Back to bathroom remodel contractors
Golden State Marble & Granite Inc.
- Based in
- San Mateo
- On San Francisco permits
- Nov 2012 to Jan 2025
- Last 24 months
- 1 permit filed
150 permits since 2000: 129 completed, 4 in progress, 15 never finaled, 2 expired or cancelled.
Of the 15 never-finaled permits, 6 are 3 to 5 years old, 6 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
85 bathroom remodel permits: 74 completed, 1 in progress, 9 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 168 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 17, 2024 | In progress issued Sep 2024 | 3015 Octavia St | master bathroom remodel, like for like, no wall demolition or construction, no change in plumbing fixture count.Details
master bathroom remodel, like for like, no wall demolition or construction, no change in plumbing fixture count. | $15,000 |
| Jul 30, 2024 | Completed final sign-off Oct 2024 | 915 Garfield St | revision to pa 202407015605 to obtain plans for adding non-structural wall in 2 bathrooms per building inspectorDetails
revision to pa 202407015605 to obtain plans for adding non-structural wall in 2 bathrooms per building inspector | |
| Jul 1, 2024 | Completed final sign-off Nov 2024 | 200 Carl St | unit 102: hall bathroom remodel (no structural change)Details
unit 102: hall bathroom remodel (no structural change) | $15,000 |
| Jul 1, 2024 | Completed final sign-off Oct 2024 | 915 Garfield St | remodeling kitchen, 2 bathrooms, no structural change on upstair. comply with nov#202287441 (#1, #2), nov#202177152 (#1 to #13), nov#202179521 (#1 to #4), nov#202181902 (#1 to #4)Details
remodeling kitchen, 2 bathrooms, no structural change on upstair. comply with nov#202287441 (#1, #2), nov#202177152 (#1 to #13), nov#202179521 (#1 to #4), nov#202181902 (#1 to #4) | $45,000 |
| May 15, 2024 | Completed final sign-off Sep 2024 | 138 Grand View Av | upstairs kitchen and bathroom remodel. no structural change. no moving walls.Details
upstairs kitchen and bathroom remodel. no structural change. no moving walls. | $40,000 |
| Apr 5, 2024 | Completed final sign-off Sep 2024 | 136 Grand View Av | interior remodel 2nd fl: relocate (e) kitchen add (n) bath & (n) bedroom and remodel (e) bath 1st fl: relocate (e) kitchen and (e) bedroom and remodel (e) bathDetails
interior remodel 2nd fl: relocate (e) kitchen add (n) bath & (n) bedroom and remodel (e) bath 1st fl: relocate (e) kitchen and (e) bedroom and remodel (e) bath | $80,000 |
| Mar 12, 2024 | Completed final sign-off Nov 2024 | 76 Getz St | remove stone fire place at 1st floor. replace 1st floor rear facade window and door, remodel 1st floor bath, expand into garage, convert closet to coffee bar. install 1 new side window not visable from street. install skylight at 2nd floor roof over stairs.Details
remove stone fire place at 1st floor. replace 1st floor rear facade window and door, remodel 1st floor bath, expand into garage, convert closet to coffee bar. install 1 new side window not visable from street. install skylight at 2nd floor roof over stairs. | $120,000 |
| Sep 11, 2023 | Completed final sign-off Jan 2026 | 4156 20th St | unit 1: convert storage to office space at basement. 4158b: new interior stair from first floor to basement. remove chimney. remodel downstair bath. unit 2: remove chimney and provide electric fire place.Details
unit 1: convert storage to office space at basement. 4158b: new interior stair from first floor to basement. remove chimney. remodel downstair bath. unit 2: remove chimney and provide electric fire place. | $40,000 |
| Jul 25, 2023 | Completed final sign-off Apr 2024 | 1206 33rd Av | remodeling 2 bathrooms and 1 kitchen. updated electric to 200amp. sam size and same location.Details
remodeling 2 bathrooms and 1 kitchen. updated electric to 200amp. sam size and same location. | $40,000 |
