Back to kitchen remodel contractors
Great River Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Oct 2000 to Nov 2018
- Last 24 months
- 0 permits filed
69 permits since 2000: 58 completed, 9 never finaled, 2 expired or cancelled.
Of the 9 never-finaled permits, 9 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
28 kitchen remodel permits: 25 completed, 3 never finaled. Typically 0 days from filing to permit and 166 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 6, 2018 | Completed final sign-off Feb 2021 | 1850 42nd Av | remodel kitchen and 2 full bathrooms w/all new cabinetsm fixyures and finishes. relocate gas furnance, w/hm and laundry into garage. remove wall from kitchen to liv rmDetails
remodel kitchen and 2 full bathrooms w/all new cabinetsm fixyures and finishes. relocate gas furnance, w/hm and laundry into garage. remove wall from kitchen to liv rm | $38,000 |
| Apr 30, 2018 | Completed final sign-off Aug 2018 | 380 17th Av | kitchen remodel no structural workDetails
kitchen remodel no structural work | $20,000 |
| Apr 27, 2018 | Completed final sign-off Nov 2018 | 1449 Plymouth Av | remodel kitchen within (e) envelope. increase headroom over basement stairsDetails
remodel kitchen within (e) envelope. increase headroom over basement stairs | $50,000 |
| Oct 25, 2017 | Completed final sign-off Nov 2018 | 76 Country Club Dr | 2nd floor - remodel (e) kitchen with new cabinets. appliance, island and counter. new light fixtures, remodel both bathrooms on the second floorDetails
2nd floor - remodel (e) kitchen with new cabinets. appliance, island and counter. new light fixtures, remodel both bathrooms on the second floor | $15,000 |
| Jun 2, 2017 | Completed final sign-off Mar 2018 | 1927 20th Av | remodel kitchen with all new cabinets, fixtures, finishes and skylight. remodel master bathroom on 2nd floor with all new fixtures and finishes. add new hallway for master bedroom. remodel (e) hall bathroom.Details
remodel kitchen with all new cabinets, fixtures, finishes and skylight. remodel master bathroom on 2nd floor with all new fixtures and finishes. add new hallway for master bedroom. remodel (e) hall bathroom. | $26,000 |
| Dec 20, 2016 | Completed final sign-off Jun 2017 | 380 17th Av | scope of work: interior renovation of bedrooms, bathrooms and kitchen with no structural work.Details
scope of work: interior renovation of bedrooms, bathrooms and kitchen with no structural work. | $60,000 |
| Dec 16, 2016 | Completed final sign-off Jan 2017 | 1930 Hayes St | unit # 3 - one remodel kitchen on 2nd floor. install new cabinets, countertops, lighting & sink. n/a maher ordinanceDetails
unit # 3 - one remodel kitchen on 2nd floor. install new cabinets, countertops, lighting & sink. n/a maher ordinance | $12,000 |
| May 24, 2016 | Never finaled filed May 2016, never issued | 220 Lobos St | legalize (e) dwelling unit with kitchen on 2nd floor. comply with ordinance #33-16 and per ordinance #43-14.Details
legalize (e) dwelling unit with kitchen on 2nd floor. comply with ordinance #33-16 and per ordinance #43-14. | $8,200 |
| Sep 30, 2015 | Completed final sign-off Oct 2016 | 128 Bartlett St | remove extg illegal kitchen with cooking equipment, sink, cabinets and counter top on ground floor. remodel to have half bath and storage rooms in ground floor.Details
remove extg illegal kitchen with cooking equipment, sink, cabinets and counter top on ground floor. remodel to have half bath and storage rooms in ground floor. | $2,500 |
| Jun 29, 2015 | Completed final sign-off Jul 2015 | 250 Lowell St | remove non-load bearing kitchen wall.Details
remove non-load bearing kitchen wall. | $1,500 |
| Apr 8, 2015 | Completed final sign-off Apr 2015 | 819 Brussels St | revision appl. 2013.0417.4760 to remove kitchen wall and cabinet layout per plan.Details
revision appl. 2013.0417.4760 to remove kitchen wall and cabinet layout per plan. | $1,000 |
| Sep 15, 2014 | Completed final sign-off Jan 2015 | 25 Beachmont Dr | kitchen remodel. no structural work, same layout & configurationDetails
kitchen remodel. no structural work, same layout & configuration | $12,000 |
| Feb 28, 2014 | Completed final sign-off Oct 2014 | 85 Delano Av | kitchen& bathroom renovation, (total area of work = 315 s.f.)Details
kitchen& bathroom renovation, (total area of work = 315 s.f.) | $30,000 |
| Jan 30, 2014 | Completed final sign-off May 2014 | 167 Cook St | kitchen and bath room remodeling. walls to remain in existing locations, all layout to remain the same.Details
kitchen and bath room remodeling. walls to remain in existing locations, all layout to remain the same. | $20,000 |
| Oct 15, 2013 | Completed final sign-off Dec 2013 | 4025 Irving St | rear bldg:complete kitchen remodel to replace all new cabinets, fixtures, countertop. no structural work.Details
rear bldg:complete kitchen remodel to replace all new cabinets, fixtures, countertop. no structural work. | $9,500 |
