Back to bathroom remodel contractors
H C L Construction Inc.
- Based in
- Ross
- On San Francisco permits
- Apr 2003 to Sep 2025
- Last 24 months
- 1 permit filed
81 permits since 2000: 64 completed, 6 never finaled, 11 expired or cancelled.
Of the 6 never-finaled permits, 2 are 3 to 5 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
27 bathroom remodel permits: 23 completed, 2 never finaled, 2 expired or cancelled. Typically 4 days from filing to permit and 144 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 9, 2024 | Completed final sign-off Jul 2024 | 712 Castro St | bathroom remodel. no wall removal on the top floorDetails
bathroom remodel. no wall removal on the top floor | $20,000 |
| Feb 16, 2024 | Completed final sign-off Jun 2024 | 635 Waller St | remodel existing bathroom and add a new bathroom and relocate washer/dryer on 2/fDetails
remodel existing bathroom and add a new bathroom and relocate washer/dryer on 2/f | $30,000 |
| Nov 14, 2022 | Completed final sign-off Jun 2023 | 747 22nd Av | main level interior remodel of kitchen and bathroom. new 200 amp electrical panel at lower level.Details
main level interior remodel of kitchen and bathroom. new 200 amp electrical panel at lower level. | $75,000 |
| Nov 17, 2021 | Completed final sign-off Jun 2022 | 2432 Pine St | updating the kitchen, bathrooms and hard wood floors w/new cabintry, fixtues and tile, appliances. remodeling kitchen & bathorom, in-kind, to comply with cec 150.0k3 & 150.0k5.Details
updating the kitchen, bathrooms and hard wood floors w/new cabintry, fixtues and tile, appliances. remodeling kitchen & bathorom, in-kind, to comply with cec 150.0k3 & 150.0k5. | $125,000 |
| Jul 22, 2021 | Completed final sign-off Dec 2021 | 1039 Cole St | interior remodel lower level, replace (e) waste lateral to (e) trench drain @ rear door/riser in (e) laundry to facilitate flow/reduce backups; main level, kitchen remodel; upper level, expand half bath to full bath, add washer/dryer, remodel closet/study. trench drain @ garage door. replace sewer lDetails
interior remodel lower level, replace (e) waste lateral to (e) trench drain @ rear door/riser in (e) laundry to facilitate flow/reduce backups; main level, kitchen remodel; upper level, expand half bath to full bath, add washer/dryer, remodel closet/study. trench drain @ garage door. replace sewer l | $80,000 |
| Jul 16, 2021 | Completed final sign-off Dec 2021 | 129 21st Av | change tub shower in bathroom. expand drain size to meet building requirements for a shower drain. add three can ceiling lights. no str work, comply with 150.0 (k)5Details
change tub shower in bathroom. expand drain size to meet building requirements for a shower drain. add three can ceiling lights. no str work, comply with 150.0 (k)5 | $10,000 |
| Apr 29, 2021 | Completed final sign-off Mar 2023 | 666 Post St | remodel of (e) kitchen and bathroom. no structural work. like to like, no changes/moving walls.Details
remodel of (e) kitchen and bathroom. no structural work. like to like, no changes/moving walls. | $50,000 |
| Aug 24, 2020 | Completed final sign-off Nov 2020 | 840 Powell St | unit 602: bathroom renovation. no new fixtures and no structural work.Details
unit 602: bathroom renovation. no new fixtures and no structural work. | $5,000 |
| Sep 27, 2018 | Completed final sign-off Nov 2018 | 620 El Camino Del Mar | installation of steam unit in 2nd floor iffice bathroom. no change to bathroom layout.Details
installation of steam unit in 2nd floor iffice bathroom. no change to bathroom layout. | $10,000 |
| Nov 30, 2017 | Completed final sign-off Feb 2019 | 566 Lombard St | unit #7: renovation of existing apartment in conjunction with soft story(reference bpa# 201706068550) retrofit work; incorporated additional square footage and add a bedroom, renovate bathroom.Details
unit #7: renovation of existing apartment in conjunction with soft story(reference bpa# 201706068550) retrofit work; incorporated additional square footage and add a bedroom, renovate bathroom. | $46,000 |
| Nov 30, 2016 | Completed final sign-off Jul 2018 | 712 Castro St | interior remodeling per plan. relocate dining room and kitchen on 2nd floor. remodel (e) family room/laundry at ground flr. remodel (e) bathroom at ground floor. remove all (e) brick fireplaces. foundation approved under 201610210946Details
interior remodeling per plan. relocate dining room and kitchen on 2nd floor. remodel (e) family room/laundry at ground flr. remodel (e) bathroom at ground floor. remove all (e) brick fireplaces. foundation approved under 201610210946 | $70,000 |
| Jul 1, 2016 | Completed final sign-off Jun 2018 | 179 Carl St | minor remodel on 2nd fl master bathroom, add bathroom @ 2nd fl, convert closet to laundry rm & add 90 sq ft to rear bedroom by extend 2nd fl @ rear & side.Details
minor remodel on 2nd fl master bathroom, add bathroom @ 2nd fl, convert closet to laundry rm & add 90 sq ft to rear bedroom by extend 2nd fl @ rear & side. | $84,000 |
