Back to bathroom remodel contractors
H & Bo Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Nov 2009 to Aug 2026
- Last 24 months
- 8 permits filed
118 permits since 2000: 101 completed, 2 in progress, 11 never finaled, 4 expired or cancelled.
Of the 11 never-finaled permits, 2 are 3 to 5 years old, 6 are 5 to 10 years old, 3 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
52 bathroom remodel permits: 44 completed, 6 never finaled, 2 expired or cancelled. Typically 7 days from filing to permit and 233 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 21, 2025 | Completed final sign-off Oct 2025 | 1001 Ortega St | 1901 17th ave- relocated (e) kitchen and convert (e) dining into (n) bedroom w/ bathroom. resize windows in bathroom and convert (e) circle window into (n) window facing street. remove (e) fireplace. convert (e) window into a (n) door at garage. 1001 ortega- convert (e)unconditioned space into habitDetails
1901 17th ave- relocated (e) kitchen and convert (e) dining into (n) bedroom w/ bathroom. resize windows in bathroom and convert (e) circle window into (n) window facing street. remove (e) fireplace. convert (e) window into a (n) door at garage. 1001 ortega- convert (e)unconditioned space into habit | $52,000 |
| Aug 9, 2023 | Never finaled filed Aug 2023, never issued | 475 18th Av | remodel existing kitchen & existing bathroom at unit, same locationDetails
remodel existing kitchen & existing bathroom at unit, same location | $2,500 |
| Jun 7, 2023 | Completed final sign-off Jun 2024 | 26 Brussels St | revision to no plan pa#202211287238. 1/f: remodel bedroom, relocate bath & laundry, add bedroom & bath. add kitchenette. 2/f: reconfirure interior layout, relocate interior stair, add rear deck & stair. 3/f: add 2 bedrooms, 2 dormers, bath, & 4 skylight (total add 980 sf)Details
revision to no plan pa#202211287238. 1/f: remodel bedroom, relocate bath & laundry, add bedroom & bath. add kitchenette. 2/f: reconfirure interior layout, relocate interior stair, add rear deck & stair. 3/f: add 2 bedrooms, 2 dormers, bath, & 4 skylight (total add 980 sf) | $230,000 |
| Nov 28, 2022 | Completed final sign-off Jun 2024 | 26 Brussels St | remodel (e) kitchen and (e) bathroom. same (e) location.Details
remodel (e) kitchen and (e) bathroom. same (e) location. | $35,000 |
| May 31, 2022 | Completed final sign-off May 2023 | 5727 Mission St | 1/f: convert laundry to kitchenette, relocate washer & dryer. add shower to (e) half bathroom.Details
1/f: convert laundry to kitchenette, relocate washer & dryer. add shower to (e) half bathroom. | $6,500 |
| Apr 12, 2022 | Completed final sign-off Jan 2023 | 1715 Filbert St | unit 1715: remodel laundry, living room, kitchen, dining. add 1 full bath. unit 1717: remodel laundry, power rm, bathroom, & living room. add 1 full bath.Details
unit 1715: remodel laundry, living room, kitchen, dining. add 1 full bath. unit 1717: remodel laundry, power rm, bathroom, & living room. add 1 full bath. | $50,000 |
| Dec 14, 2021 | Completed final sign-off Sep 2023 | 2163 Funston Av | remodel basement to create rec room, add bath at level 1, update fixtures and finishes throughoutDetails
remodel basement to create rec room, add bath at level 1, update fixtures and finishes throughout | $150,000 |
| Nov 16, 2021 | Completed final sign-off Jan 2023 | 1715 Filbert St | remodel one (e) kitchen & one (e) bathroom in kind for unit 1717. non structuralDetails
remodel one (e) kitchen & one (e) bathroom in kind for unit 1717. non structural | $20,000 |
