Back to kitchen remodel contractors
H & Bo Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Nov 2009 to Aug 2026
- Last 24 months
- 8 permits filed
118 permits since 2000: 101 completed, 2 in progress, 11 never finaled, 4 expired or cancelled.
Of the 11 never-finaled permits, 2 are 3 to 5 years old, 6 are 5 to 10 years old, 3 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
44 kitchen remodel permits: 39 completed, 3 never finaled, 2 expired or cancelled. Typically 4 days from filing to permit and 231 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 21, 2025 | Completed final sign-off Oct 2025 | 1001 Ortega St | 1901 17th ave- relocated (e) kitchen and convert (e) dining into (n) bedroom w/ bathroom. resize windows in bathroom and convert (e) circle window into (n) window facing street. remove (e) fireplace. convert (e) window into a (n) door at garage. 1001 ortega- convert (e)unconditioned space into habitDetails
1901 17th ave- relocated (e) kitchen and convert (e) dining into (n) bedroom w/ bathroom. resize windows in bathroom and convert (e) circle window into (n) window facing street. remove (e) fireplace. convert (e) window into a (n) door at garage. 1001 ortega- convert (e)unconditioned space into habit | $52,000 |
| Nov 14, 2023 | Completed final sign-off Jun 2024 | 26 Brussels St | rev to pa# 202306079507: minor reconfigure interior layout and removed kitchenette per plan. replace 3 windows & 1 door on g/f w/ fiber glass. replace 2 windows on 2nd/f with 3 fiber glass windows on sideDetails
rev to pa# 202306079507: minor reconfigure interior layout and removed kitchenette per plan. replace 3 windows & 1 door on g/f w/ fiber glass. replace 2 windows on 2nd/f with 3 fiber glass windows on side | |
| Aug 9, 2023 | Never finaled filed Aug 2023, never issued | 475 18th Av | remodel existing kitchen & existing bathroom at unit, same locationDetails
remodel existing kitchen & existing bathroom at unit, same location | $2,500 |
| Jun 7, 2023 | Completed final sign-off Jun 2024 | 26 Brussels St | revision to no plan pa#202211287238. 1/f: remodel bedroom, relocate bath & laundry, add bedroom & bath. add kitchenette. 2/f: reconfirure interior layout, relocate interior stair, add rear deck & stair. 3/f: add 2 bedrooms, 2 dormers, bath, & 4 skylight (total add 980 sf)Details
revision to no plan pa#202211287238. 1/f: remodel bedroom, relocate bath & laundry, add bedroom & bath. add kitchenette. 2/f: reconfirure interior layout, relocate interior stair, add rear deck & stair. 3/f: add 2 bedrooms, 2 dormers, bath, & 4 skylight (total add 980 sf) | $230,000 |
| Nov 28, 2022 | Completed final sign-off Jun 2024 | 26 Brussels St | remodel (e) kitchen and (e) bathroom. same (e) location.Details
remodel (e) kitchen and (e) bathroom. same (e) location. | $35,000 |
| May 31, 2022 | Completed final sign-off May 2023 | 5727 Mission St | 1/f: convert laundry to kitchenette, relocate washer & dryer. add shower to (e) half bathroom.Details
1/f: convert laundry to kitchenette, relocate washer & dryer. add shower to (e) half bathroom. | $6,500 |
| Apr 12, 2022 | Completed final sign-off Jan 2023 | 1715 Filbert St | unit 1715: remodel laundry, living room, kitchen, dining. add 1 full bath. unit 1717: remodel laundry, power rm, bathroom, & living room. add 1 full bath.Details
unit 1715: remodel laundry, living room, kitchen, dining. add 1 full bath. unit 1717: remodel laundry, power rm, bathroom, & living room. add 1 full bath. | $50,000 |
| Nov 16, 2021 | Completed final sign-off Jan 2023 | 1715 Filbert St | remodel one (e) kitchen & one (e) bathroom in kind for unit 1717. non structuralDetails
remodel one (e) kitchen & one (e) bathroom in kind for unit 1717. non structural | $20,000 |
