Back to kitchen remodel contractors
Greene Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2009 to May 2016
- Last 24 months
- 0 permits filed
14 permits since 2000: 12 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 6 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 166 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 13, 2016 | Completed final sign-off Nov 2017 | 1200 Gough St | apt 23a: remodel of kitchen, new electrical dist, new ckts, addition of washer/dryer using self condensing. ventless dryer, t-24 lighting. no changes or removal or additiong of walls.Details
apt 23a: remodel of kitchen, new electrical dist, new ckts, addition of washer/dryer using self condensing. ventless dryer, t-24 lighting. no changes or removal or additiong of walls. | $25,000 |
| Oct 7, 2015 | Completed final sign-off Jan 2016 | 1900 Folsom St | remodel restroom for public access. modify front entrance (folsom street access)with new door 32" min width & power door operators upgrade kitchen equipment. maher naDetails
remodel restroom for public access. modify front entrance (folsom street access)with new door 32" min width & power door operators upgrade kitchen equipment. maher na | $25,000 |
| Aug 20, 2015 | Completed final sign-off Mar 2016 | 1200 Gough St | kitchen remodel/bathroom remodel - finishes and fixtures, all fire-rated assembly to be maintained. no walls to be moved/no structural work. lighting shall comply with cec 150(k). no change to exhaust systemDetails
kitchen remodel/bathroom remodel - finishes and fixtures, all fire-rated assembly to be maintained. no walls to be moved/no structural work. lighting shall comply with cec 150(k). no change to exhaust system | $10,000 |
| Oct 6, 2014 | Completed final sign-off Mar 2015 | 161 Masonic Av | remodel of kitchen and bathrooms, no walls to be removed.Details
remodel of kitchen and bathrooms, no walls to be removed. | $20,000 |
| Feb 14, 2012 | Expired or cancelled cancelled Feb 2012 | 405 Laguna St | drywall wall smoothing, replace kitchen counter, replace sink, remove tub-install shower unit in its place. frame in existing vanity. install new baseboard, casement, and crown moulding. add additional lighting, replace vent. fans gyp bd relace in kind. (5/8" gyp type x. cec 150(k). no structDetails
drywall wall smoothing, replace kitchen counter, replace sink, remove tub-install shower unit in its place. frame in existing vanity. install new baseboard, casement, and crown moulding. add additional lighting, replace vent. fans gyp bd relace in kind. (5/8" gyp type x. cec 150(k). no struct | $15,000 |
| Jul 13, 2010 | Completed final sign-off Jan 2011 | 1200 Gough St | remodel kitchen & bath, r&r cabinets and appliances, r&r vanity, tub, r&r electrical distribution panel and add 4 circuits, all work within existing kitchen and bath, repl 2 fixtures in hallwayDetails
remodel kitchen & bath, r&r cabinets and appliances, r&r vanity, tub, r&r electrical distribution panel and add 4 circuits, all work within existing kitchen and bath, repl 2 fixtures in hallway | $18,277 |
| Sep 23, 2009 | Completed final sign-off Nov 2009 | 1 Daniel Burnham Ct | unit 903 - remove & replace flooring, all kitchen cabinets. replace counter top.Details
unit 903 - remove & replace flooring, all kitchen cabinets. replace counter top. | $9,239 |