Green Construction Builder Corp
- Based in
- Burlingame
- On San Francisco permits
- Sep 2011 to Oct 2024
- Last 24 months
- 1 permit filed
18 permits since 2000: 16 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
6 stairs permits: 4 completed, 2 never finaled. Typically 13 days from filing to permit and 264 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 28, 2023 | Completed final sign-off Mar 2025 | 393 Arlington St | replacing & expanding existing main floor deck & new ground lvl flat work to integrate new deck. demo of (e) deck, replacement of (e) property line fire wall & n concrete footings. (n) larger deck will align to the (e) bi-fold door sill. (n) extisting metal spiral stair.Details
replacing & expanding existing main floor deck & new ground lvl flat work to integrate new deck. demo of (e) deck, replacement of (e) property line fire wall & n concrete footings. (n) larger deck will align to the (e) bi-fold door sill. (n) extisting metal spiral stair. | $80,000 |
| May 13, 2016 | Completed final sign-off Jan 2017 | 4055 Cesar Chavez St | 1)legalize bath room and bedroom interior staircase from 2nd floor down to ground fl. 2)remodel kitchen, relocate bathroom. replace sheet rock with new & rewire elect at 2nd fl. 3)remodel kitchen, bathrm, construct one nw bathroom, replace sheetrock with nw & rewire & rewire elec.Details
1)legalize bath room and bedroom interior staircase from 2nd floor down to ground fl. 2)remodel kitchen, relocate bathroom. replace sheet rock with new & rewire elect at 2nd fl. 3)remodel kitchen, bathrm, construct one nw bathroom, replace sheetrock with nw & rewire & rewire elec. | $85,000 |
| Jan 7, 2016 | Completed final sign-off Feb 2017 | 644 Laguna Honda Bl | 1st floor: add 1 bedroom, 1 family room, 1 full bath and new exterior patio. 2nd floor: relocate stairs to 1st floor. remove deck at rear.Details
1st floor: add 1 bedroom, 1 family room, 1 full bath and new exterior patio. 2nd floor: relocate stairs to 1st floor. remove deck at rear. | $65,000 |
| Dec 23, 2015 | Never finaled issued Dec 2015, no final | 176 Capistrano Av | replace til for (1) bathroom , bathtub, shower pan. no relocation. replace rotten siding of house on southern side, 20'x10' and rotten deck boards, only boards, not replacing joist or beam. replace one windown in bathroom with similar size.new tile over (e) front stair entry.Details
replace til for (1) bathroom , bathtub, shower pan. no relocation. replace rotten siding of house on southern side, 20'x10' and rotten deck boards, only boards, not replacing joist or beam. replace one windown in bathroom with similar size.new tile over (e) front stair entry. | $5,000 |
| May 27, 2015 | Never finaled issued Jun 2015, no final | 549 Flood Av | 1) ground floor: convert extg family rm to study and extg playroom to family rm. add a full bath, half bath and walk in closet and laundry room. 2) remove extg int. stair and add a nw stair. 3) enlarge one extg bedrom on 2nd fl. revision to app#201503181172.Details
1) ground floor: convert extg family rm to study and extg playroom to family rm. add a full bath, half bath and walk in closet and laundry room. 2) remove extg int. stair and add a nw stair. 3) enlarge one extg bedrom on 2nd fl. revision to app#201503181172. | $15,000 |
| Mar 18, 2015 | Completed final sign-off Nov 2015 | 549 Flood Av | convert (e) playroom to study room, legalize (e) family room, add a full bath, a half bath & walk in closet on ground floor. add storage rm, washer , dryer & relocated w. h. & furnace on ground flr. infill (e) second flr lightwell to make a deck & remove the stair.Details
convert (e) playroom to study room, legalize (e) family room, add a full bath, a half bath & walk in closet on ground floor. add storage rm, washer , dryer & relocated w. h. & furnace on ground flr. infill (e) second flr lightwell to make a deck & remove the stair. | $40,000 |