Gmi Construction Inc
- Based in
- Castro Valley
- On San Francisco permits
- Sep 2017 to Sep 2021
- Last 24 months
- 0 permits filed
5 permits since 2000: 4 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 3 completed. Typically 243 days from filing to permit and 497 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 23, 2021 | Completed final sign-off Mar 2023 | 451 Cortland Av | remove extg non -permitted stairs and guardrails. remove extg doors with new singe hund window. u = 0.30 max.Details
remove extg non -permitted stairs and guardrails. remove extg doors with new singe hund window. u = 0.30 max. | $5,000 |
| Aug 31, 2020 | Completed final sign-off Feb 2022 | 1235 19th Av | comply w/ nov #202037293: remove existing unpermitted walkway, structure, and rear building. proposed new concrete walkway with stair and handrail at existing concrete walkway.Details
comply w/ nov #202037293: remove existing unpermitted walkway, structure, and rear building. proposed new concrete walkway with stair and handrail at existing concrete walkway. | $12,000 |
| Sep 22, 2017 | Completed final sign-off Oct 2019 | 1411 Florida St | add (1)(n) unit of ground floor in place of an (e) garage. all work within (e) bldg envelop per planning ord# 162-16 adu legislation. provide 1-hr rated exit corridor to connect to (e) rear stairs. ref approved soft story permit #201708306423. separate sprinkler permit.Details
add (1)(n) unit of ground floor in place of an (e) garage. all work within (e) bldg envelop per planning ord# 162-16 adu legislation. provide 1-hr rated exit corridor to connect to (e) rear stairs. ref approved soft story permit #201708306423. separate sprinkler permit. | $120,000 |