| Sep 28, 2021 | Completed final sign-off Mar 2024 | 3976 Cesar Chavez St | revision to pa# 202011209436. convert office to kitchenette and replace slab.Details
revision to pa# 202011209436. convert office to kitchenette and replace slab. | $20,000 |
| Apr 12, 2021 | Completed final sign-off Feb 2022 | 129 Cabrillo St | kitchen & bathroom remodel. enlarge kitchen opening with new header.Details
kitchen & bathroom remodel. enlarge kitchen opening with new header. | $65,000 |
| Nov 20, 2020 | Completed final sign-off Mar 2024 | 3976 Cesar Chavez St | 1/f: add 1 bedroom, 2 bathrooms, office, & relocate laundry. 2/f: relocate kitchen, fmaily room & bedroom, add interior stairs & 2 skylights.Details
1/f: add 1 bedroom, 2 bathrooms, office, & relocate laundry. 2/f: relocate kitchen, fmaily room & bedroom, add interior stairs & 2 skylights. | $75,000 |
| Nov 16, 2020 | Completed final sign-off Dec 2021 | 4207 26th St | convert part of garage into master suite & 2 bathrooms. add new laundry room. remove bearing & non-bearing walls at upper level. add (e) lightwell to living space. remodel kitchen. provide new stairs between levels. new roof trusses at area of remodel. add 7 new skylights.Details
convert part of garage into master suite & 2 bathrooms. add new laundry room. remove bearing & non-bearing walls at upper level. add (e) lightwell to living space. remodel kitchen. provide new stairs between levels. new roof trusses at area of remodel. add 7 new skylights. | $150,433 |
| Nov 3, 2020 | Completed final sign-off Jul 2022 | 35 Milton St | interior remodel: 1) remodel (e) bath at 1/f 2) convert (e) bedroom #1 to (n) living room 3) remodel (e) kitchen at 2/f 4) convert (e) living room to (n) study room 5) replace (e) fireplace 6) work on ground level in separate permitDetails
interior remodel: 1) remodel (e) bath at 1/f 2) convert (e) bedroom #1 to (n) living room 3) remodel (e) kitchen at 2/f 4) convert (e) living room to (n) study room 5) replace (e) fireplace 6) work on ground level in separate permit | $20,000 |
| Oct 23, 2020 | Completed final sign-off Apr 2022 | 607 21st Av | 1/f: add 1 bdrm,1 bath,laundry & family rooms.reconfig inteiror stair btwn 1/f & 2/f. remodel ktichen & powder room on 2/f. remove walls between kitchen & dining room.replace all windows in-kind.new primary entry door.add clostet in front entrance.3/f:englarge closet in bdrms at rear.remodel bath.Details
1/f: add 1 bdrm,1 bath,laundry & family rooms.reconfig inteiror stair btwn 1/f & 2/f. remodel ktichen & powder room on 2/f. remove walls between kitchen & dining room.replace all windows in-kind.new primary entry door.add clostet in front entrance.3/f:englarge closet in bdrms at rear.remodel bath. | $60,000 |
| Sep 8, 2020 | Expired or cancelled expired Dec 2024 | 428 Hill St | replace extg kitchen top floor and bathroom on 3rd floor.Details
replace extg kitchen top floor and bathroom on 3rd floor. | $40,000 |
| Jul 22, 2020 | Completed final sign-off Oct 2021 | 76 Bruce Av | minor arch revision to pa #201910043586 to rearrange kitchen for unit 76 bruce ave (no fixture count change). (n) sliding window at fromt (see elevation). remove approved window @ rear & replace it w/ a door @ same opening.Details
minor arch revision to pa #201910043586 to rearrange kitchen for unit 76 bruce ave (no fixture count change). (n) sliding window at fromt (see elevation). remove approved window @ rear & replace it w/ a door @ same opening. | $20,000 |
| Jul 17, 2020 | Completed final sign-off Nov 2020 | 329 Prospect Av | remodel (e) bathroom, replace drywall,one bathroom, one living, one dining room, one kitchen about 660 sq ft.work to be performed on 2nd floor, no walls will be replaced. add a new furnace in garage.Details