| Aug 12, 2021 | Completed final sign-off Oct 2023 | 1956 Fell St | convert extg storage to exercise room with bath and wet bar at 1st floor.Details
convert extg storage to exercise room with bath and wet bar at 1st floor. | $15,000 |
| Apr 12, 2021 | Completed final sign-off Feb 2022 | 129 Cabrillo St | kitchen & bathroom remodel. enlarge kitchen opening with new header.Details
kitchen & bathroom remodel. enlarge kitchen opening with new header. | $65,000 |
| Nov 20, 2020 | Completed final sign-off Mar 2024 | 3976 Cesar Chavez St | 1/f: add 1 bedroom, 2 bathrooms, office, & relocate laundry. 2/f: relocate kitchen, fmaily room & bedroom, add interior stairs & 2 skylights.Details
1/f: add 1 bedroom, 2 bathrooms, office, & relocate laundry. 2/f: relocate kitchen, fmaily room & bedroom, add interior stairs & 2 skylights. | $75,000 |
| Nov 16, 2020 | Completed final sign-off Dec 2021 | 4207 26th St | convert part of garage into master suite & 2 bathrooms. add new laundry room. remove bearing & non-bearing walls at upper level. add (e) lightwell to living space. remodel kitchen. provide new stairs between levels. new roof trusses at area of remodel. add 7 new skylights.Details
convert part of garage into master suite & 2 bathrooms. add new laundry room. remove bearing & non-bearing walls at upper level. add (e) lightwell to living space. remodel kitchen. provide new stairs between levels. new roof trusses at area of remodel. add 7 new skylights. | $150,433 |
| Nov 3, 2020 | Completed final sign-off Jul 2022 | 35 Milton St | interior remodel: 1) remodel (e) bath at 1/f 2) convert (e) bedroom #1 to (n) living room 3) remodel (e) kitchen at 2/f 4) convert (e) living room to (n) study room 5) replace (e) fireplace 6) work on ground level in separate permitDetails
interior remodel: 1) remodel (e) bath at 1/f 2) convert (e) bedroom #1 to (n) living room 3) remodel (e) kitchen at 2/f 4) convert (e) living room to (n) study room 5) replace (e) fireplace 6) work on ground level in separate permit | $20,000 |
| Oct 23, 2020 | Completed final sign-off Apr 2022 | 607 21st Av | 1/f: add 1 bdrm,1 bath,laundry & family rooms.reconfig inteiror stair btwn 1/f & 2/f. remodel ktichen & powder room on 2/f. remove walls between kitchen & dining room.replace all windows in-kind.new primary entry door.add clostet in front entrance.3/f:englarge closet in bdrms at rear.remodel bath.Details
1/f: add 1 bdrm,1 bath,laundry & family rooms.reconfig inteiror stair btwn 1/f & 2/f. remodel ktichen & powder room on 2/f. remove walls between kitchen & dining room.replace all windows in-kind.new primary entry door.add clostet in front entrance.3/f:englarge closet in bdrms at rear.remodel bath. | $60,000 |
| Sep 9, 2020 | Completed final sign-off Dec 2020 | 15 Red Rock Wy | replace bathroom, showe area only, convert bathtub to be a shower, replacea new exhaust fan. new lighting shall comply with cec 150.0(k)5. no new wall & no existing wall relocations.Details
replace bathroom, showe area only, convert bathtub to be a shower, replacea new exhaust fan. new lighting shall comply with cec 150.0(k)5. no new wall & no existing wall relocations. | $10,000 |
| Sep 9, 2020 | Completed final sign-off Sep 2020 | 2558 21st Av | replace two windows, one in bathroom and one in bedroom @ 2nd floor. in kind replacement,not visible from st. no rough opening changes, new windows shall have u-factor, not to exceed 0-32Details
replace two windows, one in bathroom and one in bedroom @ 2nd floor. in kind replacement,not visible from st. no rough opening changes, new windows shall have u-factor, not to exceed 0-32 | $1,000 |