| May 11, 2016 | Completed final sign-off Oct 2016 | 129 21st Av | revision to app#201603111868. remove fire rated corridor connecting new ground floor rooms to street. provide safe dispersal area in yard as alteration per cbc 1027.5 change half bath to full bath.Details
revision to app#201603111868. remove fire rated corridor connecting new ground floor rooms to street. provide safe dispersal area in yard as alteration per cbc 1027.5 change half bath to full bath. | |
| May 11, 2016 | Expired or cancelled expired Nov 2018 | 3336 23rd St | interior remodel (n) bedroom, (n) bath, (n) family room, remodel laundry @ lower level. remodel existing bathroom and kitchen on main levelDetails
interior remodel (n) bedroom, (n) bath, (n) family room, remodel laundry @ lower level. remodel existing bathroom and kitchen on main level | $50,000 |
| Mar 11, 2016 | Completed final sign-off Oct 2016 | 129 21st Av | 1st fl remodel, new office, new gym, new playroom, new den, remodel garage, bathDetails
1st fl remodel, new office, new gym, new playroom, new den, remodel garage, bath | $10,000 |
| Feb 4, 2016 | Completed final sign-off Jun 2017 | 1960 08th Av | renovation of 2 bathrooms in kind.Details
renovation of 2 bathrooms in kind. | $60,000 |
| Feb 4, 2016 | Expired or cancelled withdrawn May 2016 | 129 21st Av | renovation of lower floor. new play, new bathroom, new offfice and new excersice room.Details
renovation of lower floor. new play, new bathroom, new offfice and new excersice room. | $80,000 |
| Jun 30, 2015 | Completed final sign-off Oct 2015 | 625 Grand View Av | renovation of 1/f bathroom in kind and as per drawings.Details
renovation of 1/f bathroom in kind and as per drawings. | $30,000 |
| Jan 21, 2015 | Completed final sign-off Jul 2015 | 389 Upper Tr | convert extg media room to bedroom. remodel extg bathroom. change out sliding door for new bifold door.Details
convert extg media room to bedroom. remodel extg bathroom. change out sliding door for new bifold door. | $25,000 |
| Aug 6, 2014 | Never finaled issued Aug 2014, no final | 45 Richland Av | interior renovation: (1) infill under sun room; (2) lower floor – 1 (n) bed & bath; (3) top floor – 1 (n) bath and (e) 3 bedrooms + 1 (e) bath; middle floor: open up space for renovated kitchen/liv areaDetails
interior renovation: (1) infill under sun room; (2) lower floor – 1 (n) bed & bath; (3) top floor – 1 (n) bath and (e) 3 bedrooms + 1 (e) bath; middle floor: open up space for renovated kitchen/liv area | $300,000 |
| May 17, 2013 | Completed final sign-off Oct 2013 | 106 Coleridge St | renovation of 2nd floor bathroom, move shower to (e) skylight room. install new 2x2 skylight(op) in closet. remove and in-fill (e) windows by bedroom/skylight room.Details
renovation of 2nd floor bathroom, move shower to (e) skylight room. install new 2x2 skylight(op) in closet. remove and in-fill (e) windows by bedroom/skylight room. | $20,000 |
| May 10, 2013 | Completed final sign-off Apr 2015 | 106 Coleridge St | installation of drywall in 2 front rooms , renovation of () bathroom in kind. drywall is to close of wall after structure permit #201305015860Details
installation of drywall in 2 front rooms , renovation of () bathroom in kind. drywall is to close of wall after structure permit #201305015860 | $20,000 |
| Apr 15, 2013 | Completed final sign-off Oct 2013 | 625 Grand View Av | renovation of (e) kitchen and guest bath in-kind. replace entry door.Details
renovation of (e) kitchen and guest bath in-kind. replace entry door. | $45,000 |
| Oct 20, 2008 | Completed final sign-off Feb 2009 | 3990 Folsom St | renowation of (e) bathroom in kind.Details
renowation of (e) bathroom in kind. | $12,000 |
| Nov 15, 2007 | Completed final sign-off Mar 2008 | 3828 19th St | add new bathroom, remodel adjacent interior areas in lower unit of 2 units condo building.Details
add new bathroom, remodel adjacent interior areas in lower unit of 2 units condo building. | $18,000 |
| Mar 14, 2006 | Completed final sign-off Nov 2006 | 115 Wool St | demo ground floor illegal unit & first floor kitchen & bathroom, rear stairs. construction of interior stair, new bath & kitchen,(1st fl) new const. of ground floor bath, utility & master bath. 1-hour const in garage. re-construction of rear stair.Details
demo ground floor illegal unit & first floor kitchen & bathroom, rear stairs. construction of interior stair, new bath & kitchen,(1st fl) new const. of ground floor bath, utility & master bath. 1-hour const in garage. re-construction of rear stair. | $125,000 |
| Jul 29, 2005 | Never finaled issued Jul 2005, no final | 3960 Folsom St | renovation of kitchen & bathroom (in kind) to include new cabinets, sinks, lighting etc.Details
renovation of kitchen & bathroom (in kind) to include new cabinets, sinks, lighting etc. | $25,000 |