Block 1516, lot 030
542 29th Ave
- City’s use
- Multi-Family Residential
- Built
- 1948
- Stories
- 3
- Units
- 2
- Rooms
- 5 bedrooms, 4 bathrooms
- Building
- 2,784 sq ft
- Lot
- 3,000 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 13, 2018 | Completed final sign-off Sep 2018 | 542 29th Av | Clifton Eugene Evans | top unit replace rear windows and south w slider and balcony. mid unit add spairal stair and create 403 additonal conditioned space at garage level. replace 5 windows, new slider and window 1st fl remodel kitchen and bath, new nailed plywood and clips, garage new furnaces and 5/8" type x gwbDetails
top unit replace rear windows and south w slider and balcony. mid unit add spairal stair and create 403 additonal conditioned space at garage level. replace 5 windows, new slider and window 1st fl remodel kitchen and bath, new nailed plywood and clips, garage new furnaces and 5/8" type x gwb | $65,000 |
| Mar 21, 2018 | Completed final sign-off Sep 2018 | 542 29th Av | remodel extg kitchen and bath, create new laundry and 3/4 bath. replace front elevation and kitchen windows min u factor .40 (75 sf or less) windows to be wood/mtl clad. voluntary plywood wall sheathing top unit work only.Details
remodel extg kitchen and bath, create new laundry and 3/4 bath. replace front elevation and kitchen windows min u factor .40 (75 sf or less) windows to be wood/mtl clad. voluntary plywood wall sheathing top unit work only. | $30,000 | |
| Dec 16, 2016 | Never finaled issued Dec 2016, no final | 544 29th Av | Green Builders | remove and replace cabinets in kitchen, new floor, replace valves, remove and replace outlets, gfi, remove bath cabinets and tub toilet. no walls moved, removed, added or infilled. all existing layouts to remain unchanged.Details
remove and replace cabinets in kitchen, new floor, replace valves, remove and replace outlets, gfi, remove bath cabinets and tub toilet. no walls moved, removed, added or infilled. all existing layouts to remain unchanged. | $22,000 |
| Oct 8, 2010 | Completed final sign-off Dec 2010 | 542 29th Av | Sears Home Improvemt Prod, | repl 4 windows on rear of house, not visible from the street, no structural changes, max u factor .40Details
repl 4 windows on rear of house, not visible from the street, no structural changes, max u factor .40 | $3,001 |
| Jun 3, 2005 | Completed final sign-off Jun 2005 | 542 29th Av | Bryson Roofing Inc | reroofingDetails
reroofing | $8,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.