sign-off May 2023 | 117 Newman St | replace (e) exterior entry stair, driveway & garage door. restore street facade. add (n) 3rd story bedroom, office, bath & stair. add (2) skylightsDetails
replace (e) exterior entry stair, driveway & garage door. restore street facade. add (n) 3rd story bedroom, office, bath & stair. add (2) skylights | $356,000 |
| Dec 27, 2018 | Completed final sign-off Dec 2019 | 2542 Washington St | remodel master bathroom- replace fixture and finishes. remodel guest bathroom, replace fixture and finish. remodle kitchen- replace fixture and finsihDetails
remodel master bathroom- replace fixture and finishes. remodel guest bathroom, replace fixture and finish. remodle kitchen- replace fixture and finsih | $150,000 |
| Apr 30, 2018 | Completed final sign-off Aug 2018 | 522 Ashbury St | add (10) recess lights in hall and kitchen. replace sink, toilet and tub in bathroom. replace window in wc. third floor condo.Details
add (10) recess lights in hall and kitchen. replace sink, toilet and tub in bathroom. replace window in wc. third floor condo. | $10,000 |
| Dec 22, 2017 | Completed final sign-off Jul 2019 | 1967 Pine St | int. remodel at (e) 1/2 bath at mezz level. int. remodel to rpelace (e0 stairs in-kind wih open riser stairs. int. remodel at (e) bedroom & bathroom & (e) wine closet to (n) laundry at first fl. int. remodel at (e) laundry to (n) wine cellar. no work at ground fl.Details
int. remodel at (e) 1/2 bath at mezz level. int. remodel to rpelace (e0 stairs in-kind wih open riser stairs. int. remodel at (e) bedroom & bathroom & (e) wine closet to (n) laundry at first fl. int. remodel at (e) laundry to (n) wine cellar. no work at ground fl. | $48,000 |
| Dec 8, 2017 | Completed final sign-off Oct 2018 | 141 Wawona St | 2st floor: remodel kitchen, relocate powder room and laundry, enlarge back patio door, add back window, fill side window. enlarge dining/family opening. replace stair railing, update electrical & lighting. 3rd floor: remodel master bathroom.Details
2st floor: remodel kitchen, relocate powder room and laundry, enlarge back patio door, add back window, fill side window. enlarge dining/family opening. replace stair railing, update electrical & lighting. 3rd floor: remodel master bathroom. | $70,000 |
| Nov 20, 2017 | Completed final sign-off Aug 2018 | 153 Clifford Tr | remodel kitchen & baths. extend floor arer into bld access (this floor only) <20 sqft. demo (1) 1.2 bath & (1) water closet. build (2) new full baths incld (1) shower, (1) tub/shower, new sinks, new toilets. new kitchen cabinets, relocate appliances. demo walls @ kitchenDetails
remodel kitchen & baths. extend floor arer into bld access (this floor only) <20 sqft. demo (1) 1.2 bath & (1) water closet. build (2) new full baths incld (1) shower, (1) tub/shower, new sinks, new toilets. new kitchen cabinets, relocate appliances. demo walls @ kitchen | $100,000 |
| May 2, 2017 | Completed final sign-off Nov 2017 | 921 Oak St | remodel of bathroom, new fixtures/tile, remodel powder roomDetails
remodel of bathroom, new fixtures/tile, remodel powder room | $15,000 |
| Aug 17, 2016 | Completed final sign-off Jul 2017 | 137 Alma St | fill in rear side court on basement, 1st & 2nd flr. remodel kitchen/ family room, master bedroom suite & hall bathroom. add laundry room on 2nd flr. upgrade elect/heating systems. relocate stairs fron yard to basementDetails
fill in rear side court on basement, 1st & 2nd flr. remodel kitchen/ family room, master bedroom suite & hall bathroom. add laundry room on 2nd flr. upgrade elect/heating systems. relocate stairs fron yard to basement | $156,000 |
| Mar 25, 2016 | Completed final sign-off Jun 2016 | 3363 22nd St | rear building - dryrot repair at rear wall approx 7'x8' area , bathroom remodel - new fixtures & finishes in existing location.Details
rear building - dryrot repair at rear wall approx 7'x8' area , bathroom remodel - new fixtures & finishes in existing location. | $20,000 |
