Back to bathroom remodel contractors
Green Group Remodeling Inc
- Based in
- Concord
- On San Francisco permits
- Mar 2020 to Sep 2026
- Last 24 months
- 33 permits filed
96 permits since 2000: 69 completed, 12 in progress, 8 never finaled, 7 expired or cancelled.
Of the 8 never-finaled permits, 2 are 3 to 5 years old, 6 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
52 bathroom remodel permits: 38 completed, 6 in progress, 5 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 91 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 21, 2026 | In progress issued Sep 2026 | 1011 23rd St | upper level bathroom partial remodel - convert tub to walk-in shower, upgrade plumbing in shower area only.Details
upper level bathroom partial remodel - convert tub to walk-in shower, upgrade plumbing in shower area only. | $12,000 |
| Sep 9, 2026 | In progress issued Sep 2026 | 1955 Eddy St | bathroom remodel_ full remodel of existing bathroom on upper level(1955 eddy st), including non-structural wall removal to expand shower into adjacent pantry, new walk-in shower, plumbing, electrical, and finishes.Details
bathroom remodel_ full remodel of existing bathroom on upper level(1955 eddy st), including non-structural wall removal to expand shower into adjacent pantry, new walk-in shower, plumbing, electrical, and finishes. | $31,000 |
| Jun 10, 2026 | In progress issued Jun 2026 | 431 Teresita Bl | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $90,000 |
| May 28, 2026 | Completed final sign-off Aug 2026 | 2403 23rd St | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $19,000 |
| May 4, 2026 | In progress issued Jun 2026 | 614 06th Av | bathroom remodel_full remodel of existing hallway bathroom on third floor, including remodel of non-load bearing wall, cancel tub, install new walk-in shower, relocate toilet and vanity. upgrade plumbing and electrical per code.Details
bathroom remodel_full remodel of existing hallway bathroom on third floor, including remodel of non-load bearing wall, cancel tub, install new walk-in shower, relocate toilet and vanity. upgrade plumbing and electrical per code. | $21,500 |
| Apr 29, 2026 | In progress issued May 2026 | 1915 21st Av | full remodel of existing bathroom, including adding a half bath. full kitchen remodel includes removal of non-load bearing wall, open a wall and frame new entry-way, relocate sink, hood, 7 range stove, and refrigerator. install new 100 amp subpanel in garage.Details
full remodel of existing bathroom, including adding a half bath. full kitchen remodel includes removal of non-load bearing wall, open a wall and frame new entry-way, relocate sink, hood, 7 range stove, and refrigerator. install new 100 amp subpanel in garage. | $100,000 |
| Apr 16, 2026 | Completed final sign-off Aug 2026 | 2031 42nd Av | bathroom remodel: full remodel, swap vanity & toilet location. upgrade plumbing & electrical per code; install pocket door;install lighting & moisture sensor fan. kitchen remodel full remodel, remove non-load wall around linen closet, frame to close off door;cancel/cap e gas pipe for stove,Details
bathroom remodel: full remodel, swap vanity & toilet location. upgrade plumbing & electrical per code; install pocket door;install lighting & moisture sensor fan. kitchen remodel full remodel, remove non-load wall around linen closet, frame to close off door;cancel/cap e gas pipe for stove, | $80,000 |
| Dec 30, 2025 | Completed final sign-off Feb 2026 | 441 Laidley St | in-kind remodeling of 1 bathroom(s) in basement with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in basement with 0 shower pan(s). | $16,978 |
| Dec 17, 2025 | Completed final sign-off Apr 2026 | 1462 30th Av | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $20,000 |