remodel (e) bathroom, replace drywall,one bathroom, one living, one dining room, one kitchen about 660 sq ft.work to be performed on 2nd floor, no walls will be replaced. add a new furnace in garage. | $45,000 |
| Jul 2, 2020 | Completed final sign-off Dec 2020 | 2421 Greenwich St | remodel in an extg 2 story duplex, upper unit only: convert extg living room into 2nd bedroom. remodel kitchen. remove wall between nw kichen and nw living room. remodel extg full bathroom. add 2nd full bathroom. add new skylight.Details
remodel in an extg 2 story duplex, upper unit only: convert extg living room into 2nd bedroom. remodel kitchen. remove wall between nw kichen and nw living room. remodel extg full bathroom. add 2nd full bathroom. add new skylight. | $110,000 |
| May 28, 2020 | Completed final sign-off Nov 2020 | 329 Prospect Av | install 8 fire rated led housing in kitchen. replace kitchen counter top and change gas supply line from 1/2" to 3/4" from garage to kitchen about 15'.Details
install 8 fire rated led housing in kitchen. replace kitchen counter top and change gas supply line from 1/2" to 3/4" from garage to kitchen about 15'. | $5,000 |
| Feb 11, 2020 | Completed final sign-off Apr 2020 | 100 Carmel St | demolish (e) drywall at living room, dining room & kitchen. about 600 sqft. replace (e) kitchen. cabinet & countertops. at (e) location. material to be 5/8 ex-snap or 2 5/8 type x drywall. kitchen about 10'x10'Details
demolish (e) drywall at living room, dining room & kitchen. about 600 sqft. replace (e) kitchen. cabinet & countertops. at (e) location. material to be 5/8 ex-snap or 2 5/8 type x drywall. kitchen about 10'x10' | $23,000 |
| Jul 16, 2019 | Completed final sign-off Mar 2021 | 3909 Irving St | add units per ord 162-16. adu on 1st floor per ord 162-16. adu includes 2 bedrooms, 1 living room, 1 kitchen & 2 3-fixtures bathroom.Details
add units per ord 162-16. adu on 1st floor per ord 162-16. adu includes 2 bedrooms, 1 living room, 1 kitchen & 2 3-fixtures bathroom. | $80,000 |
| Jul 12, 2019 | Completed final sign-off Jan 2020 | 4406 24th St | remodel (e) kitchen about 10'x13'. 1 bathroom at (e) location. replace (e) fireplace to be gas fireplace.Details
remodel (e) kitchen about 10'x13'. 1 bathroom at (e) location. replace (e) fireplace to be gas fireplace. | $30,000 |
| Jul 11, 2019 | Completed final sign-off Dec 2023 | 31 Clipper St | ground fl: add unit to rh-2 zone bldg, expand for (n) bath, closet & bedrm. (e) shower removed for laundry. 2nd fl: (e)unit. demo (e) deck & rear bath. horizontal expansion for (n) deck & stairs. renovate kitchen & (e) bath. (n) bathDetails
ground fl: add unit to rh-2 zone bldg, expand for (n) bath, closet & bedrm. (e) shower removed for laundry. 2nd fl: (e)unit. demo (e) deck & rear bath. horizontal expansion for (n) deck & stairs. renovate kitchen & (e) bath. (n) bath | $150,000 |
| Mar 8, 2019 | Completed final sign-off Sep 2019 | 5727 Mission St | 1st fl: construct 2 bedrooms, two & half bath, media rm, storage & laundry, replace portion of foundation & slab, 2nd fl: relocated kitchen & bathroom add 1 bath & bedroom, rebuild interior stairway, add light well 4 sky lights & replace siding at rearDetails
1st fl: construct 2 bedrooms, two & half bath, media rm, storage & laundry, replace portion of foundation & slab, 2nd fl: relocated kitchen & bathroom add 1 bath & bedroom, rebuild interior stairway, add light well 4 sky lights & replace siding at rear | $106,500 |
| Nov 5, 2018 | Completed final sign-off Dec 2018 | 1432 Cabrillo St | remodel (e) kitchen at same location. upgrade electrical to 125 amp. add subpanel at second floor kitchen about 12'x13'Details
remodel (e) kitchen at same location. upgrade electrical to 125 amp. add subpanel at second floor kitchen about 12'x13' | $16,000 |