| Aug 4, 2015 | Completed final sign-off Dec 2016 | 3219 Folsom St | construct portion of garage to conditioned living space, add bay window, bath and 2 bedrooms, move laundry.Details
construct portion of garage to conditioned living space, add bay window, bath and 2 bedrooms, move laundry. | $70,000 |
| Apr 15, 2015 | Completed final sign-off Dec 2015 | 638 Belvedere St | lower unit: remodel kitchen, bath, powder room, closet, laundry area. reinforce existing front bay. no change to front facadeDetails
lower unit: remodel kitchen, bath, powder room, closet, laundry area. reinforce existing front bay. no change to front facade | $50,000 |
| Mar 26, 2015 | Completed final sign-off Nov 2016 | 2230 Bush St | proposed work is to add a bedroom & bathroom @ the roof level & to add a rear roof deck. not visible from public right of way. no change to number of dwelling unit. no change to maximum height. ** maher: compliance with ordinance no# 155-13 not required **Details
proposed work is to add a bedroom & bathroom @ the roof level & to add a rear roof deck. not visible from public right of way. no change to number of dwelling unit. no change to maximum height. ** maher: compliance with ordinance no# 155-13 not required ** | $90,000 |
| Mar 12, 2015 | Completed final sign-off Jul 2015 | 552 Page St | master bathroom remodel on 2nd floor. fixtures and finishes only. no walls to be moved.Details
master bathroom remodel on 2nd floor. fixtures and finishes only. no walls to be moved. | $20,000 |
| Feb 25, 2015 | Completed final sign-off Mar 2016 | 1976 California St | unit #6: kitchen-bathroom remodel, new fixtures & appliances, 2 voluntary shear walls, work at ground floor; maher n/aDetails
unit #6: kitchen-bathroom remodel, new fixtures & appliances, 2 voluntary shear walls, work at ground floor; maher n/a | $35,000 |
| Dec 19, 2014 | Completed final sign-off Jun 2015 | 147 Alma St | remodel existing bathroom new fixture in same location new finishes working on unit a; no structural workDetails
remodel existing bathroom new fixture in same location new finishes working on unit a; no structural work | $15,000 |
| Sep 12, 2014 | Completed final sign-off Jun 2015 | 145 Alma St | add full bath to lower unit at kitchen area. convert toilet room to lauindry room at ground floorDetails
add full bath to lower unit at kitchen area. convert toilet room to lauindry room at ground floor | $30,000 |
| Sep 12, 2014 | Completed final sign-off Jun 2015 | 145 Alma St | replace windows in existing openings in-kind. remodel existing kitchen and bathroom.Details
replace windows in existing openings in-kind. remodel existing kitchen and bathroom. | $90,000 |
| Aug 7, 2014 | Completed final sign-off Apr 2015 | 15 Montalvo Av | first floor kitchen and bath remodel.Details
first floor kitchen and bath remodel. | $78,000 |
| Jul 21, 2014 | Completed final sign-off May 2015 | 707 Cole St | alteration lower floor rooms (interior work) and add 1/2 bathDetails
alteration lower floor rooms (interior work) and add 1/2 bath | $100,000 |
| Jun 16, 2014 | Completed final sign-off Aug 2014 | 246 Stillings Av | remodel extg lower level bathroom. new fixtures, minor patch of drywall and paint.Details
remodel extg lower level bathroom. new fixtures, minor patch of drywall and paint. | $11,000 |
| May 23, 2014 | Completed final sign-off Oct 2014 | 634 Ashbury St | remodel bathroom and wc room new fixtures and finishes, new shower, toilet sink at top floorDetails
remodel bathroom and wc room new fixtures and finishes, new shower, toilet sink at top floor | $30,000 |
| Apr 29, 2013 | Completed final sign-off Aug 2013 | 44 Grattan St | remodel new fixtures and finishes at 2 existinb bathrooms in 3rd flr, no structural workDetails
remodel new fixtures and finishes at 2 existinb bathrooms in 3rd flr, no structural work | $65,000 |
| Jul 30, 2010 | Completed final sign-off Nov 2010 | 3500 Lawton St | kitchen & bathroom remodel, interior work only, new cabinets, lighting & floor covering @ kitchen, bathroom work includes new cabinets, toilet & enlarged shower.Details
