Block 2914, lot 037
65 Idora Ave
- City’s use
- Single Family Residential
- Built
- 1928
- Stories
- 2
- Units
- 1
- Rooms
- 2 bedrooms, 2 bathrooms
- Building
- 1,851 sq ft
- Lot
- 3,101 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 1, 2025 | Completed final sign-off Feb 2026 | 65 Idora Av | replace 7 windows like for like marvin aluminum clad wood windows, 6 front, 1 rear. same size, same locations, max u-factor 0.30.Details
replace 7 windows like for like marvin aluminum clad wood windows, 6 front, 1 rear. same size, same locations, max u-factor 0.30. | $24,500 | |
| Sep 18, 2024 | Completed final sign-off Sep 2024 | 65 Idora Av | General Express Construction Dba Roof Ex | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $13,989 |
| Aug 10, 2021 | Completed final sign-off Oct 2021 | 65 Idora Av | Green Group Remodeling Inc | convert (e) study room into (n) bedroom and create a (n) closet, remove non-load bearing wall, remove (e) casement window and replace with same site, put egress window into new bedroom, new electrical outlets. non street facing windows.Details
convert (e) study room into (n) bedroom and create a (n) closet, remove non-load bearing wall, remove (e) casement window and replace with same site, put egress window into new bedroom, new electrical outlets. non street facing windows. | $15,000 |
| Jul 2, 2021 | Completed final sign-off Oct 2021 | 65 Idora Av | Green Group Remodeling Inc | remodeling 2 bathrooms like for like, replace plumbing fixturse, 1 tub,1 shower, 2 toilet, 2 sinks. gfci x4.Details
remodeling 2 bathrooms like for like, replace plumbing fixturse, 1 tub,1 shower, 2 toilet, 2 sinks. gfci x4. | $18,000 |
| Jan 10, 2019 | Completed final sign-off Mar 2019 | 65 Idora Av | to obtain a final inspection for work approved under pa#201711093682. all work is complete.Details
to obtain a final inspection for work approved under pa#201711093682. all work is complete. | ||
| Nov 9, 2017 | Completed final sign-off Mar 2019 | 65 Idora Av | to obtain final inspection for work approved under pa #201401095952. all work is complete. (to comply with nov 201341921)Details
to obtain final inspection for work approved under pa #201401095952. all work is complete. (to comply with nov 201341921) | ||
| Jan 9, 2014 | Completed final sign-off Mar 2019 | 65 Idora Av | to comply with nov# 201341921. to obtain final inspection for work approved under pa# 200210219488. all work is complete.Details
to comply with nov# 201341921. to obtain final inspection for work approved under pa# 200210219488. all work is complete. | ||
| Oct 21, 2002 | Completed final sign-off Mar 2019 | 65 Idora Av | replace foundation at rear of bldg., new bathroom & study at 1/f., new stair to 1/f.Details
replace foundation at rear of bldg., new bathroom & study at 1/f., new stair to 1/f. | $30,000 | |
| Feb 28, 2002 | Completed final sign-off Mar 2002 | 65 Idora Av | renew app 9413256 for ktch/bath rmdl, cabnts,fix,water damgd framing/finisheslDetails
renew app 9413256 for ktch/bath rmdl, cabnts,fix,water damgd framing/finishesl |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Green Group Remodeling Inc (2), General Express Construction Dba Roof Ex
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.