| Sep 8, 2020 | Expired or cancelled expired Dec 2024 | 428 Hill St | replace extg kitchen top floor and bathroom on 3rd floor.Details
replace extg kitchen top floor and bathroom on 3rd floor. | $40,000 |
| Aug 25, 2020 | Completed final sign-off Feb 2024 | 1562 20th Av | rear addition, new media room, full bath, laundry area, interior stair at ground fl. new bedroom and bath at 2nd fl.Details
rear addition, new media room, full bath, laundry area, interior stair at ground fl. new bedroom and bath at 2nd fl. | $125,000 |
| Aug 5, 2020 | Completed final sign-off Nov 2020 | 1165 Filbert St | remodel existing bathroom at 3rd floor. no changesDetails
remodel existing bathroom at 3rd floor. no changes | $13,000 |
| Jul 17, 2020 | Completed final sign-off Nov 2020 | 329 Prospect Av | remodel (e) bathroom, replace drywall,one bathroom, one living, one dining room, one kitchen about 660 sq ft.work to be performed on 2nd floor, no walls will be replaced. add a new furnace in garage.Details
remodel (e) bathroom, replace drywall,one bathroom, one living, one dining room, one kitchen about 660 sq ft.work to be performed on 2nd floor, no walls will be replaced. add a new furnace in garage. | $45,000 |
| Jul 2, 2020 | Completed final sign-off Dec 2020 | 2421 Greenwich St | remodel in an extg 2 story duplex, upper unit only: convert extg living room into 2nd bedroom. remodel kitchen. remove wall between nw kichen and nw living room. remodel extg full bathroom. add 2nd full bathroom. add new skylight.Details
remodel in an extg 2 story duplex, upper unit only: convert extg living room into 2nd bedroom. remodel kitchen. remove wall between nw kichen and nw living room. remodel extg full bathroom. add 2nd full bathroom. add new skylight. | $110,000 |
| Feb 13, 2020 | Completed final sign-off Oct 2020 | 582 Corbett Av | remodel 2 existitng bathrooms in unit 582 on 2nd floorDetails
remodel 2 existitng bathrooms in unit 582 on 2nd floor | $20,000 |
| Feb 3, 2020 | Completed final sign-off Sep 2020 | 2558 21st Av | remodel (e) bathroom on 1st floor to be shower. replace 5 front windows at (e) location, material to be aluminum-clad, style to match existing.Details
remodel (e) bathroom on 1st floor to be shower. replace 5 front windows at (e) location, material to be aluminum-clad, style to match existing. | $20,000 |
| Dec 19, 2019 | Never finaled issued Jan 2020, no final | 1986 42nd Av | 2/f: remodeling (e) ktichen (remove wall), converting (e) bathroom into 2 bathrooms. build new closets into (e) bedrooms.Details
2/f: remodeling (e) ktichen (remove wall), converting (e) bathroom into 2 bathrooms. build new closets into (e) bedrooms. | $45,000 |
| Sep 12, 2019 | Completed final sign-off May 2020 | 976 Cayuga Av | add 2 bedrooms, 1 full bathroom, media room & remodel (e) family rm at 1st flr. add 1 casement aluminum clad window at frontDetails
add 2 bedrooms, 1 full bathroom, media room & remodel (e) family rm at 1st flr. add 1 casement aluminum clad window at front | $43,000 |
| Jul 16, 2019 | Completed final sign-off Mar 2021 | 3909 Irving St | add units per ord 162-16. adu on 1st floor per ord 162-16. adu includes 2 bedrooms, 1 living room, 1 kitchen & 2 3-fixtures bathroom.Details
add units per ord 162-16. adu on 1st floor per ord 162-16. adu includes 2 bedrooms, 1 living room, 1 kitchen & 2 3-fixtures bathroom. | $80,000 |
| Jul 12, 2019 | Completed final sign-off Jan 2020 | 4406 24th St | remodel (e) kitchen about 10'x13'. 1 bathroom at (e) location. replace (e) fireplace to be gas fireplace.Details
remodel (e) kitchen about 10'x13'. 1 bathroom at (e) location. replace (e) fireplace to be gas fireplace. | $30,000 |