| Jun 23, 2023 | Never finaled issued Jun 2023, no final | 4156 20th St | (1) kitchen and (1) bathroom remodeling in kind. no structural work. no floor layout changes. no wall layout changes.Details
(1) kitchen and (1) bathroom remodeling in kind. no structural work. no floor layout changes. no wall layout changes. | $35,000 |
| May 31, 2023 | Completed final sign-off Jan 2024 | 19 Prosper St | kitchen and bathroom remodeling @ same locationDetails
kitchen and bathroom remodeling @ same location | $35,000 |
| May 2, 2023 | Never finaled issued May 2023, no final | 4160 25th St | remodel bathroom and kitchen on 2nd fl; structural strengthening with plywood sheathing, floor strengthening where needed; remove two windows and relocate door on 1st fl; window replacement; no increase in square footage of existing space. amend to pa202302031394 for additional work.Details
remodel bathroom and kitchen on 2nd fl; structural strengthening with plywood sheathing, floor strengthening where needed; remove two windows and relocate door on 1st fl; window replacement; no increase in square footage of existing space. amend to pa202302031394 for additional work. | $85,000 |
| Feb 2, 2023 | Completed final sign-off Oct 2023 | 1220 Pine St | (1) kitchen (1) bathroom remodel, no structural workDetails
(1) kitchen (1) bathroom remodel, no structural work | $35,000 |
| Feb 2, 2023 | Never finaled issued Feb 2023, no final | 4162 25th St | (1) kitchen (1) bathroom remodel, no structural change replace side & back windows at same locationDetails
(1) kitchen (1) bathroom remodel, no structural change replace side & back windows at same location | $35,000 |
| Oct 14, 2022 | Never finaled issued Oct 2022, no final | 706 25th Av | remodel upstairs hallway master bath. kitchen remodel.- in kind no structural change. replace (14) retrofit windows (front, back, and lightwell)- in kindDetails
remodel upstairs hallway master bath. kitchen remodel.- in kind no structural change. replace (14) retrofit windows (front, back, and lightwell)- in kind | $45,000 |
| Jun 6, 2022 | Completed final sign-off Nov 2022 | 2847 Turk St | hall bath room 1.5 bathroom. remodeling no structural change.Details
hall bath room 1.5 bathroom. remodeling no structural change. | $15,000 |
| May 19, 2022 | Completed final sign-off Jan 2024 | 325 Harvard St | add bathroom on 1st fl. add sink and electric top & refrigerator and family room @ 1st fl. remove stairs on 2nd fl, and reconfigure room & add one 20Details
add bathroom on 1st fl. add sink and electric top & refrigerator and family room @ 1st fl. remove stairs on 2nd fl, and reconfigure room & add one 20 | $80,000 |
| Mar 22, 2022 | Completed final sign-off Aug 2024 | 1591 43rd Av | repair front stair, repair back deck. less than 50% remodel hall bathroom, no structural changes. & no wall movedDetails
repair front stair, repair back deck. less than 50% remodel hall bathroom, no structural changes. & no wall moved | $25,000 |
| Mar 16, 2022 | Completed final sign-off Aug 2022 | 2750 Market St | replace master and hall bathroom shower only, tile, and fixtures.Details
replace master and hall bathroom shower only, tile, and fixtures. | $15,000 |
| Feb 28, 2022 | Completed final sign-off Mar 2023 | 117 Hartford St | unit 3: demolition of interior finish materials, structural. interior alterations of bathrooms & kitchen, add (2) new skylights.Details
unit 3: demolition of interior finish materials, structural. interior alterations of bathrooms & kitchen, add (2) new skylights. | $23,000 |
| Dec 3, 2021 | Completed final sign-off Sep 2022 | 1631 35th Av | upstairs: hall one bathroom full remodel. no structural change. same layout no wall removal. replace existing retrofit bathroom window.Details
upstairs: hall one bathroom full remodel. no structural change. same layout no wall removal. replace existing retrofit bathroom window. | $10,000 |
