Back to kitchen remodel contractors
H C L Construction Inc.
- Based in
- Ross
- On San Francisco permits
- Apr 2003 to Sep 2025
- Last 24 months
- 1 permit filed
81 permits since 2000: 64 completed, 6 never finaled, 11 expired or cancelled.
Of the 6 never-finaled permits, 2 are 3 to 5 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
15 kitchen remodel permits: 11 completed, 2 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 194 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 14, 2022 | Completed final sign-off Jun 2023 | 747 22nd Av | main level interior remodel of kitchen and bathroom. new 200 amp electrical panel at lower level.Details
main level interior remodel of kitchen and bathroom. new 200 amp electrical panel at lower level. | $75,000 |
| Nov 17, 2021 | Completed final sign-off Jun 2022 | 2432 Pine St | updating the kitchen, bathrooms and hard wood floors w/new cabintry, fixtues and tile, appliances. remodeling kitchen & bathorom, in-kind, to comply with cec 150.0k3 & 150.0k5.Details
updating the kitchen, bathrooms and hard wood floors w/new cabintry, fixtues and tile, appliances. remodeling kitchen & bathorom, in-kind, to comply with cec 150.0k3 & 150.0k5. | $125,000 |
| Jul 22, 2021 | Completed final sign-off Dec 2021 | 1039 Cole St | interior remodel lower level, replace (e) waste lateral to (e) trench drain @ rear door/riser in (e) laundry to facilitate flow/reduce backups; main level, kitchen remodel; upper level, expand half bath to full bath, add washer/dryer, remodel closet/study. trench drain @ garage door. replace sewer lDetails
interior remodel lower level, replace (e) waste lateral to (e) trench drain @ rear door/riser in (e) laundry to facilitate flow/reduce backups; main level, kitchen remodel; upper level, expand half bath to full bath, add washer/dryer, remodel closet/study. trench drain @ garage door. replace sewer l | $80,000 |
| Apr 29, 2021 | Completed final sign-off Mar 2023 | 666 Post St | remodel of (e) kitchen and bathroom. no structural work. like to like, no changes/moving walls.Details
remodel of (e) kitchen and bathroom. no structural work. like to like, no changes/moving walls. | $50,000 |
| Nov 30, 2016 | Completed final sign-off Jul 2018 | 712 Castro St | interior remodeling per plan. relocate dining room and kitchen on 2nd floor. remodel (e) family room/laundry at ground flr. remodel (e) bathroom at ground floor. remove all (e) brick fireplaces. foundation approved under 201610210946Details
interior remodeling per plan. relocate dining room and kitchen on 2nd floor. remodel (e) family room/laundry at ground flr. remodel (e) bathroom at ground floor. remove all (e) brick fireplaces. foundation approved under 201610210946 | $70,000 |
| May 11, 2016 | Expired or cancelled expired Nov 2018 | 3336 23rd St | interior remodel (n) bedroom, (n) bath, (n) family room, remodel laundry @ lower level. remodel existing bathroom and kitchen on main levelDetails
interior remodel (n) bedroom, (n) bath, (n) family room, remodel laundry @ lower level. remodel existing bathroom and kitchen on main level | $50,000 |
| Aug 6, 2014 | Never finaled issued Aug 2014, no final | 45 Richland Av | interior renovation: (1) infill under sun room; (2) lower floor – 1 (n) bed & bath; (3) top floor – 1 (n) bath and (e) 3 bedrooms + 1 (e) bath; middle floor: open up space for renovated kitchen/liv areaDetails
interior renovation: (1) infill under sun room; (2) lower floor – 1 (n) bed & bath; (3) top floor – 1 (n) bath and (e) 3 bedrooms + 1 (e) bath; middle floor: open up space for renovated kitchen/liv area | $300,000 |
| Nov 5, 2013 | Completed final sign-off Dec 2013 | 631 Folsom St | penthouse - 22nd floor - rework kitchen cabinets, create opening in non structural wall between kitchen & stairwell.Details
penthouse - 22nd floor - rework kitchen cabinets, create opening in non structural wall between kitchen & stairwell. | $10,000 |
| Apr 15, 2013 | Completed final sign-off Oct 2013 | 625 Grand View Av | renovation of (e) kitchen and guest bath in-kind. replace entry door.Details
renovation of (e) kitchen and guest bath in-kind. replace entry door. | $45,000 |
| Apr 1, 2013 | Completed final sign-off Jun 2013 | 260 Clara St | renovation of kitchen in kind. replace cabinets and instll new appliances. no structural work. bring (e) electrical no code. no commercial use.Details
renovation of kitchen in kind. replace cabinets and instll new appliances. no structural work. bring (e) electrical no code. no commercial use. | $20,000 |
| Aug 27, 2012 | Completed final sign-off Nov 2013 | 3663 17th St | renovation of existing kitchen in kind on the 2nd floor.Details
renovation of existing kitchen in kind on the 2nd floor. | $9,012 |
| Mar 14, 2006 | Completed final sign-off Nov 2006 | 115 Wool St | demo ground floor illegal unit & first floor kitchen & bathroom, rear stairs. construction of interior stair, new bath & kitchen,(1st fl) new const. of ground floor bath, utility & master bath. 1-hour const in garage. re-construction of rear stair.Details
demo ground floor illegal unit & first floor kitchen & bathroom, rear stairs. construction of interior stair, new bath & kitchen,(1st fl) new const. of ground floor bath, utility & master bath. 1-hour const in garage. re-construction of rear stair. | $125,000 |
| Jul 29, 2005 | Never finaled issued Jul 2005, no final | 3960 Folsom St | renovation of kitchen & bathroom (in kind) to include new cabinets, sinks, lighting etc.Details
renovation of kitchen & bathroom (in kind) to include new cabinets, sinks, lighting etc. | $25,000 |
| Sep 24, 2003 | Expired or cancelled expired May 2006 | 1097 Green St | renovation of kitchen in kindDetails
renovation of kitchen in kind | $20,000 |
| May 12, 2003 | Completed final sign-off Aug 2003 | 78 Mars St | kitchen and bth renovation in kind in lower unitDetails
kitchen and bth renovation in kind in lower unit | $20,000 |