Back to kitchen remodel contractors
Golden West Builders
- Based in
- Pacifica
- On San Francisco permits
- Feb 2001 to Apr 2016
- Last 24 months
- 0 permits filed
16 permits since 2000: 12 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
6 kitchen remodel permits: 4 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 268 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 23, 2015 | Never finaled issued Nov 2015, no final | 141 Everglade Dr | revise permit 2015-1014-9655 remove partition and replace kitchen window not visible from street.Details
revise permit 2015-1014-9655 remove partition and replace kitchen window not visible from street. | $2,000 |
| Oct 14, 2015 | Completed final sign-off Jun 2016 | 141 Everglade Dr | remodel (e) kitchen. no structural work.Details
remodel (e) kitchen. no structural work. | $30,000 |
| Jul 5, 2013 | Completed final sign-off Aug 2014 | 600 21st Av | kitchen remodel, remodel 4 bathrooms and 1 powder rm, remove interior walls at 1st flr & 2nd flr, relocate washer/dryer, voluntary plywood stiffening of new wallDetails
kitchen remodel, remodel 4 bathrooms and 1 powder rm, remove interior walls at 1st flr & 2nd flr, relocate washer/dryer, voluntary plywood stiffening of new wall | $85,000 |
| Jun 17, 2010 | Completed final sign-off Mar 2011 | 401 Lisbon St | remodel of fire damaged bldg. remodel & repair (e) kitchen & bathrooms. replace all windows similar in-kind (wd. clad alum.) (n) partition wall framing & infill (n) roof monitor & require structural framing. replace cement tile to siding at (east) facade.Details
remodel of fire damaged bldg. remodel & repair (e) kitchen & bathrooms. replace all windows similar in-kind (wd. clad alum.) (n) partition wall framing & infill (n) roof monitor & require structural framing. replace cement tile to siding at (east) facade. | $40,000 |
| Jun 26, 2001 | Expired or cancelled expired Mar 2002 | 286 Hamilton St | change kitchen cabinets & counter tops, upgrade electrical, insulate & sheetrockDetails
change kitchen cabinets & counter tops, upgrade electrical, insulate & sheetrock | $16,500 |
| Mar 5, 2001 | Completed final sign-off Jun 2001 | 211 Cole St | remodel kitchen new cabinets, change skylight install hood upgrade electrical in kitchen insulate waDetails
remodel kitchen new cabinets, change skylight install hood upgrade electrical in kitchen insulate wa | $10,500 |