Block 2981, lot 011
2 Allston Way
- City’s use
- Single Family Residential
- Built
- 1923
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 1,765 sq ft
- Lot
- 3,371 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 29, 2021 | Completed final sign-off Oct 2021 | 2 Allston Wy | Moreno Construction | replace a portion of the extg foundation in garage which is in poor condition and unreinforcedDetails
replace a portion of the extg foundation in garage which is in poor condition and unreinforced | $10,000 |
| Nov 5, 2019 | Never finaled issued Nov 2019, no final | 2 Allston Wy | street space onlyDetails
street space only | ||
| Jun 13, 2019 | Completed final sign-off Nov 2020 | 2 Allston Wy | Moreno Construction | rev pa201904157989 replace 5 linear feet of concrete crumble foundation.Details
rev pa201904157989 replace 5 linear feet of concrete crumble foundation. | $1,500 |
| Apr 15, 2019 | Completed final sign-off Nov 2019 | 2 Allston Wy | Moreno Construction | selected dry rot repair at front façade stucco. replace brink in-kind to match original at front stairs. no other work.Details
selected dry rot repair at front façade stucco. replace brink in-kind to match original at front stairs. no other work. | $20,500 |
| Jul 28, 2016 | Completed final sign-off Sep 2016 | 2 Allston Wy | Westech Roofing Co | reroofingDetails
reroofing | $11,000 |
| Sep 4, 2015 | Completed final sign-off Jan 2016 | 2 Allston Wy | Grand Finishes | all work in basement - reframe to increase headroom by stairs. add 1/2 bath. replace 2 windows in kind, replace back door with dog door & window. replace stairwell window with larger. add partition walls for new storage areaDetails
all work in basement - reframe to increase headroom by stairs. add 1/2 bath. replace 2 windows in kind, replace back door with dog door & window. replace stairwell window with larger. add partition walls for new storage area | $50,000 |
| Apr 5, 2011 | Completed final sign-off Jun 2011 | 2 Allston Wy | Grand Finishes | wall in closet modified to add a new bathroom, remodel (e) bathroom. modify bedroom closet to enlarge, install tile on walls, floors, new tub, sinks, shower fixtures, exhaust fan, 2 radiant heat pad in floor. replace bathroom window & interior doorDetails
wall in closet modified to add a new bathroom, remodel (e) bathroom. modify bedroom closet to enlarge, install tile on walls, floors, new tub, sinks, shower fixtures, exhaust fan, 2 radiant heat pad in floor. replace bathroom window & interior door | $43,000 |
| Dec 22, 2009 | Completed final sign-off Jan 2010 | 2 Allston Wy | comply with nov 200927216. close door from dining room to guestroom/office. add closet to guest bedroom/office. ref app 200912223639Details
comply with nov 200927216. close door from dining room to guestroom/office. add closet to guest bedroom/office. ref app 200912223639 | $1,000 | |
| Jan 8, 2008 | Completed final sign-off Jan 2009 | 2 Allston Wy | Beyer Shawn Dba: S B C | move existing kitchen to new location. install new windows. install french doors to exterior. install landing for french doors to back yard. remove 1 existing window. add new deck at rear.Details
move existing kitchen to new location. install new windows. install french doors to exterior. install landing for french doors to back yard. remove 1 existing window. add new deck at rear. | $30,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.