Back to bathroom remodel contractors
Greene Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2009 to May 2016
- Last 24 months
- 0 permits filed
14 permits since 2000: 12 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 0 days from filing to permit and 166 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 20, 2015 | Completed final sign-off Mar 2016 | 1200 Gough St | kitchen remodel/bathroom remodel - finishes and fixtures, all fire-rated assembly to be maintained. no walls to be moved/no structural work. lighting shall comply with cec 150(k). no change to exhaust systemDetails
kitchen remodel/bathroom remodel - finishes and fixtures, all fire-rated assembly to be maintained. no walls to be moved/no structural work. lighting shall comply with cec 150(k). no change to exhaust system | $10,000 |
| Oct 6, 2014 | Completed final sign-off Mar 2015 | 161 Masonic Av | remodel of kitchen and bathrooms, no walls to be removed.Details
remodel of kitchen and bathrooms, no walls to be removed. | $20,000 |
| Feb 14, 2012 | Completed final sign-off Apr 2012 | 611 San Bruno Av | remodel upstair bathroom, and water closet, resheet floor, move colation of tub, and vanity, install sola-tube vent fan combo, nufloor retirle, replace 2 window with tempered and maintenance on plumbing in in lightwellDetails
remodel upstair bathroom, and water closet, resheet floor, move colation of tub, and vanity, install sola-tube vent fan combo, nufloor retirle, replace 2 window with tempered and maintenance on plumbing in in lightwell | $8,000 |
| Jul 13, 2010 | Completed final sign-off Jan 2011 | 1200 Gough St | remodel kitchen & bath, r&r cabinets and appliances, r&r vanity, tub, r&r electrical distribution panel and add 4 circuits, all work within existing kitchen and bath, repl 2 fixtures in hallwayDetails
remodel kitchen & bath, r&r cabinets and appliances, r&r vanity, tub, r&r electrical distribution panel and add 4 circuits, all work within existing kitchen and bath, repl 2 fixtures in hallway | $18,277 |