Back to kitchen remodel contractors
Green Builders
- Based in
- Vallejo
- On San Francisco permits
- Jun 2012 to Dec 2016
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 never finaled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 never finaled. Typically 4 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 16, 2016 | Never finaled issued Dec 2016, no final | 544 29th Av | remove and replace cabinets in kitchen, new floor, replace valves, remove and replace outlets, gfi, remove bath cabinets and tub toilet. no walls moved, removed, added or infilled. all existing layouts to remain unchanged.Details
remove and replace cabinets in kitchen, new floor, replace valves, remove and replace outlets, gfi, remove bath cabinets and tub toilet. no walls moved, removed, added or infilled. all existing layouts to remain unchanged. | $22,000 |