Back to bathroom remodel contractors
Go 2 Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2009 to Feb 2020
- Last 24 months
- 0 permits filed
25 permits since 2000: 23 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 9 completed, 1 never finaled. Typically 15 days from filing to permit and 108 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 24, 2018 | Completed final sign-off Jun 2018 | 48 Whittier St | revision to 201712015268. relocate bathroom and doors m,oved recessed garage door to line up with front wall. replace swing garage door with new roll up garage doorDetails
revision to 201712015268. relocate bathroom and doors m,oved recessed garage door to line up with front wall. replace swing garage door with new roll up garage door | $2,000 |
| Dec 1, 2017 | Completed final sign-off Jun 2018 | 48 Whittier St | enclose space under (e) bedroom, add a family room, a bedroom, an office and 2 full baths on 1/f, relocate furnace, water heater, washer and dryer.Details
enclose space under (e) bedroom, add a family room, a bedroom, an office and 2 full baths on 1/f, relocate furnace, water heater, washer and dryer. | $70,000 |
| Jul 8, 2016 | Completed final sign-off Nov 2016 | 130 Eastwood Dr | remodel bathroom and update with exhaust fan, gfci outlets on upper level. no change in wall and opening layout. high efficacy lighting or controlled by manual on sensor with high efficacy main light.Details
remodel bathroom and update with exhaust fan, gfci outlets on upper level. no change in wall and opening layout. high efficacy lighting or controlled by manual on sensor with high efficacy main light. | $6,000 |
| May 28, 2015 | Never finaled issued Jan 2019, no final | 566 34th Av | vertical & horizontal extension to convert a single family home into 2 units residential building. (n) 1st units w/ 4 baths & 4 bedrooms. (n) 2nd unit w/ 7 baths & 6 bedrooms.Details
vertical & horizontal extension to convert a single family home into 2 units residential building. (n) 1st units w/ 4 baths & 4 bedrooms. (n) 2nd unit w/ 7 baths & 6 bedrooms. | $200,000 |
| Apr 24, 2015 | Completed final sign-off Aug 2015 | 1141 Irving St | unit #1: remodel kitchen and bathroom, no exterior work, add (1) bathroom @ bedroom space.no bearing walls being altered. there is no exterior changes of current building. there is no structural changes of current buildingDetails
unit #1: remodel kitchen and bathroom, no exterior work, add (1) bathroom @ bedroom space.no bearing walls being altered. there is no exterior changes of current building. there is no structural changes of current building | $25,000 |
| Aug 23, 2012 | Completed final sign-off Feb 2013 | 1655 23rd Av | rooms down remodel of garage level to include new bedroom, family room, full bath, 1/2 bath & laundry room. replace old furnace & (e) ductwork & (e) water heater w/new tankless water heater.Details
rooms down remodel of garage level to include new bedroom, family room, full bath, 1/2 bath & laundry room. replace old furnace & (e) ductwork & (e) water heater w/new tankless water heater. | $40,000 |
| Feb 16, 2010 | Completed final sign-off Apr 2010 | 466 Point Lobos Av | interior remodel of ground floor only: enlarge bathroom. replace rear door. ref. approved & completed pa# 9919335.Details
interior remodel of ground floor only: enlarge bathroom. replace rear door. ref. approved & completed pa# 9919335. | $10,000 |
| Sep 11, 2009 | Completed final sign-off Sep 2009 | 2501 Clement St | revision to pa# 2009.07.07.2118. modify configuration of interior wall. relocate opne bathroom door. revise wall details. work on 1st floor.Details
revision to pa# 2009.07.07.2118. modify configuration of interior wall. relocate opne bathroom door. revise wall details. work on 1st floor. | $500 |
| Jun 12, 2009 | Completed final sign-off Mar 2010 | 318 Hale St | remove (e) rear stairs, add new windows & walls at 1st fl. new bathroom at ground fl, new interior stairs, enclosed the area under the new sunroom, remodel (e) bathroom at 2nd fl. reroofing with new gutter & r30 insulation. relocate (e) water heater & furnace.Details
remove (e) rear stairs, add new windows & walls at 1st fl. new bathroom at ground fl, new interior stairs, enclosed the area under the new sunroom, remodel (e) bathroom at 2nd fl. reroofing with new gutter & r30 insulation. relocate (e) water heater & furnace. | $60,000 |
| Feb 23, 2009 | Completed final sign-off Apr 2009 | 570 Ofarrell St | remodel (e) bathroom, 2 shower & 1 sink, 2nd floor (replacement in king) no partition or structural changes. upgrade electrical fixtures.Details
remodel (e) bathroom, 2 shower & 1 sink, 2nd floor (replacement in king) no partition or structural changes. upgrade electrical fixtures. | $6,000 |