Gngc Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2014 to Apr 2026
- Last 24 months
- 7 permits filed
47 permits since 2000: 35 completed, 4 in progress, 4 never finaled, 4 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
6 stairs permits: 4 completed, 1 in progress, 1 never finaled. Typically 21 days from filing to permit and 350 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 26, 2025 | In progress issued Jul 2025 | 215 Missouri St | rear horizontal addtion @ the 1st & 2nd floors consisting of a new primary bedroom with bath; reconfiguring the (e) ensuite bedroom; 2nd fl expansion with a new family room & new roof deck with spiral stair to rear yard and widening of (e) garage doorDetails
rear horizontal addtion @ the 1st & 2nd floors consisting of a new primary bedroom with bath; reconfiguring the (e) ensuite bedroom; 2nd fl expansion with a new family room & new roof deck with spiral stair to rear yard and widening of (e) garage door | $275,000 |
| Apr 21, 2021 | Completed final sign-off Jun 2021 | 478 37th Av | repair dry rot at (e) deck and rear stairs less than 50%Details
repair dry rot at (e) deck and rear stairs less than 50% | $5,000 |
| Jun 14, 2019 | Completed final sign-off Mar 2021 | 106 Jordan Av | remodel of basement level, update bath in (e) location, (n) exterior stair and door from side yard to basement, lower slab in lowest level areaDetails
remodel of basement level, update bath in (e) location, (n) exterior stair and door from side yard to basement, lower slab in lowest level area | $300,000 |
| Apr 17, 2019 | Completed final sign-off Nov 2020 | 215 Dorland St | resodential reno - new stairs, new nathroom new laundry new struct work new window and new finishesDetails
resodential reno - new stairs, new nathroom new laundry new struct work new window and new finishes | $125,000 |
| Apr 29, 2016 | Never finaled issued May 2016, no final | 742 Hayes St | new interior stair from ground level to the 2nd level to connect the 2 extg finished spaces. legalize & remodel extg ground floor to full bathroom from 1/2 bath. add utility sink in existing storage room on ground floor per plan. n/a maher ord. 155-13Details
new interior stair from ground level to the 2nd level to connect the 2 extg finished spaces. legalize & remodel extg ground floor to full bathroom from 1/2 bath. add utility sink in existing storage room on ground floor per plan. n/a maher ord. 155-13 | $25,000 |
| Oct 20, 2014 | Completed final sign-off Apr 2015 | 140 Hermann St | revision to p.a#200608230263/s1 and 201311151992, to reflect increased entry stair encorachment into public righ-of-way sidewalk area.Details
revision to p.a#200608230263/s1 and 201311151992, to reflect increased entry stair encorachment into public righ-of-way sidewalk area. |