Back to kitchen remodel contractors
Great American Navigator Dba Ganco
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Aug 2014
- Last 24 months
- 0 permits filed
43 permits since 2000: 37 completed, 1 never finaled, 5 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
14 kitchen remodel permits: 12 completed, 2 expired or cancelled. Typically 0 days from filing to permit and 181 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 15, 2014 | Completed final sign-off Dec 2014 | 914 Wisconsin St | unit #2. remodel kitchen in unit 2; ;to comply with cec150.0(k)3; and add washer and dryer at g/f garage areaDetails
unit #2. remodel kitchen in unit 2; ;to comply with cec150.0(k)3; and add washer and dryer at g/f garage area | $25,000 |
| Dec 30, 2013 | Completed final sign-off Nov 2014 | 559 Shotwell St | replace kitchen cabs & counter tops, remodel bathroom. all work in unit 559d. no structural changes, no change layout.Details
replace kitchen cabs & counter tops, remodel bathroom. all work in unit 559d. no structural changes, no change layout. | $20,000 |
| Dec 30, 2013 | Completed final sign-off Jun 2014 | 914 Wisconsin St | replace kitchen cabs & counter tops, floor finish on unit 3 & 4. replace tub, toilets & vanity unit 3. no structural changes, no change layout.Details
replace kitchen cabs & counter tops, floor finish on unit 3 & 4. replace tub, toilets & vanity unit 3. no structural changes, no change layout. | $35,000 |
| Jul 9, 2009 | Completed final sign-off Jan 2010 | 559 Shotwell St | remodel kitchen and bathroom. replace cabinets and fixtures @ 4th flDetails
remodel kitchen and bathroom. replace cabinets and fixtures @ 4th fl | $18,500 |
| Jun 11, 2007 | Completed final sign-off Oct 2007 | 561 Shotwell St | remodel kitchen: replace cabinets, remove partitions at pantry. remodel bathroom, replace fixtures. kitchen: at least 50% lighting wattage must be fluorescent. bathroom: fluorescent lighting or occupany sensor control. exhaust fan termination 3 feet min. from p.l and bldg. openings.Details
remodel kitchen: replace cabinets, remove partitions at pantry. remodel bathroom, replace fixtures. kitchen: at least 50% lighting wattage must be fluorescent. bathroom: fluorescent lighting or occupany sensor control. exhaust fan termination 3 feet min. from p.l and bldg. openings. | $5,000 |
| Mar 19, 2007 | Completed final sign-off Sep 2007 | 1907 Leavenworth St | kitchen remodel, replace cabinets, sink and install hardwood floor, remove 8'6" wall, replace with 4x12 beam.Details
kitchen remodel, replace cabinets, sink and install hardwood floor, remove 8'6" wall, replace with 4x12 beam. | $45,000 |
| Sep 28, 2006 | Completed final sign-off Jun 2007 | 911 Naples St | remodel kitchen in like kind add skylight in kithen. flourescent lightingDetails
remodel kitchen in like kind add skylight in kithen. flourescent lighting | $40,000 |
| Nov 28, 2001 | Expired or cancelled expired Jun 2002 | 165 Peralta Av | replace kitchen cabinets,linoleum & add electrical outlets. replace bath cabinet,linoleum.new appliaDetails
replace kitchen cabinets,linoleum & add electrical outlets. replace bath cabinet,linoleum.new applia | $5,000 |
| May 30, 2001 | Completed final sign-off May 2002 | 3784 20th St | kitchen remodel both units, redo partial roof framing over flat roof area, new hvac to be installedDetails
kitchen remodel both units, redo partial roof framing over flat roof area, new hvac to be installed | $100,000 |
| Apr 12, 2001 | Completed final sign-off Aug 2001 | 2021 Oak St | convert (e) bedrm, to (n) bathrm & walkin closet, remodel (e) bathrm, replace kitchen cabinets & appDetails
convert (e) bedrm, to (n) bathrm & walkin closet, remodel (e) bathrm, replace kitchen cabinets & app | $32,000 |
| Mar 9, 2001 | Expired or cancelled expired Jun 2002 | 165 Peralta Av | repl kitchen cabinets,counter tops,add outlets; work on unit 3 onlyDetails
repl kitchen cabinets,counter tops,add outlets; work on unit 3 only | $6,000 |
| Nov 20, 2000 | Completed final sign-off Feb 2001 | 2853 Sacramento St | kitchen remodel- replace cabinets & countertops work in unit 2857 sac only.Details
kitchen remodel- replace cabinets & countertops work in unit 2857 sac only. | $15,000 |
| Jul 14, 2000 | Completed final sign-off Feb 2001 | 165 Peralta Av | kitchen remodeling unit #2Details
kitchen remodeling unit #2 | $6,000 |
| Mar 10, 2000 | Completed final sign-off May 2000 | 165 Peralta Av | remodel kitchen of unit #6,replace cabients,countertops,appliances,Details
remodel kitchen of unit #6,replace cabients,countertops,appliances, |