| Dec 15, 2025 | In progress issued Dec 2025 | 202 Roosevelt Wy | kitchen remodel-includes removal of load bearing wall. upgrade plumbing and electrical per code. bathroom remodel-3rd level hallway bathroom. upgrade plumbing and electrical per code. window replacement of 4 existing windows. convert window in living room to sliding doors.Details
kitchen remodel-includes removal of load bearing wall. upgrade plumbing and electrical per code. bathroom remodel-3rd level hallway bathroom. upgrade plumbing and electrical per code. window replacement of 4 existing windows. convert window in living room to sliding doors. | $80,000 |
| Dec 10, 2025 | Completed final sign-off Feb 2026 | 1255 Potrero Av | frame wall to close off area for new half bath on main level. demolish (e) hardwood fl in work area. install new plumbing for sink and toilet per code. install wall mounted toilet. install exhaust fan. install switches and outlets per code. install lighting.Details
frame wall to close off area for new half bath on main level. demolish (e) hardwood fl in work area. install new plumbing for sink and toilet per code. install wall mounted toilet. install exhaust fan. install switches and outlets per code. install lighting. | $20,000 |
| Nov 17, 2025 | Completed final sign-off Jan 2026 | 1140 Silver Av | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $12,000 |
| Nov 10, 2025 | Completed final sign-off Jan 2026 | 338 Spear St | unit 16e: master bathroom remodel (no structural changes). - convert bathtub to walk-in shower. redo vanity plumbing to accommodate 2 sinks. upgrade plumbing and electrical per code. install moisture sensor fan.Details
unit 16e: master bathroom remodel (no structural changes). - convert bathtub to walk-in shower. redo vanity plumbing to accommodate 2 sinks. upgrade plumbing and electrical per code. install moisture sensor fan. | $20,000 |
| Oct 28, 2025 | Completed final sign-off Mar 2026 | 154 Stanyan St | bathroom remodel for full bath, upgrade plumbing and elec per code. relocate vanity toilet. relocate walk in shower to new wet area with free standing tub. cancel pocket door. install new door. install new lighting and moisture sensor fan. (half bath) upgrade plumbing and electrical per code.Details
bathroom remodel for full bath, upgrade plumbing and elec per code. relocate vanity toilet. relocate walk in shower to new wet area with free standing tub. cancel pocket door. install new door. install new lighting and moisture sensor fan. (half bath) upgrade plumbing and electrical per code. | $28,000 |
| Jun 23, 2025 | Completed final sign-off Sep 2025 | 614 06th Av | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $19,000 |
| Jun 4, 2025 | Completed final sign-off Jul 2025 | 644 Clayton St | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $14,000 |
| Aug 16, 2024 | Completed final sign-off Dec 2024 | 116 Bemis St | bathroom remodel in kind no layout change. upgrade plumbing per code. convert tub to walk in shower. shower to be same footprint as (e) tub.no change of floor elevation. no change to floor/wall layout. no structural work. replace bath window in kind 35"x33"-not st visible. window to be temperedDetails
bathroom remodel in kind no layout change. upgrade plumbing per code. convert tub to walk in shower. shower to be same footprint as (e) tub.no change of floor elevation. no change to floor/wall layout. no structural work. replace bath window in kind 35"x33"-not st visible. window to be tempered | $17,000 |
| Aug 14, 2024 | Completed final sign-off Oct 2024 | 39 Douglass St | bathroom remodel - like for like (no change to layout). upgrade plumbing per code. install moisture sensor fan.Details
bathroom remodel - like for like (no change to layout). upgrade plumbing per code. install moisture sensor fan. | $15,000 |
| May 17, 2024 | Completed final sign-off Sep 2024 | 140 Pennsylvania Av | partial master bath remodel: convert tub to walk in shower. upgrade plumbing per code. no change to layout.Details
partial master bath remodel: convert tub to walk in shower. upgrade plumbing per code. no change to layout. | $8,000 |
