Back to kitchen remodel contractors
Green Oval Construction
- Based in
- Redwood City
- On San Francisco permits
- Apr 2003 to Jul 2015
- Last 24 months
- 0 permits filed
22 permits since 2000: 15 completed, 1 never finaled, 6 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
6 kitchen remodel permits: 4 completed, 2 expired or cancelled. Typically 0 days from filing to permit and 186 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 14, 2015 | Completed final sign-off Nov 2015 | 900 Bush St | kitchen remodel, cabinets replacement with same layout, dimising wall removal between kitchen and living room, non structural.Details
kitchen remodel, cabinets replacement with same layout, dimising wall removal between kitchen and living room, non structural. | $15,000 |
| Apr 16, 2015 | Completed final sign-off Jul 2015 | 147 Divisadero St | lower unit: repair termite damage in kitchen area ref pa 201503049995Details
lower unit: repair termite damage in kitchen area ref pa 201503049995 | $2,500 |
| Mar 4, 2014 | Completed final sign-off Nov 2014 | 154 Lombard St | replace kitchen cabinets tamper outlets, sink faucet, light fixtures. no change on walls., dodors, windowsDetails
replace kitchen cabinets tamper outlets, sink faucet, light fixtures. no change on walls., dodors, windows | $20,000 |
| Aug 15, 2012 | Completed final sign-off Aug 2013 | 1130 Shrader St | 1 bathroom reface, 1 kitchen remodel/new cabinet, new outlets, 1 window replacement, new sheetrock in kitchen water and gas. plumbing and gas. no window intstallation in bedroomsDetails
1 bathroom reface, 1 kitchen remodel/new cabinet, new outlets, 1 window replacement, new sheetrock in kitchen water and gas. plumbing and gas. no window intstallation in bedrooms | $26,000 |
| Jul 14, 2008 | Expired or cancelled expired Dec 2009 | 946 Stockton St | #12f - tear out exist in kitchen cabinets, floor, and sheetrock in the apartment to include 1 bathroom. all interior finish to be placed in kind. no change to window or door or exiting.Details
#12f - tear out exist in kitchen cabinets, floor, and sheetrock in the apartment to include 1 bathroom. all interior finish to be placed in kind. no change to window or door or exiting. | $15,000 |
| Apr 21, 2003 | Expired or cancelled expired Nov 2004 | 574 03rd St | remove old plaster or sheetrock-install new sheetrock, new electrical, new plumbing, new kitchen sinDetails
remove old plaster or sheetrock-install new sheetrock, new electrical, new plumbing, new kitchen sin | $145,000 |