Back to kitchen remodel contractors
Greg Kempton Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2001 to Jan 2020
- Last 24 months
- 0 permits filed
44 permits since 2000: 39 completed, 1 never finaled, 4 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
12 kitchen remodel permits: 12 completed. Typically 0 days from filing to permit and 142 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 1, 2016 | Completed final sign-off Jan 2017 | 2339 Green St | kitchen remodel, cabinets, appliances, floors & fixtures. no wall modification. no structural work. n/a for maher.Details
kitchen remodel, cabinets, appliances, floors & fixtures. no wall modification. no structural work. n/a for maher. | $50,000 |
| Jun 19, 2012 | Completed final sign-off Dec 2012 | 2633 Steiner St | one kitchen remodel; new cabs, fixtures, lights appliances, and countertops.Details
one kitchen remodel; new cabs, fixtures, lights appliances, and countertops. | $40,000 |
| May 11, 2010 | Completed final sign-off Aug 2010 | 2528 Greenwich St | kitchen remodel, new cabs, appliances, counters, 2 new circuits,.no wall removal. work on the 2nd flDetails
kitchen remodel, new cabs, appliances, counters, 2 new circuits,.no wall removal. work on the 2nd fl | $25,000 |
| Jul 8, 2008 | Completed final sign-off Dec 2008 | 2721 Sacramento St | unit b - kitchen alteration.new cabinets,countertop,fixtures ,appliances and lighting. min 50% of kitchen light watts in fluorescent lights.Details
unit b - kitchen alteration.new cabinets,countertop,fixtures ,appliances and lighting. min 50% of kitchen light watts in fluorescent lights. | $15,000 |
| Jul 8, 2008 | Completed final sign-off Dec 2008 | 268 Lombard St | unit 2 - guest bathroom alteration. new cabinets,countertops,sink, and finishes. min 50% of kitchen light watts in fluorescent lights.Details
unit 2 - guest bathroom alteration. new cabinets,countertops,sink, and finishes. min 50% of kitchen light watts in fluorescent lights. | $15,000 |
| Jul 8, 2008 | Completed final sign-off Dec 2008 | 106 Cervantes Bl | unit 106 - kitchen and master bathroom alteration. new cabinets,fixtures, 3 new windows in the light well,finishes. new windows, new light plan. min 50% of kitchen light watts in fluorescent lights.Details
unit 106 - kitchen and master bathroom alteration. new cabinets,fixtures, 3 new windows in the light well,finishes. new windows, new light plan. min 50% of kitchen light watts in fluorescent lights. | $50,000 |
| Apr 18, 2008 | Completed final sign-off Aug 2008 | 409 Clipper St | remodel kitchen/laundry area, remove wall between kitchen & laundry, non-structural wall, add shear panels @ 2 exist walls, remove (e) masonry fire place & chimney, remove (e) windows & relocate (n) windows & doors at kitchen/dining.Details
remodel kitchen/laundry area, remove wall between kitchen & laundry, non-structural wall, add shear panels @ 2 exist walls, remove (e) masonry fire place & chimney, remove (e) windows & relocate (n) windows & doors at kitchen/dining. | $30,000 |
| Sep 7, 2006 | Completed final sign-off Dec 2006 | 816 Stanyan St | bathroom remodel-new fixtures, tile, gfi circuits & light. kitchen remodel-new cabinets, counters, light, appliances, add circuits, comply with title 24 lighting for kitchen & bath.Details
bathroom remodel-new fixtures, tile, gfi circuits & light. kitchen remodel-new cabinets, counters, light, appliances, add circuits, comply with title 24 lighting for kitchen & bath. | $20,000 |
| Apr 26, 2005 | Completed final sign-off Aug 2005 | 542 Fell St | revision to app3200503218008. repair water damage to kitchen east exerior wall, replace (e) woodDetails
revision to app3200503218008. repair water damage to kitchen east exerior wall, replace (e) wood | $1,500 |
| Mar 21, 2005 | Completed final sign-off Aug 2005 | 542 Fell St | light kitchen remodel, new cabs, circuits, (non structural) tile, elect.Details
light kitchen remodel, new cabs, circuits, (non structural) tile, elect. | $10,000 |
| Mar 11, 2005 | Completed final sign-off Jul 2005 | 555 Eureka St | renovation of kitchen and bathroom on main floor - kitchen will have new flooring, cabinets,Details
renovation of kitchen and bathroom on main floor - kitchen will have new flooring, cabinets, | $30,000 |
| Oct 21, 2004 | Completed final sign-off Jan 2005 | 268 Avila St | general kitchen remodel, new cabinets,fixtures,appliances etc.Details
general kitchen remodel, new cabinets,fixtures,appliances etc. | $15,000 |