| Oct 18, 2023 | Expired or cancelled cancelled Jun 2024 | 2185 Bush St | bathroom in kind upgrade plumbing and electrical per code no change to layout or floor planDetails
bathroom in kind upgrade plumbing and electrical per code no change to layout or floor plan | $22,000 |
| May 22, 2023 | Completed final sign-off Aug 2023 | 4376 21st St | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $26,000 |
| Mar 24, 2023 | Completed final sign-off Nov 2023 | 322 22nd Av | unit 301: remodel 3rd floor primary bathroom, extend bathroom into adjacent bedroom closet by approx 3 feet relocate vanity and toilet. upgrade plumbing and electrical. bathroom located on 3/fDetails
unit 301: remodel 3rd floor primary bathroom, extend bathroom into adjacent bedroom closet by approx 3 feet relocate vanity and toilet. upgrade plumbing and electrical. bathroom located on 3/f | $25,000 |
| Mar 24, 2023 | Completed final sign-off Jul 2023 | 431 Christopher Dr | remodel master bath. expand bath approx 2' into bedroom. relocate toilet. add sink, upgrade plumbing and elec. remodel guest bath, like for like. upgrade plumbing and elecDetails
remodel master bath. expand bath approx 2' into bedroom. relocate toilet. add sink, upgrade plumbing and elec. remodel guest bath, like for like. upgrade plumbing and elec | $36,000 |
| Mar 1, 2023 | Completed final sign-off Dec 2024 | 118 Melrose Av | 2nd fl - interior remodel of kitchen, family room and bathroom on the front of the building; remodeled area is 400 sf. no increase in bldg's sf. remove bearing wall & add new beam.Details
2nd fl - interior remodel of kitchen, family room and bathroom on the front of the building; remodeled area is 400 sf. no increase in bldg's sf. remove bearing wall & add new beam. | $100,000 |
| Feb 21, 2023 | Completed final sign-off Apr 2023 | 150 Page St | unit#: 404; bath remodel in kind. add fan,Details
unit#: 404; bath remodel in kind. add fan, | $15,000 |
| Feb 21, 2023 | Never finaled issued Feb 2023, no final | 870 North Point St | unit#: 301; bathroom remodel 1 : full remodel, convert tub to walk in shower, upgrade electrical/plumbing per code. bath 2: full remodel, like for like, upgrade elec plumbingDetails
unit#: 301; bathroom remodel 1 : full remodel, convert tub to walk in shower, upgrade electrical/plumbing per code. bath 2: full remodel, like for like, upgrade elec plumbing | $30,000 |
| Jan 26, 2023 | Completed final sign-off Feb 2023 | 2721 Jackson St | one bathroom remodel like for like. replacing bathtub, wet walls. upgrade plumbing per code.Details
one bathroom remodel like for like. replacing bathtub, wet walls. upgrade plumbing per code. | $13,000 |
| Aug 22, 2022 | Completed final sign-off Mar 2024 | 66 Cleary Ct | unit 505: two bathroom remodels. like for like upgrade plumbing/electrical per code and add fan to each bathroom. no structural/wall/framing modificationDetails
unit 505: two bathroom remodels. like for like upgrade plumbing/electrical per code and add fan to each bathroom. no structural/wall/framing modification | $27,000 |
| Apr 7, 2022 | Never finaled issued Apr 2022, no final | 1250 Jones St | unit #902: remodel kitchen & bathroom. kitchen: relocate stovetop & refrigerator. remove nonload bearing wall. in closet area, block in 2 doorways & remove nonload bearing wall. add lights in living room. bathroom: replace tub with shower. add washer/elec dryer.Details
unit #902: remodel kitchen & bathroom. kitchen: relocate stovetop & refrigerator. remove nonload bearing wall. in closet area, block in 2 doorways & remove nonload bearing wall. add lights in living room. bathroom: replace tub with shower. add washer/elec dryer. | $82,000 |
| Mar 18, 2022 | Completed final sign-off Apr 2023 | 725 Tehama St | remodel like to like: 2 full bathrooms and 1 half bathroom. remodel like to like: kitchen one. upgrade plumbing and electrical to 2019 codes cbccpccec.Details