| Nov 10, 2021 | Completed final sign-off Feb 2022 | 235 Lowell St | downstair hall bathroom remodel. no structural change.Details
downstair hall bathroom remodel. no structural change. | $10,000 |
| Jul 15, 2021 | Completed final sign-off Feb 2022 | 625 Campbell Av | one hall bath and one master bath remodeling. no structural cahnge. six front window replace same as existig windows replace new roofing.Details
one hall bath and one master bath remodeling. no structural cahnge. six front window replace same as existig windows replace new roofing. | $38,000 |
| Jul 2, 2021 | Completed final sign-off May 2022 | 1135 Monterey Bl | downstair master bathroom remodeling. no sturctual change, no layout change. replace back retrofit windows, not visible from street.Details
downstair master bathroom remodeling. no sturctual change, no layout change. replace back retrofit windows, not visible from street. | $10,000 |
| Jul 2, 2021 | Completed final sign-off Nov 2022 | 2 Fallon Pl | remodel two bath(hall and master) no structural change. & 1 laundry, no layout change.Details
remodel two bath(hall and master) no structural change. & 1 laundry, no layout change. | $30,000 |
| Jun 7, 2021 | Completed final sign-off Aug 2024 | 1564 Green St | interior alterations of 2 dwellings. remodel of kitchens & bathrooms. voluntary structural improvements. installation of sprinklers.Details
interior alterations of 2 dwellings. remodel of kitchens & bathrooms. voluntary structural improvements. installation of sprinklers. | $150,000 |
| Mar 17, 2021 | Completed final sign-off Oct 2022 | 59 Douglass St | remodel 2nd floor unit #59 to include a new washer and dryer closet, convert storage area to a new 1/2 bath, create a small office.Details
remodel 2nd floor unit #59 to include a new washer and dryer closet, convert storage area to a new 1/2 bath, create a small office. | $20,000 |
| Feb 1, 2021 | Completed final sign-off May 2021 | 1537 Lake St | remodel hall bath room (no structural work)Details
remodel hall bath room (no structural work) | $5,000 |
| Jan 26, 2021 | Completed final sign-off May 2021 | 210 29th St | one kitchen, one bathroom remodeling (no wall or structural change). only replacement of tiles, cabinet countertop & fixtures only.Details
one kitchen, one bathroom remodeling (no wall or structural change). only replacement of tiles, cabinet countertop & fixtures only. | $30,000 |
| Jan 7, 2021 | Completed final sign-off Jul 2021 | 29 Lupine Av | unit a - kitchen and bathroom remodeling. no wall changeDetails
unit a - kitchen and bathroom remodeling. no wall change | $30,000 |
| Dec 11, 2020 | Completed final sign-off Mar 2021 | 3738 Scott St | master bath room remodel on top floor. no structural change. no window change. no wall removal.Details
master bath room remodel on top floor. no structural change. no window change. no wall removal. | $14,000 |
| Sep 24, 2020 | Completed final sign-off Mar 2022 | 1040 De Haro St | remodel 1 kitchen, hall bath and master bath, in-kind. no walls moved or relocated. repair 400 sq ft siding at rear.Details
remodel 1 kitchen, hall bath and master bath, in-kind. no walls moved or relocated. repair 400 sq ft siding at rear. | $45,000 |
| Sep 11, 2020 | Completed final sign-off Dec 2021 | 2235 Sutter St | comply with nov202044841. add (n) washer & dryer (laundry area). replace (bn) counter cabinet top & bottom. remodel bathroom #2. replace sheetrock in walls and ceilingDetails
comply with nov202044841. add (n) washer & dryer (laundry area). replace (bn) counter cabinet top & bottom. remodel bathroom #2. replace sheetrock in walls and ceiling | $15,000 |
| Jul 29, 2020 | Completed final sign-off Feb 2021 | 1438 Green St | remodel of kitchen (90 sq ft) and 2 bathrooms (50 sq ft each). no structural change. replace new cabinets, new counters, new flooring, new tiles, new appliances for kitchen, new fixtures and new lights.Details