| Oct 22, 2018 | Completed final sign-off Dec 2018 | 1 Crescent Wy | remodel existing kitchen. approx 8' x 7' on the 4th floor.Details
remodel existing kitchen. approx 8' x 7' on the 4th floor. | $16,000 |
| May 31, 2018 | Completed final sign-off Jul 2018 | 5810 Mission St | replace (e) kitchen counter top, two bathroom exhaust fan, remove carpet install engineering flooring 500 sq ftDetails
replace (e) kitchen counter top, two bathroom exhaust fan, remove carpet install engineering flooring 500 sq ft | $12,000 |
| May 22, 2018 | Completed final sign-off Jul 2019 | 1914 34th Av | add rear deck on 2nd floor. remodel kitchen, bath and 1 bedroom on 2nd floor. convert 1st floor storage to add 2 bedroom, 1 family room and 1 bath.Details
add rear deck on 2nd floor. remodel kitchen, bath and 1 bedroom on 2nd floor. convert 1st floor storage to add 2 bedroom, 1 family room and 1 bath. | $100,000 |
| Mar 15, 2018 | Never finaled issued Aug 2023, no final | 2450 20th Av | comply w/ nov# 201755441 to remove north bedrm & bath @ 1st fl; remove temp partition wall & closet on 2nd fl; legalize partition wall in 2nd fl bathrm ; change doors orientation on 2nd fl; excavate foundation for legalizing 1st fl 468sf unit w/ 1 bedrm, 1 kitchen & 1 bath per ord# 43-14.Details
comply w/ nov# 201755441 to remove north bedrm & bath @ 1st fl; remove temp partition wall & closet on 2nd fl; legalize partition wall in 2nd fl bathrm ; change doors orientation on 2nd fl; excavate foundation for legalizing 1st fl 468sf unit w/ 1 bedrm, 1 kitchen & 1 bath per ord# 43-14. | $93,850 |
| Jan 8, 2018 | Completed final sign-off May 2018 | 331 Prospect Av | replace kitchen. no walls moved, removed, added or infilled. all existing layouts to remain.Details
replace kitchen. no walls moved, removed, added or infilled. all existing layouts to remain. | $16,000 |
| May 23, 2017 | Completed final sign-off Dec 2017 | 2128 Lawton St | remodel kitchen existing place, no walls to be altered/removed.Details
remodel kitchen existing place, no walls to be altered/removed. | $14,000 |
| May 5, 2017 | Completed final sign-off Nov 2017 | 745 Goettingen St | 1st floor - construct two (n) bedrooms, and two new baths, add laundry and new hall; remove front entry gate; 2nd floor - remodel (e) bathroom, relocate/remodel (e) kitchen & living; add (n) sliding doors at rear wallDetails
1st floor - construct two (n) bedrooms, and two new baths, add laundry and new hall; remove front entry gate; 2nd floor - remodel (e) bathroom, relocate/remodel (e) kitchen & living; add (n) sliding doors at rear wall | $49,000 |
| Aug 26, 2016 | Completed final sign-off May 2017 | 2819 Rivera St | add one full bath & add skylight (max 1 ft diameter)@2nd flr. add skylight (max 3ft sq.)in kitchen @2nd flr.add 2 bedrooms, one full bath,laundry rm @1st flr.remodel full bath @1st flr;demo & replace w/new gyp bd ceiling in dining & livng @2nd flr.Details
add one full bath & add skylight (max 1 ft diameter)@2nd flr. add skylight (max 3ft sq.)in kitchen @2nd flr.add 2 bedrooms, one full bath,laundry rm @1st flr.remodel full bath @1st flr;demo & replace w/new gyp bd ceiling in dining & livng @2nd flr. | $83,000 |
| Aug 5, 2016 | Completed final sign-off Apr 2017 | 2819 Rivera St | remodel kitchen at 2nd floor, replace kitchen cabinets, sink, and replace interior finishes.Details
remodel kitchen at 2nd floor, replace kitchen cabinets, sink, and replace interior finishes. | $15,000 |
| Jul 25, 2016 | Completed final sign-off Nov 2016 | 95 Red Rock Wy | apt m105: replace small kitchen and bathroom. install two lights at bedroom.Details
apt m105: replace small kitchen and bathroom. install two lights at bedroom. | $18,000 |