remodel like to like: 2 full bathrooms and 1 half bathroom. remodel like to like: kitchen one. upgrade plumbing and electrical to 2019 codes cbccpccec. | $50,000 |
| Feb 28, 2022 | Completed final sign-off May 2022 | 312 Edna St | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $15,000 |
| Jan 24, 2022 | Completed final sign-off Jun 2022 | 229 Cortland Av | remodel unit 229 at street level, enlarge (e) bathroom and add a new kitchen. at basement, add partition walls, add a new tub to (e) powder room.Details
remodel unit 229 at street level, enlarge (e) bathroom and add a new kitchen. at basement, add partition walls, add a new tub to (e) powder room. | $250,000 |
| Dec 14, 2021 | Completed final sign-off Aug 2022 | 968 Guerrero St | remodel 2nd floor bathroom, convert bathtub to shower. all elese like for like.Details
remodel 2nd floor bathroom, convert bathtub to shower. all elese like for like. | $20,000 |
| Nov 1, 2021 | Completed final sign-off Dec 2022 | 2865 Washington St | convert laundry room to hall bathroom. remodel master bathroom including relocation of toilet and shower. convert downstairs closet to laundry area.Details
convert laundry room to hall bathroom. remodel master bathroom including relocation of toilet and shower. convert downstairs closet to laundry area. | $72,000 |
| Oct 20, 2021 | Completed final sign-off Nov 2021 | 447 Orizaba Av | one remodel bathroom like for like. no layout changes. replace plumbing fixtures, electrical gfci, replace tub & new exhaust fan.Details
one remodel bathroom like for like. no layout changes. replace plumbing fixtures, electrical gfci, replace tub & new exhaust fan. | $18,000 |
| Oct 8, 2021 | Completed final sign-off Jul 2023 | 115 Eastwood Dr | kitchen remodel and add one full bath. rebuild stair to ground level. legalize roofdeck over garage. voluntary structural.Details
kitchen remodel and add one full bath. rebuild stair to ground level. legalize roofdeck over garage. voluntary structural. | $38,000 |
| Aug 24, 2021 | Completed final sign-off Feb 2022 | 1308 Mariposa St | hallway bathroom and half bathroom remodel. hallway bath: replace and relocate fixtures(toilet and shower), make shower bigger. add lighting. remove extg chase. re-rate plumbig lines. half bath: like for like. add lighting. udate electrical.Details
hallway bathroom and half bathroom remodel. hallway bath: replace and relocate fixtures(toilet and shower), make shower bigger. add lighting. remove extg chase. re-rate plumbig lines. half bath: like for like. add lighting. udate electrical. | $20,000 |
| Aug 20, 2021 | Expired or cancelled cancelled Jan 2023 | 15 Cityview Wy | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 1 shower pan(s). installing gas line.Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 1 shower pan(s). installing gas line. | $55,000 |
| Jul 2, 2021 | Completed final sign-off Oct 2021 | 65 Idora Av | remodeling 2 bathrooms like for like, replace plumbing fixturse, 1 tub,1 shower, 2 toilet, 2 sinks. gfci x4.Details
remodeling 2 bathrooms like for like, replace plumbing fixturse, 1 tub,1 shower, 2 toilet, 2 sinks. gfci x4. | $18,000 |
| May 20, 2021 | Completed final sign-off Aug 2021 | 200 Townsend St | unit 16:replace countertop and cabinets in kitchen; replace floor;wall tiles, (2) bathrooms; replace (1) vanity; replace living space ceiling, lights; replace (1) vanity cabinetDetails
unit 16:replace countertop and cabinets in kitchen; replace floor;wall tiles, (2) bathrooms; replace (1) vanity; replace living space ceiling, lights; replace (1) vanity cabinet | $35,000 |
| May 5, 2021 | Completed final sign-off Aug 2021 | 2945 Lincoln Wy | kitchen remodel like for like; replace appliances; hood, plumbing fixtures, electrical up to code; bathroom remodeling like for like replace plumbing fixture up code upgrade e/mp.Details