remodel of kitchen (90 sq ft) and 2 bathrooms (50 sq ft each). no structural change. replace new cabinets, new counters, new flooring, new tiles, new appliances for kitchen, new fixtures and new lights. | $35,000 |
| Sep 6, 2019 | Completed final sign-off Jun 2020 | 744 18th Av | hallway bathroom remodel (no structural change). front 4 windows replace at same location. wood windows; original pattern, true divided light with integrated ogee lugs.Details
hallway bathroom remodel (no structural change). front 4 windows replace at same location. wood windows; original pattern, true divided light with integrated ogee lugs. | $10,000 |
| Jul 30, 2019 | Expired or cancelled cancelled Jun 2023 | 1454 17th Av | (unit#1456) hallway bathroom & kitchen remodel. no wall changes.Details
(unit#1456) hallway bathroom & kitchen remodel. no wall changes. | $25,000 |
| Jul 30, 2019 | Never finaled issued Jul 2019, no final | 1483 37th Av | remodel 1 1/2 bathroom hallway in kind. no change to walls.Details
remodel 1 1/2 bathroom hallway in kind. no change to walls. | $8,000 |
| Jul 30, 2019 | Completed final sign-off Feb 2020 | 1980 Vallejo St | unit 3 - remodel 3 bathrooms, 1 kitchen. no wall change.Details
unit 3 - remodel 3 bathrooms, 1 kitchen. no wall change. | $45,000 |
| Jul 5, 2019 | Completed final sign-off Jun 2020 | 3017 Octavia St | remodel two bathrooms and one kitchen,\. no change of wallsDetails
remodel two bathrooms and one kitchen,\. no change of walls | $35,000 |
| Feb 8, 2019 | Completed final sign-off Jun 2020 | 482 Douglass St | revision to pa 201810264282. add 110 sq ft to proposed bathroom under (e) overhang. revise bath # 2 layout, extend retaining wall to create patio, relocate at 1st flr.Details
revision to pa 201810264282. add 110 sq ft to proposed bathroom under (e) overhang. revise bath # 2 layout, extend retaining wall to create patio, relocate at 1st flr. | $45,000 |
| Nov 27, 2018 | Completed final sign-off Jun 2019 | 1378 Mcallister St | full remodeling two bathrooms and one kitchen. (no structural change)Details
full remodeling two bathrooms and one kitchen. (no structural change) | $45,000 |
| Oct 16, 2018 | Never finaled issued Oct 2018, no final | 3015 Octavia St | remodel bathroom in kind. no structural work.Details
remodel bathroom in kind. no structural work. | $10,000 |
| Aug 2, 2018 | Completed final sign-off Oct 2018 | 1025 Geneva Av | apt 6: bathroom remodeling. replace new fixtures, tiles,vanity, electrical light & fan. no structural changes. replace in same location/layout.Details
apt 6: bathroom remodeling. replace new fixtures, tiles,vanity, electrical light & fan. no structural changes. replace in same location/layout. | $9,000 |
| Jul 18, 2018 | Completed final sign-off Dec 2018 | 2733 Golden Gate Av | kitchen & half-bathroom - full remodeling. in-kind, no structurual work..Details
kitchen & half-bathroom - full remodeling. in-kind, no structurual work.. | $15,000 |
| Jun 14, 2018 | Completed final sign-off Nov 2018 | 793 14th Av | bathroom full remodeling & laundry room at same location.Details
bathroom full remodeling & laundry room at same location. | $10,000 |
| May 29, 2018 | Completed final sign-off Feb 2019 | 2267 32nd Av | remodel the kitchen and bathroom at same location. no change to wall locations or new walls.Details
remodel the kitchen and bathroom at same location. no change to wall locations or new walls. | $20,000 |
| Feb 5, 2018 | Completed final sign-off Aug 2018 | 475 10th Av | remodeling hallway bathroom @ same location. new plumbing fixtures, tiles, electric outlets, light and paintingDetails
remodeling hallway bathroom @ same location. new plumbing fixtures, tiles, electric outlets, light and painting | $8,000 |
