Block 6637, lot 034
1767 Church St
- City’s use
- Multi-Family Residential
- Built
- 1928
- Stories
- 2
- Units
- 2
- Rooms
- 2 bathrooms
- Building
- 3,285 sq ft
- Lot
- 1,650 sq ft
- Zoning
- NC1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 22, 2019 | Completed final sign-off Feb 2021 | 1767 Church St | change of use. limited restaurant. hand sink & dish sink connected to pre existing plumbing.new grab bars in toilet, new accessible hardware @ front door, new 10" plate @ front door.Details
change of use. limited restaurant. hand sink & dish sink connected to pre existing plumbing.new grab bars in toilet, new accessible hardware @ front door, new 10" plate @ front door. | $1,000 | |
| Feb 7, 2017 | Completed final sign-off Apr 2017 | 1775 Church St | Sarris Construction | replace 17 top floor windows with marvin alum-clad wood windows w/ raised muuntin profile w/ black spacers to match original window design - vertical muntin w/ ogee lug - cottage proportions (original window is shown on upper left elevation). u factor max. .32Details
replace 17 top floor windows with marvin alum-clad wood windows w/ raised muuntin profile w/ black spacers to match original window design - vertical muntin w/ ogee lug - cottage proportions (original window is shown on upper left elevation). u factor max. .32 | $17,000 |
| Jan 2, 2014 | Completed final sign-off Mar 2014 | 1775 Church St | Rescue Roofing Co | reroofingDetails
reroofing | $7,800 |
| Dec 15, 2011 | Never finaled issued Dec 2011, no final | 1767 Church St | street space with metersDetails
street space with meters | ||
| Oct 12, 2011 | Completed final sign-off Nov 2012 | 1767 Church St | Green Construction | remodel of e 3rd fl kitchen and bath. relocation of laundry. all work on 3rd flr. lighting to comply with cec 150 (e).Details
remodel of e 3rd fl kitchen and bath. relocation of laundry. all work on 3rd flr. lighting to comply with cec 150 (e). | $60,000 |
| Aug 28, 2007 | Never finaled issued Aug 2007, no final | 1775 Church St | street space & sidewalk permit only.Details
street space & sidewalk permit only. | ||
| Jul 13, 2007 | Never finaled issued Jul 2007, no final | 1775 Church St | street space permit only.Details
street space permit only. |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.