Back to bathroom remodel contractors
Great River Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Oct 2000 to Nov 2018
- Last 24 months
- 0 permits filed
69 permits since 2000: 58 completed, 9 never finaled, 2 expired or cancelled.
Of the 9 never-finaled permits, 9 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
33 bathroom remodel permits: 28 completed, 5 never finaled. Typically 2 days from filing to permit and 211 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 17, 2018 | Completed final sign-off Sep 2019 | 52 Broadmoor Dr | remodel 2 full bathrooms on 2nd floorDetails
remodel 2 full bathrooms on 2nd floor | $28,000 |
| Jul 6, 2018 | Completed final sign-off Jun 2019 | 1559 28th Av | remodel grnd flr to have master suite with full bathroom, walkin closet and laundry rm. install new gas furnance and water heater in garage.Details
remodel grnd flr to have master suite with full bathroom, walkin closet and laundry rm. install new gas furnance and water heater in garage. | $47,000 |
| Jul 6, 2018 | Completed final sign-off Feb 2021 | 1850 42nd Av | remodel kitchen and 2 full bathrooms w/all new cabinetsm fixyures and finishes. relocate gas furnance, w/hm and laundry into garage. remove wall from kitchen to liv rmDetails
remodel kitchen and 2 full bathrooms w/all new cabinetsm fixyures and finishes. relocate gas furnance, w/hm and laundry into garage. remove wall from kitchen to liv rm | $38,000 |
| Oct 25, 2017 | Completed final sign-off Nov 2018 | 76 Country Club Dr | 2nd floor - remodel (e) kitchen with new cabinets. appliance, island and counter. new light fixtures, remodel both bathrooms on the second floorDetails
2nd floor - remodel (e) kitchen with new cabinets. appliance, island and counter. new light fixtures, remodel both bathrooms on the second floor | $15,000 |
| Oct 23, 2017 | Completed final sign-off Jul 2020 | 789 Buena Vista Ave West Av | unit 102: renovation of interior space of extg bathroom and bedroom. there is no structural work to be performed. total area of work = 231 sq ft.Details
unit 102: renovation of interior space of extg bathroom and bedroom. there is no structural work to be performed. total area of work = 231 sq ft. | $50,000 |
| Jun 2, 2017 | Completed final sign-off Mar 2018 | 1927 20th Av | remodel kitchen with all new cabinets, fixtures, finishes and skylight. remodel master bathroom on 2nd floor with all new fixtures and finishes. add new hallway for master bedroom. remodel (e) hall bathroom.Details
remodel kitchen with all new cabinets, fixtures, finishes and skylight. remodel master bathroom on 2nd floor with all new fixtures and finishes. add new hallway for master bedroom. remodel (e) hall bathroom. | $26,000 |
| May 15, 2017 | Completed final sign-off Sep 2017 | 3628 Fulton St | master bathroom addition @ 3rd floor (55 sq)Details
master bathroom addition @ 3rd floor (55 sq) | $7,500 |
| Apr 7, 2017 | Completed final sign-off Jun 2017 | 1277 Union St | legalize (1) bedroom & (1) full bath on lower level/basement floor. convert existing storage space at basement level to habitable space of approx. 510 sf, including a bedroom andDetails
legalize (1) bedroom & (1) full bath on lower level/basement floor. convert existing storage space at basement level to habitable space of approx. 510 sf, including a bedroom and | $25,000 |
| Dec 20, 2016 | Completed final sign-off Jun 2017 | 380 17th Av | scope of work: interior renovation of bedrooms, bathrooms and kitchen with no structural work.Details
scope of work: interior renovation of bedrooms, bathrooms and kitchen with no structural work. | $60,000 |
| May 13, 2016 | Never finaled issued May 2016, no final | 108 Farnum St | revision to pa#201507141431 to revise work description to "improvement of unfinished lower floor to have 1 bedroom, 1 full bathroom & closet, total improvement area =336 sq.ft., no deck & bay window work, application match drawing scope.Details
revision to pa#201507141431 to revise work description to "improvement of unfinished lower floor to have 1 bedroom, 1 full bathroom & closet, total improvement area =336 sq.ft., no deck & bay window work, application match drawing scope. | |