| Dec 7, 2017 | Completed final sign-off Apr 2019 | 131 Harold Av | infill existing lightwell at 1st/2nd fl north side of building. remodel 1st fl to include family rm,powder rm, bedroom, closet, laundry rm. new interior stair connectiong 1st and 2nd fl. removel 2nd fl to include kitchen, dining room, hall bath. new stairs at rear from 1st fl toDetails
infill existing lightwell at 1st/2nd fl north side of building. remodel 1st fl to include family rm,powder rm, bedroom, closet, laundry rm. new interior stair connectiong 1st and 2nd fl. removel 2nd fl to include kitchen, dining room, hall bath. new stairs at rear from 1st fl to | $160,000 |
| Sep 19, 2017 | Completed final sign-off Oct 2017 | 2665 Sacramento St | bathroom remodeling: replace new tub, new cabinet, new window, new tiles, new ligts, outlets. all at the same location. no change on walls. n/a maherDetails
bathroom remodeling: replace new tub, new cabinet, new window, new tiles, new ligts, outlets. all at the same location. no change on walls. n/a maher | $8,000 |
| Jun 30, 2017 | Completed final sign-off May 2018 | 439 03rd Av | remodel at lower & main level. replace (e) interior bearing wall at main level with new existing steel beam. legalize 2 bathrooms including 1 on ground floor. new washer and dryer. replace (e) tile flooring at deck. new grill at rear yardDetails
remodel at lower & main level. replace (e) interior bearing wall at main level with new existing steel beam. legalize 2 bathrooms including 1 on ground floor. new washer and dryer. replace (e) tile flooring at deck. new grill at rear yard | $50,000 |
| Mar 29, 2017 | Completed final sign-off Jun 2017 | 1867 Page St | 1 kitchen & 1 bathroom remodel. same location.Details
1 kitchen & 1 bathroom remodel. same location. | $25,000 |
| Dec 21, 2016 | Completed final sign-off Apr 2019 | 240 Andover St | convert 1015 sq ft of (e) ground floor utility space into habitable space including remove the (e) rear exterior stair; construct a new interior stair to the ground floor; add a new bathroom & a bar; new windows & doors to the rear yard; install a new rear yard patioDetails
convert 1015 sq ft of (e) ground floor utility space into habitable space including remove the (e) rear exterior stair; construct a new interior stair to the ground floor; add a new bathroom & a bar; new windows & doors to the rear yard; install a new rear yard patio | $101,402 |
| Dec 12, 2016 | Completed final sign-off May 2017 | 550 Davis St | unit 8, kitchen remodel - remove partial interior partition wall. upgrading kitchen finishes. cabinetry. appliances and fixtures & upgrading master bath room. finishes. no work in common area. upgrade electrical service panel to 200amp.Details
unit 8, kitchen remodel - remove partial interior partition wall. upgrading kitchen finishes. cabinetry. appliances and fixtures & upgrading master bath room. finishes. no work in common area. upgrade electrical service panel to 200amp. | $30,000 |
| Nov 18, 2016 | Completed final sign-off Oct 2018 | 419 20th Av | new unit on 1/f, 2 bedrooms & 2 bathrooms, 1 kitchen, 1 living room. nfpa 13-r sprinkler under deferred submittal.Details
new unit on 1/f, 2 bedrooms & 2 bathrooms, 1 kitchen, 1 living room. nfpa 13-r sprinkler under deferred submittal. | $80,000 |
| Oct 11, 2016 | Completed final sign-off Mar 2017 | 1382 Mcallister St | apt 2: remodling kitchen & 2 bathroom bathrooms. no structural change.Details
apt 2: remodling kitchen & 2 bathroom bathrooms. no structural change. | $25,000 |
| Sep 29, 2016 | Completed final sign-off Aug 2017 | 1535 Lake St | kitchen remodel, keep same layout, new cabinets, tile, new lights, new appliances; bathroom remodel, keep same layout, new tub, fixtures, new tiles, new lights.Details
kitchen remodel, keep same layout, new cabinets, tile, new lights, new appliances; bathroom remodel, keep same layout, new tub, fixtures, new tiles, new lights. | $25,000 |
