Grand Finishes
- Based in
- San Francisco
- On San Francisco permits
- Jan 2009 to Mar 2023
- Last 24 months
- 0 permits filed
64 permits since 2000: 61 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 4 completed. Typically 10 days from filing to permit and 226 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 31, 2021 | Completed final sign-off May 2022 | 3917 19th St | kitchen & 2 bath remodl; replacement in-kind of 4th fl stair; remove (e) wood burning fireplace & replace w/direct vent gas insertDetails
kitchen & 2 bath remodl; replacement in-kind of 4th fl stair; remove (e) wood burning fireplace & replace w/direct vent gas insert | $68,000 |
| Sep 16, 2019 | Completed final sign-off Apr 2020 | 1161 Dolores St | replace fixtures and finishes in 1st fl bath and family rm. create opening between stair and hall 1st fl. remodel 2nd fl bath, kitchen, laundry. open wall between kitchen and hall. building not sprinkleredDetails
replace fixtures and finishes in 1st fl bath and family rm. create opening between stair and hall 1st fl. remodel 2nd fl bath, kitchen, laundry. open wall between kitchen and hall. building not sprinklered | $95,000 |
| Dec 16, 2016 | Completed final sign-off Apr 2019 | 500 Quintara St | add 2nd story w/ staircase, add (2)bedrooms, (1)full bath, (1) half bath, windows, back deck, gas fireplace, replace (e) garage door w/ larger opening, replace (3)(e) windows.Details
add 2nd story w/ staircase, add (2)bedrooms, (1)full bath, (1) half bath, windows, back deck, gas fireplace, replace (e) garage door w/ larger opening, replace (3)(e) windows. | $150,000 |
| Sep 4, 2015 | Completed final sign-off Jan 2016 | 2 Allston Wy | all work in basement - reframe to increase headroom by stairs. add 1/2 bath. replace 2 windows in kind, replace back door with dog door & window. replace stairwell window with larger. add partition walls for new storage areaDetails
all work in basement - reframe to increase headroom by stairs. add 1/2 bath. replace 2 windows in kind, replace back door with dog door & window. replace stairwell window with larger. add partition walls for new storage area | $50,000 |