Back to bathroom remodel contractors
Greg Kempton Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2001 to Jan 2020
- Last 24 months
- 0 permits filed
44 permits since 2000: 39 completed, 1 never finaled, 4 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 14 completed. Typically 0 days from filing to permit and 128 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 21, 2017 | Completed final sign-off Oct 2017 | 2339 Green St | bathroom, remodel - new fixtures, tile, replace window in lightwell. add laundry service to adjacent closet.Details
bathroom, remodel - new fixtures, tile, replace window in lightwell. add laundry service to adjacent closet. | $20,000 |
| Jul 7, 2016 | Completed final sign-off Aug 2016 | 237 Bocana St | gen. bathroom remodel: new tile, sink, toilet, lights fanDetails
gen. bathroom remodel: new tile, sink, toilet, lights fan | $12,000 |
| May 2, 2016 | Completed final sign-off Jan 2017 | 2339 Green St | move wall and delete bathroom. replace doors. maher naDetails
move wall and delete bathroom. replace doors. maher na | $15,000 |
| Jan 25, 2011 | Completed final sign-off Jun 2012 | 356 17th Av | bathroom remodel:new fixtures, tile lights. add laundry closet adjacent to extg bathroom. all on 3rd floorDetails
bathroom remodel:new fixtures, tile lights. add laundry closet adjacent to extg bathroom. all on 3rd floor | $15,000 |
| Dec 6, 2010 | Completed final sign-off Jan 2011 | 356 17th Av | remodel 2n dlfr bathroom, fixtures, tile etc. remove paneling in 1st room fireplace with shettrock, bathroom is not at garage levelDetails
remodel 2n dlfr bathroom, fixtures, tile etc. remove paneling in 1st room fireplace with shettrock, bathroom is not at garage level | $10,000 |
| Jul 8, 2008 | Completed final sign-off Dec 2008 | 268 Lombard St | unit 2 - guest bathroom alteration. new cabinets,countertops,sink, and finishes. min 50% of kitchen light watts in fluorescent lights.Details
unit 2 - guest bathroom alteration. new cabinets,countertops,sink, and finishes. min 50% of kitchen light watts in fluorescent lights. | $15,000 |
| Jul 8, 2008 | Completed final sign-off Dec 2008 | 106 Cervantes Bl | unit 106 - kitchen and master bathroom alteration. new cabinets,fixtures, 3 new windows in the light well,finishes. new windows, new light plan. min 50% of kitchen light watts in fluorescent lights.Details
unit 106 - kitchen and master bathroom alteration. new cabinets,fixtures, 3 new windows in the light well,finishes. new windows, new light plan. min 50% of kitchen light watts in fluorescent lights. | $50,000 |
| Sep 7, 2006 | Completed final sign-off Dec 2006 | 816 Stanyan St | bathroom remodel-new fixtures, tile, gfi circuits & light. kitchen remodel-new cabinets, counters, light, appliances, add circuits, comply with title 24 lighting for kitchen & bath.Details
bathroom remodel-new fixtures, tile, gfi circuits & light. kitchen remodel-new cabinets, counters, light, appliances, add circuits, comply with title 24 lighting for kitchen & bath. | $20,000 |
| Dec 19, 2005 | Completed final sign-off Mar 2007 | 2920 Octavia St | horizontal extension at top floor to create larger remodel bath&office.replace exist drying room and exist rear roof deck, create new walking surface at exist front deck.site permit-electrical&plumbing &t-24 will be submit w/ addendum.Details
horizontal extension at top floor to create larger remodel bath&office.replace exist drying room and exist rear roof deck, create new walking surface at exist front deck.site permit-electrical&plumbing &t-24 will be submit w/ addendum. | $80,000 |
| Sep 6, 2005 | Completed final sign-off Nov 2005 | 2920 Octavia St | gen bath remodel, new fixtures, tile replace window. min 3' from p/l in kind. no structural work.Details
gen bath remodel, new fixtures, tile replace window. min 3' from p/l in kind. no structural work. | $10,000 |
| Jul 25, 2005 | Completed final sign-off Nov 2005 | 180 Beaumont Av | bathroom remodel (n) fixtures, tile, windows etcDetails
bathroom remodel (n) fixtures, tile, windows etc | $12,000 |
| Mar 11, 2005 | Completed final sign-off Jul 2005 | 555 Eureka St | renovation of kitchen and bathroom on main floor - kitchen will have new flooring, cabinets,Details
renovation of kitchen and bathroom on main floor - kitchen will have new flooring, cabinets, | $30,000 |
| Oct 15, 2002 | Completed final sign-off Jan 2003 | 11 Collins St | bathroom remodel, new fixtures,tile,etc no change in walls. replumb h20 throughoutDetails
bathroom remodel, new fixtures,tile,etc no change in walls. replumb h20 throughout | $15,000 |
| Feb 11, 2002 | Completed final sign-off Jul 2002 | 3100 Webster St | convert doorways and bath to ada compliant gen cosmetic fire alarm strobes sep permitDetails
convert doorways and bath to ada compliant gen cosmetic fire alarm strobes sep permit | $38,000 |