Green Group Remodeling Inc
- Based in
- Concord
- On San Francisco permits
- Mar 2020 to Sep 2026
- Last 24 months
- 33 permits filed
96 permits since 2000: 69 completed, 12 in progress, 8 never finaled, 7 expired or cancelled.
Of the 8 never-finaled permits, 2 are 3 to 5 years old, 6 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 2 completed, 2 in progress. Typically 36 days from filing to permit and 422 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 9, 2026 | In progress issued Sep 2026 | 4023 Folsom St | new front stairs, reframe front porch walls and roof.Details
new front stairs, reframe front porch walls and roof. | $10,000 |
| Apr 16, 2026 | In progress issued Jun 2026 | 4023 Folsom St | remove existing wood-framed/stucco front stairs and replace with r/f concrete stairs with metal guardrail; remove and replace existing wood landing; all work within existing footprint.Details
remove existing wood-framed/stucco front stairs and replace with r/f concrete stairs with metal guardrail; remove and replace existing wood landing; all work within existing footprint. | $16,000 |
| Oct 11, 2024 | Completed final sign-off Jul 2025 | 619 33rd Av | demo (e) staircase and landing at backyard. remove (e) door and window at ground floor living room. install new sliding door at ground floor living room. build new staircase and deck at backyard.Details
demo (e) staircase and landing at backyard. remove (e) door and window at ground floor living room. install new sliding door at ground floor living room. build new staircase and deck at backyard. | $7,000 |
| Oct 8, 2021 | Completed final sign-off Jul 2023 | 115 Eastwood Dr | kitchen remodel and add one full bath. rebuild stair to ground level. legalize roofdeck over garage. voluntary structural.Details
kitchen remodel and add one full bath. rebuild stair to ground level. legalize roofdeck over garage. voluntary structural. | $38,000 |