Block 4336, lot 015
1411 Florida St
- City’s use
- Multi-Family Residential
- Built
- 1913
- Stories
- 3
- Units
- 7
- Rooms
- 14 bedrooms, 7 bathrooms
- Building
- 4,560 sq ft
- Lot
- 1,999 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 17, 2025 | Completed final sign-off Sep 2025 | 1411 Florida St | Gateway Roofing And Water Proofing Inc | re-roofing. hot works. no work to (e) roof structural sheathing.Details
re-roofing. hot works. no work to (e) roof structural sheathing. | $26,160 |
| Sep 24, 2019 | Completed final sign-off Oct 2019 | 1411 Florida St | to obtain final inspection for work approved under pa#201708306423. all work is completeDetails
to obtain final inspection for work approved under pa#201708306423. all work is complete | ||
| Sep 24, 2019 | Completed final sign-off Oct 2019 | 1411 Florida St | to obtain final inspetion for work approved under pa#201802010116. all work is completeDetails
to obtain final inspetion for work approved under pa#201802010116. all work is complete | ||
| Aug 6, 2019 | Completed final sign-off Oct 2019 | 1411 Florida St | rev to pa 201709229395 & 201903084774; relocate ground floor adu unit entry to exteriorDetails
rev to pa 201709229395 & 201903084774; relocate ground floor adu unit entry to exterior | $2,000 | |
| Apr 4, 2019 | Completed final sign-off Jul 2019 | 1411 Florida St | Gucho Plumbing | as built drawings for the new fire sprinkler system for the dwelling application #201808207800Details
as built drawings for the new fire sprinkler system for the dwelling application #201808207800 | |
| Mar 8, 2019 | Completed final sign-off Oct 2019 | 1411 Florida St | Barrera & Associates Construction Inc | relocate egress corridor to inside, (e) gas meters to remain. provide (n) metal gate. revision to adu bedrooms layout pa# 201709229395.Details
relocate egress corridor to inside, (e) gas meters to remain. provide (n) metal gate. revision to adu bedrooms layout pa# 201709229395. | $2,500 |
| Dec 31, 2018 | Never finaled issued Dec 2018, no final | 1411 Florida St | street spaceDetails
street space | ||
| Dec 13, 2018 | Completed final sign-off Aug 2019 | 1411 Florida St | Crime Watch Security Sys Llc | installation of a new fire alarm system with sprinkler monitering, ref pa# 201709229395, ref sprinkler pa# 201808207800Details
installation of a new fire alarm system with sprinkler monitering, ref pa# 201709229395, ref sprinkler pa# 201808207800 | $18,000 |
| Aug 20, 2018 | Completed final sign-off Jul 2019 | 1411 Florida St | Gucho Plumbing | new fire sprinkler system for the dwelling nfpa 13 ref {2017-0922-9395}Details
new fire sprinkler system for the dwelling nfpa 13 ref {2017-0922-9395} | $7,500 |
| Apr 26, 2018 | Completed final sign-off Aug 2019 | 1411 Florida St | Barrera & Associates Construction Inc | revised structural drawings per approved app#201709229395 to amend to soft story permit #201708306423Details
revised structural drawings per approved app#201709229395 to amend to soft story permit #201708306423 | $11,500 |
| Apr 23, 2018 | Never finaled issued Apr 2018, no final | 1411 Florida St | street spaceDetails
street space | ||
| Feb 1, 2018 | Expired or cancelled expired Oct 2019 | 1411 Florida St | Gmi Construction Inc | unit 1, 3, & 6: replace 6 bathroom sinks, 3 toilet change service 8 meter panel 3 sub panel 9 outlets, 3 rest rooms fans add 6 circuits 3 replace water heaterDetails
unit 1, 3, & 6: replace 6 bathroom sinks, 3 toilet change service 8 meter panel 3 sub panel 9 outlets, 3 rest rooms fans add 6 circuits 3 replace water heater | $35,000 |
| Sep 22, 2017 | Completed final sign-off Oct 2019 | 1411 Florida St | Gmi Construction Inc, Barrera & Associates Construction Inc | add (1)(n) unit of ground floor in place of an (e) garage. all work within (e) bldg envelop per planning ord# 162-16 adu legislation. provide 1-hr rated exit corridor to connect to (e) rear stairs. ref approved soft story permit #201708306423. separate sprinkler permit.Details
add (1)(n) unit of ground floor in place of an (e) garage. all work within (e) bldg envelop per planning ord# 162-16 adu legislation. provide 1-hr rated exit corridor to connect to (e) rear stairs. ref approved soft story permit #201708306423. separate sprinkler permit. | $120,000 |
| Aug 30, 2017 | Expired or cancelled expired Oct 2019 | 1411 Florida St | soft story upgrade in compliance w/mandatory ordinance per sfebc chapter 4d, 2016 cebc appendix a-4.Details
soft story upgrade in compliance w/mandatory ordinance per sfebc chapter 4d, 2016 cebc appendix a-4. | $70,000 | |
| Oct 1, 2004 | Never finaled issued Oct 2004, no final | 1411 Florida St | street space permitDetails
street space permit | ||
| Oct 10, 2000 | Completed final sign-off Oct 2000 | 1411 Florida St | repair rear stairsDetails
repair rear stairs | $7,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Barrera & Associates Construction Inc (3), Gmi Construction Inc (2), Gucho Plumbing (2), Crime Watch Security Sys Llc, Gateway Roofing And Water Proofing Inc
- Architects
- Dawn Ma
- Engineers
- Dawn Ma (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.