| Jul 11, 2019 | Completed final sign-off Dec 2023 | 31 Clipper St | ground fl: add unit to rh-2 zone bldg, expand for (n) bath, closet & bedrm. (e) shower removed for laundry. 2nd fl: (e)unit. demo (e) deck & rear bath. horizontal expansion for (n) deck & stairs. renovate kitchen & (e) bath. (n) bathDetails
ground fl: add unit to rh-2 zone bldg, expand for (n) bath, closet & bedrm. (e) shower removed for laundry. 2nd fl: (e)unit. demo (e) deck & rear bath. horizontal expansion for (n) deck & stairs. renovate kitchen & (e) bath. (n) bath | $150,000 |
| Mar 8, 2019 | Completed final sign-off Sep 2019 | 5727 Mission St | 1st fl: construct 2 bedrooms, two & half bath, media rm, storage & laundry, replace portion of foundation & slab, 2nd fl: relocated kitchen & bathroom add 1 bath & bedroom, rebuild interior stairway, add light well 4 sky lights & replace siding at rearDetails
1st fl: construct 2 bedrooms, two & half bath, media rm, storage & laundry, replace portion of foundation & slab, 2nd fl: relocated kitchen & bathroom add 1 bath & bedroom, rebuild interior stairway, add light well 4 sky lights & replace siding at rear | $106,500 |
| Feb 13, 2019 | Never finaled issued Feb 2021, no final | 2933 19th Av | vertical & horizontal addition, add one story, new level wood deck & interior stairs, remodel 1st & 2nd floor, restore fron porch, 3rd fl new bedrooms and bathrooms, new roof deck w/ stairs penhouse.Details
vertical & horizontal addition, add one story, new level wood deck & interior stairs, remodel 1st & 2nd floor, restore fron porch, 3rd fl new bedrooms and bathrooms, new roof deck w/ stairs penhouse. | $300,000 |
| May 31, 2018 | Completed final sign-off Jul 2018 | 5810 Mission St | replace (e) kitchen counter top, two bathroom exhaust fan, remove carpet install engineering flooring 500 sq ftDetails
replace (e) kitchen counter top, two bathroom exhaust fan, remove carpet install engineering flooring 500 sq ft | $12,000 |
| May 22, 2018 | Completed final sign-off Jul 2019 | 1914 34th Av | add rear deck on 2nd floor. remodel kitchen, bath and 1 bedroom on 2nd floor. convert 1st floor storage to add 2 bedroom, 1 family room and 1 bath.Details
add rear deck on 2nd floor. remodel kitchen, bath and 1 bedroom on 2nd floor. convert 1st floor storage to add 2 bedroom, 1 family room and 1 bath. | $100,000 |
| Mar 15, 2018 | Never finaled issued Aug 2023, no final | 2450 20th Av | comply w/ nov# 201755441 to remove north bedrm & bath @ 1st fl; remove temp partition wall & closet on 2nd fl; legalize partition wall in 2nd fl bathrm ; change doors orientation on 2nd fl; excavate foundation for legalizing 1st fl 468sf unit w/ 1 bedrm, 1 kitchen & 1 bath per ord# 43-14.Details
comply w/ nov# 201755441 to remove north bedrm & bath @ 1st fl; remove temp partition wall & closet on 2nd fl; legalize partition wall in 2nd fl bathrm ; change doors orientation on 2nd fl; excavate foundation for legalizing 1st fl 468sf unit w/ 1 bedrm, 1 kitchen & 1 bath per ord# 43-14. | $93,850 |
| May 5, 2017 | Completed final sign-off Nov 2017 | 745 Goettingen St | 1st floor - construct two (n) bedrooms, and two new baths, add laundry and new hall; remove front entry gate; 2nd floor - remodel (e) bathroom, relocate/remodel (e) kitchen & living; add (n) sliding doors at rear wallDetails
1st floor - construct two (n) bedrooms, and two new baths, add laundry and new hall; remove front entry gate; 2nd floor - remodel (e) bathroom, relocate/remodel (e) kitchen & living; add (n) sliding doors at rear wall | $49,000 |