| Sep 30, 2015 | Completed final sign-off Oct 2016 | 128 Bartlett St | remove extg illegal kitchen with cooking equipment, sink, cabinets and counter top on ground floor. remodel to have half bath and storage rooms in ground floor.Details
remove extg illegal kitchen with cooking equipment, sink, cabinets and counter top on ground floor. remodel to have half bath and storage rooms in ground floor. | $2,500 |
| Sep 25, 2015 | Completed final sign-off Nov 2015 | 2327 39th Av | remodel 2 full bathrooms on 2nd floor with new plumbing & lighting fixtures. (e) bathtub in one bathroom will remain. no wall changes.Details
remodel 2 full bathrooms on 2nd floor with new plumbing & lighting fixtures. (e) bathtub in one bathroom will remain. no wall changes. | $19,500 |
| Jul 14, 2015 | Completed final sign-off May 2016 | 108 Farnum St | improvement of unfinished lower level to include one bedroom, bathroom & closet. new deck & bay window on upper level. total improvement area = 354 s.f.Details
improvement of unfinished lower level to include one bedroom, bathroom & closet. new deck & bay window on upper level. total improvement area = 354 s.f. | $80,000 |
| Jan 12, 2015 | Never finaled issued Jan 2015, no final | 50 Venus St | remove existing cooking equipement, sink, cabinets on gr fl. legalize 2nd full bath on gr flDetails
remove existing cooking equipement, sink, cabinets on gr fl. legalize 2nd full bath on gr fl | $4,000 |
| Nov 24, 2014 | Completed final sign-off Mar 2015 | 2845 Ocean Av | replace all plumbing and lightinhg fixtures in exiting full bathroom on ground floor; to comply with cec150.0(k)5Details
replace all plumbing and lightinhg fixtures in exiting full bathroom on ground floor; to comply with cec150.0(k)5 | $8,500 |
| Feb 28, 2014 | Completed final sign-off Oct 2014 | 85 Delano Av | kitchen& bathroom renovation, (total area of work = 315 s.f.)Details
kitchen& bathroom renovation, (total area of work = 315 s.f.) | $30,000 |
| Jan 30, 2014 | Completed final sign-off May 2014 | 167 Cook St | kitchen and bath room remodeling. walls to remain in existing locations, all layout to remain the same.Details
kitchen and bath room remodeling. walls to remain in existing locations, all layout to remain the same. | $20,000 |
| Oct 2, 2013 | Never finaled issued Oct 2013, no final | 243 17th Av | remove existing kitchen on gr fl. convert space back to laundry. laundry was legally built on 2004 per 200410066080. remove e bathtub on gr fl. convert space to 1/2 bath per 2004100066080Details
remove existing kitchen on gr fl. convert space back to laundry. laundry was legally built on 2004 per 200410066080. remove e bathtub on gr fl. convert space to 1/2 bath per 2004100066080 | $4,000 |
| May 17, 2013 | Completed final sign-off Nov 2013 | 900 Mansell St | remodel ground fl to have 2 bedrooms, 2 full bathroom & laundry. relocate (e) gas furnace, water heater in garage. 2nd fl-remodel kitchen entirely, convert (e) half bathroom to full bathroom. add 1 full bathroom, remodel to have 2 bedrooms. 3rd fl-add 1 full bathroom in master bedroomDetails
remodel ground fl to have 2 bedrooms, 2 full bathroom & laundry. relocate (e) gas furnace, water heater in garage. 2nd fl-remodel kitchen entirely, convert (e) half bathroom to full bathroom. add 1 full bathroom, remodel to have 2 bedrooms. 3rd fl-add 1 full bathroom in master bedroom | $70,000 |
| Jun 8, 2012 | Completed final sign-off Jun 2014 | 3433 Kirkham St | remodel 1st floor: new family room, 1 bedroom, 1 full bathroom & laundry. remodel (e) 2nd floor bathroom, kitchen & add a new master bathroom.Details
remodel 1st floor: new family room, 1 bedroom, 1 full bathroom & laundry. remodel (e) 2nd floor bathroom, kitchen & add a new master bathroom. | $70,000 |
| May 24, 2012 | Completed final sign-off Mar 2013 | 1966 46th Av | kitchen and one & one half bath remodel on 2/f. replace all fixtures & cabinets.Details
kitchen and one & one half bath remodel on 2/f. replace all fixtures & cabinets. | $15,000 |
| Mar 28, 2012 | Completed final sign-off Apr 2012 | 1900 Sutter St | kitchen & bathroom remodel. to replace all fixts & cabinets.Details
