Go 2 Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2009 to Feb 2020
- Last 24 months
- 0 permits filed
25 permits since 2000: 23 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 14 days from filing to permit and 121 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 7, 2017 | Completed final sign-off Dec 2017 | 582 Roosevelt Wy | remodel (e) kitchen, to replace all cabinets, appliances, flooring and lighting. convert existing patio door in kitchen to window, convert existing window in adjacent dining room to patio door.Details
remodel (e) kitchen, to replace all cabinets, appliances, flooring and lighting. convert existing patio door in kitchen to window, convert existing window in adjacent dining room to patio door. | $40,000 |
| Apr 24, 2015 | Completed final sign-off Aug 2015 | 1141 Irving St | unit #1: remodel kitchen and bathroom, no exterior work, add (1) bathroom @ bedroom space.no bearing walls being altered. there is no exterior changes of current building. there is no structural changes of current buildingDetails
unit #1: remodel kitchen and bathroom, no exterior work, add (1) bathroom @ bedroom space.no bearing walls being altered. there is no exterior changes of current building. there is no structural changes of current building | $25,000 |
| Mar 13, 2014 | Completed final sign-off Sep 2014 | 534 11th Av | response to nov# 201321991. remove kitchen, all plumbing & electrical to source @ 1st floor.Details
response to nov# 201321991. remove kitchen, all plumbing & electrical to source @ 1st floor. | $1,000 |
| Jan 27, 2009 | Completed final sign-off Feb 2009 | 2090 32nd Av | revise cost from $6000.00 to $10000.00. replacement cabinet & counter in kitchen, update the electrical in the kitchen.Details
revise cost from $6000.00 to $10000.00. replacement cabinet & counter in kitchen, update the electrical in the kitchen. | $4,000 |