Back to kitchen remodel contractors
Green Construction
- Based in
- Pacifica
- On San Francisco permits
- Jul 2005 to Jan 2015
- Last 24 months
- 0 permits filed
17 permits since 2000: 11 completed, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 0 days from filing to permit and 234 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 1, 2013 | Completed final sign-off Mar 2014 | 110 Kenwood Wy | replace counter tops in the kitchen, replace the flooring in the kitchen, repl existing window in the kitchen (same size), repl the diswasher (same location), window to be tempered glass (not visible to the street)Details
replace counter tops in the kitchen, replace the flooring in the kitchen, repl existing window in the kitchen (same size), repl the diswasher (same location), window to be tempered glass (not visible to the street) | $8,000 |
| Oct 12, 2011 | Completed final sign-off Nov 2012 | 1767 Church St | remodel of e 3rd fl kitchen and bath. relocation of laundry. all work on 3rd flr. lighting to comply with cec 150 (e).Details
remodel of e 3rd fl kitchen and bath. relocation of laundry. all work on 3rd flr. lighting to comply with cec 150 (e). | $60,000 |
| Oct 23, 2009 | Completed final sign-off Mar 2010 | 1784 Beach St | kitchen remodel-demo out kitchen, install new light fixtures, outlets & switches. install new plumbing where needed. install new plumbing fixtures, install sheetrock, cabinets, counter tops & new floor. install appliancesDetails
kitchen remodel-demo out kitchen, install new light fixtures, outlets & switches. install new plumbing where needed. install new plumbing fixtures, install sheetrock, cabinets, counter tops & new floor. install appliances | $42,000 |
| Jul 11, 2005 | Completed final sign-off Oct 2005 | 431 Vicksburg St | kitchen remodel on g/f: (n)sink,cabinets,countertop,microwave,oven,fridge.not structuralDetails
kitchen remodel on g/f: (n)sink,cabinets,countertop,microwave,oven,fridge.not structural | $9,500 |