| Mar 16, 2017 | Completed final sign-off Dec 2017 | 349 27th Av | remodel master bathroom, exchange bathtub to be shower, install 5/8 type x sheetrock about 500 sq.ft. in garage and 200 sq.ft. in dining room, install new floor about 500 sq.ft. on living room. all work is non-structural.Details
remodel master bathroom, exchange bathtub to be shower, install 5/8 type x sheetrock about 500 sq.ft. in garage and 200 sq.ft. in dining room, install new floor about 500 sq.ft. on living room. all work is non-structural. | $20,000 |
| Aug 26, 2016 | Completed final sign-off May 2017 | 2819 Rivera St | add one full bath & add skylight (max 1 ft diameter)@2nd flr. add skylight (max 3ft sq.)in kitchen @2nd flr.add 2 bedrooms, one full bath,laundry rm @1st flr.remodel full bath @1st flr;demo & replace w/new gyp bd ceiling in dining & livng @2nd flr.Details
add one full bath & add skylight (max 1 ft diameter)@2nd flr. add skylight (max 3ft sq.)in kitchen @2nd flr.add 2 bedrooms, one full bath,laundry rm @1st flr.remodel full bath @1st flr;demo & replace w/new gyp bd ceiling in dining & livng @2nd flr. | $83,000 |
| Jul 25, 2016 | Completed final sign-off Nov 2016 | 95 Red Rock Wy | apt m105: replace small kitchen and bathroom. install two lights at bedroom.Details
apt m105: replace small kitchen and bathroom. install two lights at bedroom. | $18,000 |
| Apr 8, 2016 | Completed final sign-off Jan 2017 | 1005 Larkin St | #15 2/f- remodel existing kitchen/bathroom, replace counter, cabinets, flooring & construct one new bathroom.Details
#15 2/f- remodel existing kitchen/bathroom, replace counter, cabinets, flooring & construct one new bathroom. | $20,000 |
| Mar 22, 2016 | Completed final sign-off Aug 2016 | 1758 28th Av | 1) add one full bath and skylight (max 1 feet) at 2nd floor. 2)add 2 bedrooms, one full bath and laundry room at 1st floor per plan. add one lift (not above roof, interior space only).Details
1) add one full bath and skylight (max 1 feet) at 2nd floor. 2)add 2 bedrooms, one full bath and laundry room at 1st floor per plan. add one lift (not above roof, interior space only). | $54,000 |
| Feb 29, 2016 | Completed final sign-off Aug 2016 | 1758 28th Av | remodel kitchen & bathrm at 2nd flr, replace kitchen cabinets, sink, toilet,bath tubs, vanity,floor tiles & repl interior finishes with 5/8" type "x" gyp bd in same kitchen & bath 50% wattage kitchen lighting high efficacy,bathrm,light high efficacy or controlled by manual-on sensor w/he main light.Details
remodel kitchen & bathrm at 2nd flr, replace kitchen cabinets, sink, toilet,bath tubs, vanity,floor tiles & repl interior finishes with 5/8" type "x" gyp bd in same kitchen & bath 50% wattage kitchen lighting high efficacy,bathrm,light high efficacy or controlled by manual-on sensor w/he main light. | $33,600 |
| Aug 4, 2015 | Completed final sign-off Mar 2016 | 3438 Ulloa St | revision under pa 201503160919; convert one bathroom into 2 bathroom at 2nd floor, divided family rm into bedrm and family rm. and relocate bath rm at ground floor.Details
revision under pa 201503160919; convert one bathroom into 2 bathroom at 2nd floor, divided family rm into bedrm and family rm. and relocate bath rm at ground floor. | $10,000 |
| Jul 2, 2015 | Completed final sign-off Dec 2015 | 567 38th Av | legalize (e) bedroom & bathroom at 1st floor. add new bedroom, new family room, office & laundry room @ 1st floor. replace (e) furnace & water heater. excavate approx 12" to meet 8' ceiling height at new habitable.Details
legalize (e) bedroom & bathroom at 1st floor. add new bedroom, new family room, office & laundry room @ 1st floor. replace (e) furnace & water heater. excavate approx 12" to meet 8' ceiling height at new habitable. | $36,000 |
