Back to bathroom remodel contractors
Golden West Builders
- Based in
- Pacifica
- On San Francisco permits
- Feb 2001 to Apr 2016
- Last 24 months
- 0 permits filed
16 permits since 2000: 12 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 7 completed, 1 never finaled. Typically 0 days from filing to permit and 284 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 21, 2016 | Never finaled issued Apr 2016, no final | 134 Middlefield Dr | remodel existing bathroom (main) in kind. replace all bathroom fixtures.Details
remodel existing bathroom (main) in kind. replace all bathroom fixtures. | $20,000 |
| Jun 11, 2014 | Completed final sign-off Sep 2014 | 419 Frederick St | remodel 2nd floor hall bathroom.Details
remodel 2nd floor hall bathroom. | $9,000 |
| Jul 5, 2013 | Completed final sign-off Aug 2014 | 600 21st Av | kitchen remodel, remodel 4 bathrooms and 1 powder rm, remove interior walls at 1st flr & 2nd flr, relocate washer/dryer, voluntary plywood stiffening of new wallDetails
kitchen remodel, remodel 4 bathrooms and 1 powder rm, remove interior walls at 1st flr & 2nd flr, relocate washer/dryer, voluntary plywood stiffening of new wall | $85,000 |
| Nov 26, 2012 | Completed final sign-off Oct 2014 | 1859 38th Av | replace existing 1 bath tub with walk in tub; replace vanity and tile floor, lighting to comply with cec 150kDetails
replace existing 1 bath tub with walk in tub; replace vanity and tile floor, lighting to comply with cec 150k | $8,500 |
| Nov 8, 2011 | Completed final sign-off Jan 2012 | 396 Lombard St | remodel 2 bathrooms in unit #1 &3 @2nd flr and 3rd flr, repair dry rot and water damage, replace fixtures & tile, dry rot intonorth and west wall, high efficacy lighting or occupancy sensor, no change to exhaust systemDetails
remodel 2 bathrooms in unit #1 &3 @2nd flr and 3rd flr, repair dry rot and water damage, replace fixtures & tile, dry rot intonorth and west wall, high efficacy lighting or occupancy sensor, no change to exhaust system | $15,000 |
| Jun 17, 2010 | Completed final sign-off Mar 2011 | 401 Lisbon St | remodel of fire damaged bldg. remodel & repair (e) kitchen & bathrooms. replace all windows similar in-kind (wd. clad alum.) (n) partition wall framing & infill (n) roof monitor & require structural framing. replace cement tile to siding at (east) facade.Details
remodel of fire damaged bldg. remodel & repair (e) kitchen & bathrooms. replace all windows similar in-kind (wd. clad alum.) (n) partition wall framing & infill (n) roof monitor & require structural framing. replace cement tile to siding at (east) facade. | $40,000 |
| Apr 8, 2010 | Completed final sign-off Apr 2011 | 1 Starview Wy | to comply with complaint # 201039726: remodel of (e) bathroom; no structuralDetails
to comply with complaint # 201039726: remodel of (e) bathroom; no structural | $6,000 |
| May 9, 2008 | Completed final sign-off Dec 2008 | 286 Hamilton St | remodel existing bathroom and replace existing skylight in kind. no struactural lighting to be fluorescent or on occupant sensor.Details
remodel existing bathroom and replace existing skylight in kind. no struactural lighting to be fluorescent or on occupant sensor. | $20,000 |