Back to bathroom remodel contractors
Gngc Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2014 to Apr 2026
- Last 24 months
- 7 permits filed
47 permits since 2000: 35 completed, 4 in progress, 4 never finaled, 4 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
16 bathroom remodel permits: 13 completed, 2 in progress, 1 never finaled. Typically 18 days from filing to permit and 220 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 10, 2026 | In progress issued Apr 2026 | 215 Missouri St | revision to pa# 202503031389: to provide further renovation of existing kitchen and existing second floor bathroom.Details
revision to pa# 202503031389: to provide further renovation of existing kitchen and existing second floor bathroom. | $60,000 |
| Jul 21, 2025 | Completed final sign-off Feb 2026 | 667 34th Av | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $12,500 |
| May 7, 2025 | Completed final sign-off May 2026 | 70 07th Av | upper lvl unit: renovation of kitchen & 2 bathrooms, replace 11 windows (not visible from st) w/ new marvin aluminum clad unitsDetails
upper lvl unit: renovation of kitchen & 2 bathrooms, replace 11 windows (not visible from st) w/ new marvin aluminum clad units | $98,000 |
| Mar 26, 2025 | In progress issued Jul 2025 | 215 Missouri St | rear horizontal addtion @ the 1st & 2nd floors consisting of a new primary bedroom with bath; reconfiguring the (e) ensuite bedroom; 2nd fl expansion with a new family room & new roof deck with spiral stair to rear yard and widening of (e) garage doorDetails
rear horizontal addtion @ the 1st & 2nd floors consisting of a new primary bedroom with bath; reconfiguring the (e) ensuite bedroom; 2nd fl expansion with a new family room & new roof deck with spiral stair to rear yard and widening of (e) garage door | $275,000 |
| Jul 18, 2024 | Completed final sign-off Jul 2024 | 778 39th Av | revision to pa#2024-0605-3824. repair dry rot at north exterior bathroom wall. replace framing & siding, re-install existing window. 10'-0" w x 8' - 0"h north facing exterior bathroom.Details
revision to pa#2024-0605-3824. repair dry rot at north exterior bathroom wall. replace framing & siding, re-install existing window. 10'-0" w x 8' - 0"h north facing exterior bathroom. | $4,000 |
| Jun 5, 2024 | Completed final sign-off Sep 2024 | 778 39th Av | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $12,500 |
| Dec 27, 2022 | Completed final sign-off Jul 2024 | 679 34th Av | interior remodel thru out. expansion of ground fl conditioned space with direct access to upper fl. restore original south elevation lightwell. replace windows. addition of 2 new skylights, add 2 bedrooms. 2 baths & office.Details
interior remodel thru out. expansion of ground fl conditioned space with direct access to upper fl. restore original south elevation lightwell. replace windows. addition of 2 new skylights, add 2 bedrooms. 2 baths & office. | $196,000 |
| Sep 17, 2019 | Completed final sign-off Jan 2026 | 541 10th Av | infill addition below 1st flr to include guest rm & bath. horizontal 1st flr addition/renovation of kitchen. 2nd flr remodel of bathrooms. window replacement in-kind.Details
infill addition below 1st flr to include guest rm & bath. horizontal 1st flr addition/renovation of kitchen. 2nd flr remodel of bathrooms. window replacement in-kind. | $350,000 |
| Jul 18, 2019 | Completed final sign-off Jun 2020 | 3707 Clement St | add new full bathroom and laundry sink at 1 stf lr. replace(5) windows at rear of property not visible from street. create opening in non structural wall btw kitchen and liv rm. replace exterior rear sidingDetails
add new full bathroom and laundry sink at 1 stf lr. replace(5) windows at rear of property not visible from street. create opening in non structural wall btw kitchen and liv rm. replace exterior rear siding | $40,000 |
| Jun 14, 2019 | Completed final sign-off Mar 2021 | 106 Jordan Av | remodel of basement level, update bath in (e) location, (n) exterior stair and door from side yard to basement, lower slab in lowest level areaDetails
remodel of basement level, update bath in (e) location, (n) exterior stair and door from side yard to basement, lower slab in lowest level area | $300,000 |
| Jul 20, 2017 | Completed final sign-off Dec 2017 | 4310 25th St | revision to 201706098950, new structural at bathroom and adjacent hallway for vaulted ceiling. add 2 new skylights, replace in kind with new 4 windows at front exterior - new marvin wood windows.Details
revision to 201706098950, new structural at bathroom and adjacent hallway for vaulted ceiling. add 2 new skylights, replace in kind with new 4 windows at front exterior - new marvin wood windows. | $25,000 |
| Jun 9, 2017 | Completed final sign-off Dec 2017 | 4310 25th St | bathroom remodel, new fixtures, no structural work.Details
bathroom remodel, new fixtures, no structural work. | $17,000 |
| Apr 29, 2016 | Never finaled issued May 2016, no final | 742 Hayes St | new interior stair from ground level to the 2nd level to connect the 2 extg finished spaces. legalize & remodel extg ground floor to full bathroom from 1/2 bath. add utility sink in existing storage room on ground floor per plan. n/a maher ord. 155-13Details
new interior stair from ground level to the 2nd level to connect the 2 extg finished spaces. legalize & remodel extg ground floor to full bathroom from 1/2 bath. add utility sink in existing storage room on ground floor per plan. n/a maher ord. 155-13 | $25,000 |
| Jun 4, 2015 | Completed final sign-off Jan 2016 | 1250 Missouri St | interior remodel of (e)2nd level unit for commerical photography with (e) mezz level. (n)kitchen @ main level & ada bath to be relocated upstairs @ mezz level. (n)finishes, (n) elec throughout . mech elec sep permit. maher not reqDetails
interior remodel of (e)2nd level unit for commerical photography with (e) mezz level. (n)kitchen @ main level & ada bath to be relocated upstairs @ mezz level. (n)finishes, (n) elec throughout . mech elec sep permit. maher not req | $18,000 |
| Feb 3, 2015 | Completed final sign-off Mar 2015 | 742 Hayes St | abatement of unwarrented dwelling unit at the ground floor with removal of existing kitchen. existing half-bath at ground floor to be legalized. first floor will not contain any habitable space.Details
abatement of unwarrented dwelling unit at the ground floor with removal of existing kitchen. existing half-bath at ground floor to be legalized. first floor will not contain any habitable space. | $5,000 |
| Sep 10, 2014 | Completed final sign-off May 2018 | 396 Connecticut St | revision to pa 201406198872 to add a window to the new master bath. and replacement of existing windows per plan. u factor not > .32Details
revision to pa 201406198872 to add a window to the new master bath. and replacement of existing windows per plan. u factor not > .32 | $6,000 |