| Sep 28, 2016 | Never finaled issued Sep 2016, no final | 419 20th Av | convert study to bathroom, remove wall in living room and dining room. convert closet to laundry on 2nd and 3rd floorDetails
convert study to bathroom, remove wall in living room and dining room. convert closet to laundry on 2nd and 3rd floor | $25,000 |
| Aug 17, 2016 | Completed final sign-off Jan 2017 | 540 Wisconsin St | bathrooms: remodel (2) bathrooms - replace new tile, new fixtures,. kitchen: remodel kitchen - same location, new cabinets, new lights, new appliances, new fixtures. all new lightings are led'sDetails
bathrooms: remodel (2) bathrooms - replace new tile, new fixtures,. kitchen: remodel kitchen - same location, new cabinets, new lights, new appliances, new fixtures. all new lightings are led's | $20,000 |
| Jul 26, 2016 | Never finaled issued Jul 2016, no final | 419 20th Av | two kitchens remodel(#419 & #421). bathroom remodel in #421. remodel at same area. kitchen to comply with cec 150k.Details
two kitchens remodel(#419 & #421). bathroom remodel in #421. remodel at same area. kitchen to comply with cec 150k. | $20,000 |
| Apr 4, 2016 | Completed final sign-off May 2016 | 29 Lupine Av | unit c: remodel one kitchen and one bathroom. same location. no wall moved.Details
unit c: remodel one kitchen and one bathroom. same location. no wall moved. | $16,000 |
| Dec 8, 2015 | Completed final sign-off Mar 2016 | 2618 Greenwich St | unit #1: kitchen:replace nw cabinet,new counter top,new floor,upgrade new elec lights,new outlets,new plumbing sinks,new appliances. bathroom: replace tub,tile,plmbg fixtures,fan,lights & outlets.Details
unit #1: kitchen:replace nw cabinet,new counter top,new floor,upgrade new elec lights,new outlets,new plumbing sinks,new appliances. bathroom: replace tub,tile,plmbg fixtures,fan,lights & outlets. | $25,000 |
| Oct 6, 2015 | Never finaled issued Oct 2015, no final | 1378 Mcallister St | unit #3: remodel existing kitchen and bathroom. no structural work.Details
unit #3: remodel existing kitchen and bathroom. no structural work. | $20,000 |
| Sep 30, 2015 | Completed final sign-off May 2016 | 1378 Mcallister St | #3- relocate & remodel kitchen, remodel bathroom, move bedroom, new floor, new electrical and plumbing for kitchen and bathroom. new tile, new kitchen cabinets and counter, install new water heater, install fan in bathroom, framing for closet space.Details
#3- relocate & remodel kitchen, remodel bathroom, move bedroom, new floor, new electrical and plumbing for kitchen and bathroom. new tile, new kitchen cabinets and counter, install new water heater, install fan in bathroom, framing for closet space. | $18,000 |
| Aug 5, 2015 | Completed final sign-off Nov 2015 | 421 20th Av | remodel hall bath: replace shower, fixtures, tiles, lights, outlets, cabinet and counter top.Details
remodel hall bath: replace shower, fixtures, tiles, lights, outlets, cabinet and counter top. | $6,000 |
| May 8, 2015 | Completed final sign-off Mar 2016 | 235 Madrid St | legalize unit per ordinance no# 43-14. 2 bedrooms, 2 baths, 1 kitchen & 1 living room.Details
legalize unit per ordinance no# 43-14. 2 bedrooms, 2 baths, 1 kitchen & 1 living room. | $5,000 |
| Apr 28, 2015 | Completed final sign-off Aug 2016 | 161 Santa Rosa Av | convert storage at 1st fl into 1 bedroom , bath, and closet. reduce length of 2nd fl deck by appoximately 6'6Details
convert storage at 1st fl into 1 bedroom , bath, and closet. reduce length of 2nd fl deck by appoximately 6'6 | $40,000 |
| Mar 13, 2015 | Completed final sign-off Jul 2015 | 170 22nd Av | convert portion of master bedroom and closets into walk-in close t & master bathroom: add new master bathroom new plumbing fixtures, vanity, tile and electrical - 3rd floorDetails
convert portion of master bedroom and closets into walk-in close t & master bathroom: add new master bathroom new plumbing fixtures, vanity, tile and electrical - 3rd floor | $10,000 |