| May 28, 2015 | Completed final sign-off Oct 2015 | 531 Persia Av | add 1 play room and 1 office, one full bath and laundry at 1st floor per plans.Details
add 1 play room and 1 office, one full bath and laundry at 1st floor per plans. | $37,500 |
| Mar 16, 2015 | Completed final sign-off Mar 2016 | 3438 Ulloa St | 1)remodel kitchen, bathroom, replace counter, and sink at 2nd floor. 2) legalize family room, one full bathroom, and construct storage room at ground floor.Details
1)remodel kitchen, bathroom, replace counter, and sink at 2nd floor. 2) legalize family room, one full bathroom, and construct storage room at ground floor. | $48,000 |
| Mar 10, 2015 | Completed final sign-off Jun 2015 | 955 Cayuga Av | add two bedrooms, family room, one full bath, one shower to (e) bath & relocated laundry at 1st floor per plan.Details
add two bedrooms, family room, one full bath, one shower to (e) bath & relocated laundry at 1st floor per plan. | $33,500 |
| Oct 10, 2014 | Never finaled issued Oct 2014, no final | 15 Italy Av | add two bedrooms, two bathrooms, media room and laundry room at basement per plan.Details
add two bedrooms, two bathrooms, media room and laundry room at basement per plan. | $43,000 |
| Sep 4, 2014 | Completed final sign-off Sep 2015 | 15 Italy Av | interior remodel: kitchen & one bathroom @ 2/f & one bathroom at 3/f, upgrade electrical service to 125 amps.Details
interior remodel: kitchen & one bathroom @ 2/f & one bathroom at 3/f, upgrade electrical service to 125 amps. | $35,000 |
| Aug 27, 2014 | Completed final sign-off May 2016 | 2263 18th Av | legalize two bedrooms, family room, one bathroom and add one bathroom and laundry at 1st floor per plan. comply with complaint #201487263.Details
legalize two bedrooms, family room, one bathroom and add one bathroom and laundry at 1st floor per plan. comply with complaint #201487263. | $47,600 |
| Aug 12, 2014 | Never finaled issued Aug 2014, no final | 2130 30th Av | comply with complaint #20148861. add half bath room at 2nd floor. add two full bath rooms, media room, office, playroom and laundry at 1st floor per plan.Details
comply with complaint #20148861. add half bath room at 2nd floor. add two full bath rooms, media room, office, playroom and laundry at 1st floor per plan. | $57,500 |
| Jun 20, 2014 | Expired or cancelled expired Jan 2024 | 2733 Moraga St | remodel (e) bathroom at 2/f, legalize (e) family room, full bath room & construct one new bedroom at ground floor. upgrade electrical service to 125 amps.Details
remodel (e) bathroom at 2/f, legalize (e) family room, full bath room & construct one new bedroom at ground floor. upgrade electrical service to 125 amps. | $22,000 |
| Jun 18, 2014 | Completed final sign-off Oct 2014 | 1960 Fell St | unit #1960 - remove/add interior non-bearing walls. remove interior bearing wall. add new posts, beams & headers. remodel (e) laundry to include (n) 1/2 bath. remodle kitchen, new closet, new lighting plan for modified areas. replace interior finishes w/ 5/8" gyp bd.Details
unit #1960 - remove/add interior non-bearing walls. remove interior bearing wall. add new posts, beams & headers. remodel (e) laundry to include (n) 1/2 bath. remodle kitchen, new closet, new lighting plan for modified areas. replace interior finishes w/ 5/8" gyp bd. | $35,000 |
| Oct 18, 2013 | Completed final sign-off Apr 2014 | 532 Judson Av | add family room, 2 bedrooms, 1 full bathroom. relocated laundry at ground floorDetails
add family room, 2 bedrooms, 1 full bathroom. relocated laundry at ground floor | $38,000 |