kitchen & bathroom remodel, interior work only, new cabinets, lighting & floor covering @ kitchen, bathroom work includes new cabinets, toilet & enlarged shower. | $35,000 |
| Feb 9, 2009 | Completed final sign-off Apr 2009 | 2 18th Av | fixtures and finishes will be changed in master bath. no wall cabinet or locations changed. no change in ouside.Details
fixtures and finishes will be changed in master bath. no wall cabinet or locations changed. no change in ouside. | $50,000 |
| May 19, 2008 | Completed final sign-off Jan 2009 | 4139 24th St | remodel lower & upper level, kitchen, dining room, 1 bathroom & sun porch. replace (e) handrail in front entry, reconstruct exterior rear stairs, same size & location, install (n) trench drain, replace 8 (e) rear windows.Details
remodel lower & upper level, kitchen, dining room, 1 bathroom & sun porch. replace (e) handrail in front entry, reconstruct exterior rear stairs, same size & location, install (n) trench drain, replace 8 (e) rear windows. | $120,000 |
| Jan 31, 2008 | Completed final sign-off Aug 2008 | 3919 Washington St | interior bathroom remodel. replace plumbing fixtures, replace tile floors with marble, replace outlets all gfi with occupancy sensor for lighting or fluorescent light. no structural work.Details
interior bathroom remodel. replace plumbing fixtures, replace tile floors with marble, replace outlets all gfi with occupancy sensor for lighting or fluorescent light. no structural work. | $25,000 |
| Jun 20, 2007 | Completed final sign-off Apr 2008 | 632 11th Av | interior remodel - kitchen remodel, reconfiguration of bathrooms and bedrooms per plan.Details
interior remodel - kitchen remodel, reconfiguration of bathrooms and bedrooms per plan. | $240,000 |
| Mar 27, 2007 | Completed final sign-off May 2008 | 50 Pemberton Pl | remodel (e) master bedroom, raise (e) ceiling, remodel (e) guest bath, add new skylight. remodel (e) master bathroom.Details
remodel (e) master bedroom, raise (e) ceiling, remodel (e) guest bath, add new skylight. remodel (e) master bathroom. | $120,000 |
| Dec 11, 2006 | Never finaled issued Dec 2006, no final | 127 Castenada Av | revision to app#200611066950. original application should have stated three bathrooms, not one .Details
revision to app#200611066950. original application should have stated three bathrooms, not one . | |
| Nov 6, 2006 | Completed final sign-off Jun 2007 | 127 Castenada Av | new tile work in one bathroom. new toilet, new sink, new tub replace fixture in same bathroomDetails
new tile work in one bathroom. new toilet, new sink, new tub replace fixture in same bathroom | $30,000 |
| Jun 5, 2006 | Completed final sign-off Jan 2007 | 2247 Bay St | all work in unit 2249 only. interior remodel of (e) building including kitchen bathroom & relocation of laundry room. replace 6 (e) windows with double insulated units. no change in size or style. install new forced air heat system.Details
all work in unit 2249 only. interior remodel of (e) building including kitchen bathroom & relocation of laundry room. replace 6 (e) windows with double insulated units. no change in size or style. install new forced air heat system. | $100,000 |
| May 9, 2006 | Completed final sign-off Oct 2007 | 15 Hill Point Av | expansion & remodel of (e) kitchen and nook at 2nd story.; new master bathroom addition & remodel of (e) master bedroom & (e) bath at 3rd story. minor structural & const. alterations at 1st story.Details
expansion & remodel of (e) kitchen and nook at 2nd story.; new master bathroom addition & remodel of (e) master bedroom & (e) bath at 3rd story. minor structural & const. alterations at 1st story. | $125,000 |
| Aug 17, 2004 | Expired or cancelled expired Oct 2007 | 783 36th Av | revision to #200309124687. reconfigure bathrooms on 2/f. replace window. rebuild stairs. intall newDetails
revision to #200309124687. reconfigure bathrooms on 2/f. replace window. rebuild stairs. intall new | $15,000 |
| Dec 18, 2003 | Completed final sign-off Aug 2004 | 3868 Jackson St | remodel kitchen - structural work & 3 bathDetails
remodel kitchen - structural work & 3 bath | $40,000 |