| Jan 12, 2015 | Completed final sign-off May 2015 | 1408 Noe St | reference to pa#201411242338, relocate shearwall at back of bathroom wall at 1/fDetails
reference to pa#201411242338, relocate shearwall at back of bathroom wall at 1/f | $5,000 |
| Jan 8, 2015 | Completed final sign-off Mar 2015 | 1867 Page St | kitchen: replace new cabinet, new counter top, upgrade new outlets and plumbing, new sink, new appliances. no walls moved, removed or added. layout unchanged. bathroom; replace new shower pan, tile, new fixtures, new tile. upgrade new outlets and fan. no walls moved removed or added. layout unchanDetails
kitchen: replace new cabinet, new counter top, upgrade new outlets and plumbing, new sink, new appliances. no walls moved, removed or added. layout unchanged. bathroom; replace new shower pan, tile, new fixtures, new tile. upgrade new outlets and fan. no walls moved removed or added. layout unchan | $13,000 |
| Nov 24, 2014 | Completed final sign-off May 2015 | 1408 Noe St | interior alterations to (2) existing bathrooms, (1) kitchen and reconfiguring closets at three bedrooms, replace (e) sliding glass doors.Details
interior alterations to (2) existing bathrooms, (1) kitchen and reconfiguring closets at three bedrooms, replace (e) sliding glass doors. | $68,000 |
| Sep 4, 2014 | Completed final sign-off Sep 2015 | 33 Clearfield Dr | add master bedroom & bath at first floor. add new bathroom on second floor. remodel existing kitchen and bathroom on second floor. add a rear deck on second floor per plan.appox 11'-6"x13'-0"Details
add master bedroom & bath at first floor. add new bathroom on second floor. remodel existing kitchen and bathroom on second floor. add a rear deck on second floor per plan.appox 11'-6"x13'-0" | $20,000 |
| Jun 24, 2014 | Completed final sign-off Oct 2014 | 2730 39th Av | remodel one bathroom on upper level: plumbing two new sinks & shower drain, head, toilet, replace new tile on the floor & wall, new vanity, new glass door, electric outlets, lights & fan. bathroom lighting shall be high efficacy or controlled by manual-on sensor.Details
remodel one bathroom on upper level: plumbing two new sinks & shower drain, head, toilet, replace new tile on the floor & wall, new vanity, new glass door, electric outlets, lights & fan. bathroom lighting shall be high efficacy or controlled by manual-on sensor. | $8,000 |
| Apr 18, 2014 | Completed final sign-off Oct 2014 | 167 Mangels Av | convert den and game room at 1/f into bedrooms, relocate bathroom at 1/f, install new half bath at 1/f, remodel bathroom at 2/f.Details
convert den and game room at 1/f into bedrooms, relocate bathroom at 1/f, install new half bath at 1/f, remodel bathroom at 2/f. | $25,000 |
| Apr 3, 2014 | Completed final sign-off Jun 2014 | 258 04th Av | master bathroom & hall bathroom: replace new tub, new fixtures, new sink, new tile surrounds the wall & floor. replace new outlets and fan. replace new vanity cabinet and counter top.Details
master bathroom & hall bathroom: replace new tub, new fixtures, new sink, new tile surrounds the wall & floor. replace new outlets and fan. replace new vanity cabinet and counter top. | $10,000 |
| Dec 12, 2013 | Completed final sign-off Jun 2014 | 274 Ulloa St | kitchen: replace new cabinets, new counter top, tile floor, electric new lights & outlets. plumbing new sink, new refrig, new appliances. bathroom: master bath, two hall & master bath on 2/f. replace new tile, new fixtures, new lights, new outlets, new toilet, new tubs.Details
kitchen: replace new cabinets, new counter top, tile floor, electric new lights & outlets. plumbing new sink, new refrig, new appliances. bathroom: master bath, two hall & master bath on 2/f. replace new tile, new fixtures, new lights, new outlets, new toilet, new tubs. | $25,000 |
