Back to kitchen remodel contractors
H 2 Fire Protection
- Based in
- Redwood City
- On San Francisco permits
- Aug 2002 to May 2006
- Last 24 months
- 0 permits filed
12 permits since 2000: 3 completed, 1 never finaled, 8 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 1 completed, 1 never finaled. Typically 0 days from filing to permit and 99 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 26, 2004 | Completed final sign-off Nov 2004 | 218 Stockton St | replace existing dry chemical kitchen hood fire suppression system w/new wet chemical fire suppressiDetails
replace existing dry chemical kitchen hood fire suppression system w/new wet chemical fire suppressi | $4,200 |
| Jun 11, 2003 | Never finaled issued Jun 2003, no final | 755 Ocean Av | install resturant (ansul) fire system in kitchen according to nfpa (relocation)Details
install resturant (ansul) fire system in kitchen according to nfpa (relocation) | $4,000 |