kitchen remodel like for like; replace appliances; hood, plumbing fixtures, electrical up to code; bathroom remodeling like for like replace plumbing fixture up code upgrade e/mp. | $18,000 |
| Mar 15, 2021 | Completed final sign-off May 2021 | 310 Townsend St | 1 bathroom remodeling like for like,replace plumbing fixtures, upgrade e/m/p up to code.Details
1 bathroom remodeling like for like,replace plumbing fixtures, upgrade e/m/p up to code. | $16,000 |
| Feb 23, 2021 | Completed final sign-off Apr 2021 | 310 Townsend St | 2 bathroom remodeling likfe for like. 1 tub to tub,1 shower, upgrade subpanel 100-200. upgrade elec/mech/plum up to code.Details
2 bathroom remodeling likfe for like. 1 tub to tub,1 shower, upgrade subpanel 100-200. upgrade elec/mech/plum up to code. | $20,000 |
| Jan 14, 2021 | Completed final sign-off Aug 2021 | 2600 18th St | unit 23: 2 bathroom remodel like for like replace tub, plumbing fixtures, upgrade e/m/p vpto code, replace fans. 4 r.lDetails
unit 23: 2 bathroom remodel like for like replace tub, plumbing fixtures, upgrade e/m/p vpto code, replace fans. 4 r.l | $18,000 |
| Dec 8, 2020 | Completed final sign-off Feb 2021 | 1177 California St | complete bathroom remodel like for like tub to shower (shower pan) no walls or layout change , unit #932 onlyDetails
complete bathroom remodel like for like tub to shower (shower pan) no walls or layout change , unit #932 only | $20,000 |
| Nov 12, 2020 | Never finaled issued Nov 2020, no final | 4235 Folsom St | bathroom remodeling like for like replacement shower, fan, 2 recess lights, upgrade electrical, plumbing up to code, replace toilet and sink.Details
bathroom remodeling like for like replacement shower, fan, 2 recess lights, upgrade electrical, plumbing up to code, replace toilet and sink. | $15,000 |
| Nov 4, 2020 | Completed final sign-off Mar 2021 | 703 Crescent Av | complete bathroom remodel like for like. adding 2 recessed lights and exhaust fan, no walls or layout change. 45 sq ft.Details
complete bathroom remodel like for like. adding 2 recessed lights and exhaust fan, no walls or layout change. 45 sq ft. | $20,000 |
| Oct 13, 2020 | Completed final sign-off Dec 2020 | 2715 Pine St | master bath remodel complete (shower pan) 10'x10'. like for like, no layout/wall changeDetails
master bath remodel complete (shower pan) 10'x10'. like for like, no layout/wall change | $20,000 |
| Aug 15, 2020 | Expired or cancelled cancelled Jan 2026 | 601 Van Ness Av | unit #552: bathroom (~5'x8') remodel like for like- replace tub, toilet, vanity and tile. no change to existing layout or walls.Details
unit #552: bathroom (~5'x8') remodel like for like- replace tub, toilet, vanity and tile. no change to existing layout or walls. | $12,000 |
| Aug 12, 2020 | Never finaled issued Aug 2020, no final | 601 Van Ness Av | hallway bathroom remodel in-kind. upgrade electrical and plumbing. no structural work.Details
hallway bathroom remodel in-kind. upgrade electrical and plumbing. no structural work. | $10,000 |
| Aug 7, 2020 | Completed final sign-off Oct 2020 | 3446 Clay St | bathroom remodel in kind. walking shower, toilet, and vanity. adding subpanel.Details
bathroom remodel in kind. walking shower, toilet, and vanity. adding subpanel. | $5,000 |
| Mar 5, 2020 | Never finaled issued Mar 2020, no final | 601 Van Ness Av | kitchen remodel: cabinet, counter top new appliances, sink and faucet, bathroom remodel: sink, counter, replace toilet bowl, update tub & faucet, replace carpet to hardwood, tile in bathroom and kitchen, patch sheetrock, painting, fix any broken outlet. in kind. same layout remodel n/a maherDetails
kitchen remodel: cabinet, counter top new appliances, sink and faucet, bathroom remodel: sink, counter, replace toilet bowl, update tub & faucet, replace carpet to hardwood, tile in bathroom and kitchen, patch sheetrock, painting, fix any broken outlet. in kind. same layout remodel n/a maher | $20,000 |