| Oct 18, 2013 | Completed final sign-off Dec 2013 | 29 Lupine Av | work in unit e: kitchen: replace old cabinets with new cabinet, floor, upgrade new outlet, plumbing new sink, refrigerator, replace old appliances with new. bathroom: replace shower pan, new tile, new cabinets, new fixtures, new lights and new fan, painting the room.Details
work in unit e: kitchen: replace old cabinets with new cabinet, floor, upgrade new outlet, plumbing new sink, refrigerator, replace old appliances with new. bathroom: replace shower pan, new tile, new cabinets, new fixtures, new lights and new fan, painting the room. | $10,000 |
| Aug 20, 2013 | Completed final sign-off Apr 2014 | 1331 25th Av | 1)new bathroom at 1st and 3rd floor. 2)remodel bathroom at 3rd floor. 3)new spiral stair from 2nd to 1st floor. 4)remodel kitchen at 2nd floor.Details
1)new bathroom at 1st and 3rd floor. 2)remodel bathroom at 3rd floor. 3)new spiral stair from 2nd to 1st floor. 4)remodel kitchen at 2nd floor. | $40,000 |
| Jul 24, 2013 | Completed final sign-off Aug 2013 | 1901 California St | replace new window on the bathroom (same size, same location)Details
replace new window on the bathroom (same size, same location) | $250 |
| Jul 24, 2013 | Completed final sign-off Oct 2013 | 1380 Mcallister St | replace new window in the kitchen and bathroom (same location, same size)Details
replace new window in the kitchen and bathroom (same location, same size) | $500 |
| Jun 12, 2013 | Completed final sign-off Oct 2013 | 1380 Mcallister St | unit #1 - relocate kitchen, bedroom, remodel bathroom, electric new outlet, plug new sink, install wall heaters (2). new tile, new counter top, new cabinet.Details
unit #1 - relocate kitchen, bedroom, remodel bathroom, electric new outlet, plug new sink, install wall heaters (2). new tile, new counter top, new cabinet. | $18,000 |
| Jun 12, 2013 | Completed final sign-off Nov 2013 | 1867 Page St | #2- remodel kitchen and bathroom. add one bathroom. move kitchen to create a second bedroom. electric new outlets, new lights upto code, install new plumbing fixtures.Details
#2- remodel kitchen and bathroom. add one bathroom. move kitchen to create a second bedroom. electric new outlets, new lights upto code, install new plumbing fixtures. | $18,000 |
| Jun 3, 2013 | Completed final sign-off Sep 2013 | 1111 Bay St | master bath and hall bath: replace new tile, new cabinet, replumbing new plumbing fixtures, new painting, new couner topDetails
master bath and hall bath: replace new tile, new cabinet, replumbing new plumbing fixtures, new painting, new couner top | $10,000 |
| Apr 4, 2013 | Completed final sign-off Sep 2013 | 1901 California St | kitchen: replace new cabinet, countertop, rewire some recess lights & update new electric outlets, new appliances. master bath: replace new tub, shower, new plumbing fixtures. half bath: new tile, cabinet, counter top, electric couple outlets & fan.Details
kitchen: replace new cabinet, countertop, rewire some recess lights & update new electric outlets, new appliances. master bath: replace new tub, shower, new plumbing fixtures. half bath: new tile, cabinet, counter top, electric couple outlets & fan. | $25,000 |
| Jan 28, 2013 | Completed final sign-off May 2013 | 1818 Broadway | replace new tub new tile on the wall & floor, in bathroom, plumbing two new sinks ,new fixtures for shower & tub, install new cabinet & counter top, install new 6 led lgihts in the bedroom.Details
replace new tub new tile on the wall & floor, in bathroom, plumbing two new sinks ,new fixtures for shower & tub, install new cabinet & counter top, install new 6 led lgihts in the bedroom. | $6,000 |
| Nov 30, 2012 | Completed final sign-off Mar 2013 | 1376 Mcallister St | unit 5 - remodel kitchen and bathroom/laundry room. no structural workDetails
unit 5 - remodel kitchen and bathroom/laundry room. no structural work | $18,000 |