| Oct 2, 2013 | Never finaled issued Oct 2013, no final | 243 17th Av | remove existing kitchen on gr fl. convert space back to laundry. laundry was legally built on 2004 per 200410066080. remove e bathtub on gr fl. convert space to 1/2 bath per 2004100066080Details
remove existing kitchen on gr fl. convert space back to laundry. laundry was legally built on 2004 per 200410066080. remove e bathtub on gr fl. convert space to 1/2 bath per 2004100066080 | $4,000 |
| May 17, 2013 | Completed final sign-off Nov 2013 | 900 Mansell St | remodel ground fl to have 2 bedrooms, 2 full bathroom & laundry. relocate (e) gas furnace, water heater in garage. 2nd fl-remodel kitchen entirely, convert (e) half bathroom to full bathroom. add 1 full bathroom, remodel to have 2 bedrooms. 3rd fl-add 1 full bathroom in master bedroomDetails
remodel ground fl to have 2 bedrooms, 2 full bathroom & laundry. relocate (e) gas furnace, water heater in garage. 2nd fl-remodel kitchen entirely, convert (e) half bathroom to full bathroom. add 1 full bathroom, remodel to have 2 bedrooms. 3rd fl-add 1 full bathroom in master bedroom | $70,000 |
| Feb 26, 2013 | Completed final sign-off Mar 2013 | 1734 26th Av | kitchen remodel to replace with new cabinets, coutnerop, kitchen sink. 7' countertop small kitchen.Details
kitchen remodel to replace with new cabinets, coutnerop, kitchen sink. 7' countertop small kitchen. | $4,000 |
| Jun 8, 2012 | Completed final sign-off Jun 2014 | 3433 Kirkham St | remodel 1st floor: new family room, 1 bedroom, 1 full bathroom & laundry. remodel (e) 2nd floor bathroom, kitchen & add a new master bathroom.Details
remodel 1st floor: new family room, 1 bedroom, 1 full bathroom & laundry. remodel (e) 2nd floor bathroom, kitchen & add a new master bathroom. | $70,000 |
| May 30, 2012 | Completed final sign-off Jan 2013 | 2254 44th Av | kitchen remodel to replace all fixtures and cabinets on 2nd floor.Details
kitchen remodel to replace all fixtures and cabinets on 2nd floor. | $9,500 |
| May 24, 2012 | Completed final sign-off Mar 2013 | 1966 46th Av | kitchen and one & one half bath remodel on 2/f. replace all fixtures & cabinets.Details
kitchen and one & one half bath remodel on 2/f. replace all fixtures & cabinets. | $15,000 |
| Mar 28, 2012 | Completed final sign-off Apr 2012 | 1900 Sutter St | kitchen & bathroom remodel. to replace all fixts & cabinets.Details
kitchen & bathroom remodel. to replace all fixts & cabinets. | $13,500 |
| Jul 13, 2010 | Completed final sign-off Sep 2010 | 1345 Diamond St | remodel 2/f kitchen with new fixtures, cabinets, coutnertop, repalce vanity and toilet with new in existing bathroom. replace 16 windows with new, same sizes, double glazed, u-valve = 0.35 or less.Details
remodel 2/f kitchen with new fixtures, cabinets, coutnertop, repalce vanity and toilet with new in existing bathroom. replace 16 windows with new, same sizes, double glazed, u-valve = 0.35 or less. | $14,000 |
| Dec 1, 2009 | Completed final sign-off Jan 2011 | 4125 Cabrillo St | remodel gr.fl.1 bedroom,1 full bath, family rm.install new gas furnace, water, water heater and laundry in garage. remodel 2nd fl kitchen with new cabinets, countertops & fixtures.remodel 1 full bath with new fixtures & finishes.add skylight & fireplace. replace windows w/ new double pane windowsDetails
remodel gr.fl.1 bedroom,1 full bath, family rm.install new gas furnace, water, water heater and laundry in garage. remodel 2nd fl kitchen with new cabinets, countertops & fixtures.remodel 1 full bath with new fixtures & finishes.add skylight & fireplace. replace windows w/ new double pane windows | $40,000 |
| Jul 30, 2007 | Never finaled issued Jul 2007, no final | 362 Louisburg St | kitchen & bathrm remodeling, 50% of lighting @ kitchen.Details
kitchen & bathrm remodeling, 50% of lighting @ kitchen. | $30,000 |
| Dec 7, 2006 | Completed final sign-off May 2009 | 555 20th Av | remodel rear of bldg &add towards rear of bldg modify plans to have:1st fl-2 car parking spaces, study room, family room, bedroom,library&bath. 2nd fl-living room, entertainment room, study, office,kitche,deck. 3rd fl,unit #2 - living room, dining room,office,kitchen,bathroom and deck.Details
remodel rear of bldg &add towards rear of bldg modify plans to have:1st fl-2 car parking spaces, study room, family room, bedroom,library&bath. 2nd fl-living room, entertainment room, study, office,kitche,deck. 3rd fl,unit #2 - living room, dining room,office,kitchen,bathroom and deck. | $160,000 |
| Jul 28, 2006 | Completed final sign-off Jan 2007 | 2383 16th Av | kitchen & bathroom remodeling.Details
kitchen & bathroom remodeling. | $18,000 |
| Oct 7, 2004 | Completed final sign-off Jan 2006 | 2385 16th Av | kitchen and bath remodeling, in-kind replacement of exterior stair in backyard, less than 50% replacDetails
kitchen and bath remodeling, in-kind replacement of exterior stair in backyard, less than 50% replac | $30,000 |