Back to bathroom remodel contractors
Green Construction Builder Corp
- Based in
- Burlingame
- On San Francisco permits
- Sep 2011 to Oct 2024
- Last 24 months
- 1 permit filed
18 permits since 2000: 16 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 11 completed, 2 never finaled. Typically 6 days from filing to permit and 182 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 17, 2024 | Completed final sign-off Mar 2025 | 1565 Dolores St | remodel bathroom at ground level. no relocations.Details
remodel bathroom at ground level. no relocations. | $12,000 |
| Oct 28, 2022 | Completed final sign-off Oct 2023 | 1560 22nd St | bathroom and kitchen remodel, replace (e) plumbing fixtures, wall outlets, and lighting fixtures, new finishes and cabinetry to replace existing. in kind remodelDetails
bathroom and kitchen remodel, replace (e) plumbing fixtures, wall outlets, and lighting fixtures, new finishes and cabinetry to replace existing. in kind remodel | $30,000 |
| Aug 10, 2016 | Completed final sign-off Jan 2017 | 432 Shields St | 1st fl add 1 bedroom, 1 bath. 2nd fl replace front windows in kindDetails
1st fl add 1 bedroom, 1 bath. 2nd fl replace front windows in kind | $40,000 |
| May 13, 2016 | Completed final sign-off Jan 2017 | 4055 Cesar Chavez St | 1)legalize bath room and bedroom interior staircase from 2nd floor down to ground fl. 2)remodel kitchen, relocate bathroom. replace sheet rock with new & rewire elect at 2nd fl. 3)remodel kitchen, bathrm, construct one nw bathroom, replace sheetrock with nw & rewire & rewire elec.Details
1)legalize bath room and bedroom interior staircase from 2nd floor down to ground fl. 2)remodel kitchen, relocate bathroom. replace sheet rock with new & rewire elect at 2nd fl. 3)remodel kitchen, bathrm, construct one nw bathroom, replace sheetrock with nw & rewire & rewire elec. | $85,000 |
| Mar 1, 2016 | Completed final sign-off Feb 2019 | 982 Randolph St | to comply with nov 201551992. gnd flr - legalize non warranted rooms: family room, bedroom and full bathroom. replace water heater per unit legalization ordinance 43-14. add 982 randolph st to 984 randolph st 7081a/019.Details
to comply with nov 201551992. gnd flr - legalize non warranted rooms: family room, bedroom and full bathroom. replace water heater per unit legalization ordinance 43-14. add 982 randolph st to 984 randolph st 7081a/019. | $40,000 |
| Jan 7, 2016 | Completed final sign-off Feb 2017 | 644 Laguna Honda Bl | 1st floor: add 1 bedroom, 1 family room, 1 full bath and new exterior patio. 2nd floor: relocate stairs to 1st floor. remove deck at rear.Details
1st floor: add 1 bedroom, 1 family room, 1 full bath and new exterior patio. 2nd floor: relocate stairs to 1st floor. remove deck at rear. | $65,000 |
| Dec 23, 2015 | Never finaled issued Dec 2015, no final | 176 Capistrano Av | replace til for (1) bathroom , bathtub, shower pan. no relocation. replace rotten siding of house on southern side, 20'x10' and rotten deck boards, only boards, not replacing joist or beam. replace one windown in bathroom with similar size.new tile over (e) front stair entry.Details
replace til for (1) bathroom , bathtub, shower pan. no relocation. replace rotten siding of house on southern side, 20'x10' and rotten deck boards, only boards, not replacing joist or beam. replace one windown in bathroom with similar size.new tile over (e) front stair entry. | $5,000 |
| May 27, 2015 | Never finaled issued Jun 2015, no final | 549 Flood Av | 1) ground floor: convert extg family rm to study and extg playroom to family rm. add a full bath, half bath and walk in closet and laundry room. 2) remove extg int. stair and add a nw stair. 3) enlarge one extg bedrom on 2nd fl. revision to app#201503181172.Details
1) ground floor: convert extg family rm to study and extg playroom to family rm. add a full bath, half bath and walk in closet and laundry room. 2) remove extg int. stair and add a nw stair. 3) enlarge one extg bedrom on 2nd fl. revision to app#201503181172. | $15,000 |
| Mar 18, 2015 | Completed final sign-off Nov 2015 | 549 Flood Av | convert (e) playroom to study room, legalize (e) family room, add a full bath, a half bath & walk in closet on ground floor. add storage rm, washer , dryer & relocated w. h. & furnace on ground flr. infill (e) second flr lightwell to make a deck & remove the stair.Details
convert (e) playroom to study room, legalize (e) family room, add a full bath, a half bath & walk in closet on ground floor. add storage rm, washer , dryer & relocated w. h. & furnace on ground flr. infill (e) second flr lightwell to make a deck & remove the stair. | $40,000 |
| Jun 3, 2013 | Completed final sign-off Dec 2013 | 17 Lyell St | new habitable rooms within existing open ground/basement floor area including new bathroom per planDetails
new habitable rooms within existing open ground/basement floor area including new bathroom per plan | $20,000 |
| Jan 25, 2013 | Completed final sign-off Jun 2013 | 1266 29th Av | remodel 1st floor (garage)-add 3 bedrooms, 1/2 bathroom, laundry room & storage roomDetails
remodel 1st floor (garage)-add 3 bedrooms, 1/2 bathroom, laundry room & storage room | $53,000 |
| Jan 23, 2013 | Completed final sign-off Jun 2013 | 71 Bannock St | remodel ground floor: add 2 bedrooms. laundry, storage and full bath.Details
remodel ground floor: add 2 bedrooms. laundry, storage and full bath. | $50,000 |
| Sep 22, 2011 | Completed final sign-off Nov 2012 | 142 Sylvan Dr | re-configure (e) family room, remodel (e) bathroom & laundry room at 1st floor. add new bedroom at 1st floor, as per plans. approx 283 sq ft, replace (e) furnace, relocate (e) electrical panelDetails
re-configure (e) family room, remodel (e) bathroom & laundry room at 1st floor. add new bedroom at 1st floor, as per plans. approx 283 sq ft, replace (e) furnace, relocate (e) electrical panel | $28,000 |