kitchen & bathroom remodel. to replace all fixts & cabinets. | $13,500 |
| Feb 8, 2011 | Completed final sign-off Aug 2011 | 2152 20th Av | to comply w/compliant #200562274 - remodel ground floor to have 1 bedroom with walk-in closet, 1 full bathroom & game room/family room.Details
to comply w/compliant #200562274 - remodel ground floor to have 1 bedroom with walk-in closet, 1 full bathroom & game room/family room. | $40,000 |
| Jul 13, 2010 | Completed final sign-off Sep 2010 | 1345 Diamond St | remodel 2/f kitchen with new fixtures, cabinets, coutnertop, repalce vanity and toilet with new in existing bathroom. replace 16 windows with new, same sizes, double glazed, u-valve = 0.35 or less.Details
remodel 2/f kitchen with new fixtures, cabinets, coutnertop, repalce vanity and toilet with new in existing bathroom. replace 16 windows with new, same sizes, double glazed, u-valve = 0.35 or less. | $14,000 |
| Dec 1, 2009 | Completed final sign-off Jan 2011 | 4125 Cabrillo St | remodel gr.fl.1 bedroom,1 full bath, family rm.install new gas furnace, water, water heater and laundry in garage. remodel 2nd fl kitchen with new cabinets, countertops & fixtures.remodel 1 full bath with new fixtures & finishes.add skylight & fireplace. replace windows w/ new double pane windowsDetails
remodel gr.fl.1 bedroom,1 full bath, family rm.install new gas furnace, water, water heater and laundry in garage. remodel 2nd fl kitchen with new cabinets, countertops & fixtures.remodel 1 full bath with new fixtures & finishes.add skylight & fireplace. replace windows w/ new double pane windows | $40,000 |
| Sep 1, 2009 | Completed final sign-off Sep 2009 | 1353 09th Av | unit #6: bathroom remodeling- change plumbing fixture, tile and repaint; no structure changeDetails
unit #6: bathroom remodeling- change plumbing fixture, tile and repaint; no structure change | $5,000 |
| Apr 7, 2009 | Never finaled issued Apr 2009, no final | 1973 20th Av | remodel ground floor to have 2-bedrooms, 1-full bathroom and 1-family room. install new gas furnance, (e) water heater and laundry sink in garage.Details
remodel ground floor to have 2-bedrooms, 1-full bathroom and 1-family room. install new gas furnance, (e) water heater and laundry sink in garage. | $52,000 |
| Jan 7, 2008 | Never finaled issued Jan 2008, no final | 790 23rd Av | bathroom remodeling (3) at 3nd floor. no structural. new lighting to be fluorescant or on occupant sensor.Details
bathroom remodeling (3) at 3nd floor. no structural. new lighting to be fluorescant or on occupant sensor. | $20,000 |
| Dec 7, 2006 | Completed final sign-off May 2009 | 555 20th Av | remodel rear of bldg &add towards rear of bldg modify plans to have:1st fl-2 car parking spaces, study room, family room, bedroom,library&bath. 2nd fl-living room, entertainment room, study, office,kitche,deck. 3rd fl,unit #2 - living room, dining room,office,kitchen,bathroom and deck.Details
remodel rear of bldg &add towards rear of bldg modify plans to have:1st fl-2 car parking spaces, study room, family room, bedroom,library&bath. 2nd fl-living room, entertainment room, study, office,kitche,deck. 3rd fl,unit #2 - living room, dining room,office,kitchen,bathroom and deck. | $160,000 |
| Jul 28, 2006 | Completed final sign-off Jan 2007 | 2383 16th Av | kitchen & bathroom remodeling.Details
kitchen & bathroom remodeling. | $18,000 |
| Oct 7, 2004 | Completed final sign-off Jan 2006 | 2385 16th Av | kitchen and bath remodeling, in-kind replacement of exterior stair in backyard, less than 50% replacDetails
kitchen and bath remodeling, in-kind replacement of exterior stair in backyard, less than 50% replac | $30,000 |
| Dec 13, 2002 | Completed final sign-off Jul 2003 | 2718 San Jose Av | add 1 new bath room at 2/fl areaDetails
add 1 new bath room at 2/fl area | $4,000 |
| May 6, 2002 | Completed final sign-off Aug 2002 | 758 45th Av | remove extng plaster for interior wall.replace w/ new sheetrock drywall,living rm,dining,2bdrms,bathDetails
remove extng plaster for interior wall.replace w/ new sheetrock drywall,living rm,dining,2bdrms,bath | $10,000 |