Back to bathroom remodel contractors
Great American Navigator Dba Ganco
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Aug 2014
- Last 24 months
- 0 permits filed
43 permits since 2000: 37 completed, 1 never finaled, 5 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 8 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 162 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 30, 2013 | Completed final sign-off Nov 2014 | 559 Shotwell St | replace kitchen cabs & counter tops, remodel bathroom. all work in unit 559d. no structural changes, no change layout.Details
replace kitchen cabs & counter tops, remodel bathroom. all work in unit 559d. no structural changes, no change layout. | $20,000 |
| Sep 4, 2013 | Completed final sign-off May 2014 | 4120 26th St | ground floor alterations to interior walls, add bathroom at gr flDetails
ground floor alterations to interior walls, add bathroom at gr fl | $48,000 |
| Jul 9, 2009 | Completed final sign-off Jan 2010 | 559 Shotwell St | remodel kitchen and bathroom. replace cabinets and fixtures @ 4th flDetails
remodel kitchen and bathroom. replace cabinets and fixtures @ 4th fl | $18,500 |
| Jun 18, 2008 | Completed final sign-off Nov 2008 | 117 Marview Wy | remodel ground floor bathroom. replace fixtures & vanity cabinet.Details
remodel ground floor bathroom. replace fixtures & vanity cabinet. | $16,000 |
| Jun 11, 2007 | Completed final sign-off Oct 2007 | 561 Shotwell St | remodel kitchen: replace cabinets, remove partitions at pantry. remodel bathroom, replace fixtures. kitchen: at least 50% lighting wattage must be fluorescent. bathroom: fluorescent lighting or occupany sensor control. exhaust fan termination 3 feet min. from p.l and bldg. openings.Details
remodel kitchen: replace cabinets, remove partitions at pantry. remodel bathroom, replace fixtures. kitchen: at least 50% lighting wattage must be fluorescent. bathroom: fluorescent lighting or occupany sensor control. exhaust fan termination 3 feet min. from p.l and bldg. openings. | $5,000 |
| Aug 16, 2006 | Completed final sign-off Jun 2009 | 1810 16th Av | vertical addition - the project will add a partial third floor to an (e) 2-story dwelling. the partial third floor will include a master bed/bath and lounge. a full seismic upgrade will be performed as well.Details
vertical addition - the project will add a partial third floor to an (e) 2-story dwelling. the partial third floor will include a master bed/bath and lounge. a full seismic upgrade will be performed as well. | $200,000 |
| Sep 23, 2002 | Completed final sign-off Nov 2002 | 1907 Leavenworth St | remodel bathroom,replace bathtub,vanity & sink in place.no change of walls,doors,windows.Details
remodel bathroom,replace bathtub,vanity & sink in place.no change of walls,doors,windows. | $16,000 |
| Nov 28, 2001 | Expired or cancelled expired Jun 2002 | 165 Peralta Av | replace kitchen cabinets,linoleum & add electrical outlets. replace bath cabinet,linoleum.new appliaDetails
replace kitchen cabinets,linoleum & add electrical outlets. replace bath cabinet,linoleum.new applia | $5,000 |
| Jul 31, 2000 | Completed final sign-off Oct 2000 | 177 Marview Wy | remodel bathroom, replace tile shower, new floor, new toiletDetails
remodel bathroom, replace tile shower, new floor, new toilet | $8,500 |