| Apr 8, 2016 | Completed final sign-off Jan 2017 | 1005 Larkin St | #15 2/f- remodel existing kitchen/bathroom, replace counter, cabinets, flooring & construct one new bathroom.Details
#15 2/f- remodel existing kitchen/bathroom, replace counter, cabinets, flooring & construct one new bathroom. | $20,000 |
| Feb 29, 2016 | Completed final sign-off Aug 2016 | 1758 28th Av | remodel kitchen & bathrm at 2nd flr, replace kitchen cabinets, sink, toilet,bath tubs, vanity,floor tiles & repl interior finishes with 5/8" type "x" gyp bd in same kitchen & bath 50% wattage kitchen lighting high efficacy,bathrm,light high efficacy or controlled by manual-on sensor w/he main light.Details
remodel kitchen & bathrm at 2nd flr, replace kitchen cabinets, sink, toilet,bath tubs, vanity,floor tiles & repl interior finishes with 5/8" type "x" gyp bd in same kitchen & bath 50% wattage kitchen lighting high efficacy,bathrm,light high efficacy or controlled by manual-on sensor w/he main light. | $33,600 |
| Aug 10, 2015 | Completed final sign-off Dec 2015 | 1005 Larkin St | #16 @ 3rd floor - remodel existing kitchen, bathrm, replace counter, cabinets, flooring & replace (e) sheetrock with new. all work for this unit only.Details
#16 @ 3rd floor - remodel existing kitchen, bathrm, replace counter, cabinets, flooring & replace (e) sheetrock with new. all work for this unit only. | $20,000 |
| Mar 16, 2015 | Completed final sign-off Mar 2016 | 3438 Ulloa St | 1)remodel kitchen, bathroom, replace counter, and sink at 2nd floor. 2) legalize family room, one full bathroom, and construct storage room at ground floor.Details
1)remodel kitchen, bathroom, replace counter, and sink at 2nd floor. 2) legalize family room, one full bathroom, and construct storage room at ground floor. | $48,000 |
| Nov 10, 2014 | Expired or cancelled expired Jan 2024 | 2733 Moraga St | revision under pa 201406208933; comply with complaint # 201406501; remove interior stair, in-fill opening and add one new bathrm @ 2nd flr, enlarge laundry rm & const new foundation around laundry rm at grnd floor. remodel kitchen.Details
revision under pa 201406208933; comply with complaint # 201406501; remove interior stair, in-fill opening and add one new bathrm @ 2nd flr, enlarge laundry rm & const new foundation around laundry rm at grnd floor. remodel kitchen. | $20,000 |
| Sep 4, 2014 | Completed final sign-off Sep 2015 | 15 Italy Av | interior remodel: kitchen & one bathroom @ 2/f & one bathroom at 3/f, upgrade electrical service to 125 amps.Details
interior remodel: kitchen & one bathroom @ 2/f & one bathroom at 3/f, upgrade electrical service to 125 amps. | $35,000 |
| Jun 25, 2014 | Never finaled issued Jun 2014, no final | 2130 30th Av | remodel kitchen, replace interior finishes w/5/8" type "x" gyp. bd.Details
remodel kitchen, replace interior finishes w/5/8" type "x" gyp. bd. | $21,200 |
| Jun 18, 2014 | Completed final sign-off Oct 2014 | 1960 Fell St | unit #1960 - remove/add interior non-bearing walls. remove interior bearing wall. add new posts, beams & headers. remodel (e) laundry to include (n) 1/2 bath. remodle kitchen, new closet, new lighting plan for modified areas. replace interior finishes w/ 5/8" gyp bd.Details
unit #1960 - remove/add interior non-bearing walls. remove interior bearing wall. add new posts, beams & headers. remodel (e) laundry to include (n) 1/2 bath. remodle kitchen, new closet, new lighting plan for modified areas. replace interior finishes w/ 5/8" gyp bd. | $35,000 |
| Jul 25, 2013 | Completed final sign-off Dec 2013 | 1958 Fell St | unit 1958: remodel extg kitchen, remove and add interior walls. reduce extg hearth in size. new lighting plan for modified spaces.Details
unit 1958: remodel extg kitchen, remove and add interior walls. reduce extg hearth in size. new lighting plan for modified spaces. | $20,000 |