1,317 permits since 2000: 1,171 completed, 18 in progress, 61 never finaled, 67 expired or cancelled.
Of the 61 never-finaled permits, 7 are 3 to 5 years old, 14 are 5 to 10 years old, 40 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
167 bathroom remodel permits: 148 completed, 4 in progress, 10 never finaled, 5 expired or cancelled. Typically 0 days from filing to permit and 153 days from permit to final inspection.
Showing the 100 most recent of 167.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 24, 2026 | In progress filed Sep 2026, not yet issued | 4278 Cesar Chavez St | revise permit 2026-0629-4099 to document the removal of the previously approved basement closet, the addition of a basement level bathroom, and the configuration of previously approved interior stair system along with minor framing and foundation related changes.Details
revise permit 2026-0629-4099 to document the removal of the previously approved basement closet, the addition of a basement level bathroom, and the configuration of previously approved interior stair system along with minor framing and foundation related changes. | |
| Aug 20, 2026 | In progress issued Aug 2026 | 3541 Washington St | hall bath remodel 10x7. no tub to shower conversions.Details
hall bath remodel 10x7. no tub to shower conversions. | $28,000 |
| Apr 28, 2026 | In progress issued Apr 2026 | 60 27th Av | remodel 3 bathrooms like for like. primary 126 sq ft, shared 70 sq ft, family 55 sqft.Details
remodel 3 bathrooms like for like. primary 126 sq ft, shared 70 sq ft, family 55 sqft. | $65,000 |
| Dec 9, 2025 | Completed final sign-off Jul 2026 | 68 Mendosa Av | kitchen and 10x10 master bathroom remodel. all in kind like for like. no wall movement.Details
kitchen and 10x10 master bathroom remodel. all in kind like for like. no wall movement. | $62,000 |
| Nov 26, 2025 | In progress issued Dec 2025 | 80 Agua Wy | non structural , interior remodel to existing bath. add one bath. demo existing tub, shower pan, vanity and toilet per plan. replace 2 doors. install new tub, vanity, toilet, and plumbing fixtures. install new exhaust fan and lighting fixtures. retile and paint where needed.Details
non structural , interior remodel to existing bath. add one bath. demo existing tub, shower pan, vanity and toilet per plan. replace 2 doors. install new tub, vanity, toilet, and plumbing fixtures. install new exhaust fan and lighting fixtures. retile and paint where needed. | $35,000 |
| Aug 21, 2025 | Completed final sign-off Oct 2026 | 7 Kronquist Ct | remodel (2) bathrooms in-kind; 10x6 each.Details
remodel (2) bathrooms in-kind; 10x6 each. | $47,500 |
| May 22, 2025 | Completed final sign-off Jul 2025 | 1448 Hyde St | revision to permit #202312212913. replace one window in kind in bathroom. not visible from streetDetails
revision to permit #202312212913. replace one window in kind in bathroom. not visible from street | $600 |
| Mar 11, 2025 | Completed final sign-off Jun 2025 | 327 Moultrie St | bathroom remodel a like in like - in kind. no wall moving. new toilet, sink, tile, hardware, shower, etc.Details
bathroom remodel a like in like - in kind. no wall moving. new toilet, sink, tile, hardware, shower, etc. | $34,000 |
| Feb 27, 2025 | Completed final sign-off Mar 2026 | 3545 Washington St | remodel/reconfigure and expand (e) kitchen; remodel 2 full baths and 1 powder room; replace (e) windows & rear bedroom with (n) patio doorsDetails
remodel/reconfigure and expand (e) kitchen; remodel 2 full baths and 1 powder room; replace (e) windows & rear bedroom with (n) patio doors | $180,000 |
| Feb 11, 2025 | Completed final sign-off May 2025 | 365 28th St | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $35,000 |
| Jan 30, 2025 | Completed final sign-off Jul 2025 | 45 26th Av | 1 bathroom remodel in kind. no walls moving. new tiles, shower, vanity, etc. no change in plumbing fixture count.Details
1 bathroom remodel in kind. no walls moving. new tiles, shower, vanity, etc. no change in plumbing fixture count. | $35,000 |
| Jan 9, 2025 | Completed final sign-off Oct 2025 | 122 Parker Av | install new elevator btw 1st & 2nd fls. add new bathroom at 1st fl. relocate & remodel e) water closet & laundry at 1st/f. replace 1 window at 2nd/f at rear & 2 window at side in e) openings. not visible from stDetails
install new elevator btw 1st & 2nd fls. add new bathroom at 1st fl. relocate & remodel e) water closet & laundry at 1st/f. replace 1 window at 2nd/f at rear & 2 window at side in e) openings. not visible from st | $165,000 |
| Dec 23, 2024 | Completed final sign-off Feb 2026 | 75 Wawona St | 1st fl. convert (e) storage space into conditiond space bedrom, 2 bathrooms. 2nd fl: new wood staircase to connect first and sencond fl. replacement foundation, excavate 6" for additional heightDetails
1st fl. convert (e) storage space into conditiond space bedrom, 2 bathrooms. 2nd fl: new wood staircase to connect first and sencond fl. replacement foundation, excavate 6" for additional height | $50,000 |
| Dec 19, 2024 | Completed final sign-off Apr 2025 | 1570 47th Av | bathroom remodel. remodel a like for like. new tile, vanity, toilet, fixture ext.Details
bathroom remodel. remodel a like for like. new tile, vanity, toilet, fixture ext. | $35,000 |
| Dec 4, 2024 | Completed final sign-off Apr 2025 | 143 Chilton Av | revision to permit# 202408198966: in kind framing repair at floors. replace floor joist in kitchen and bathroom same size, like in kindDetails
revision to permit# 202408198966: in kind framing repair at floors. replace floor joist in kitchen and bathroom same size, like in kind | $3,500 |
| Nov 19, 2024 | Completed final sign-off Mar 2025 | 41 Merced Av | bathroom remodel. no walls of fixtures moving. remdel like in kind. new tiles, vanity, shower, toilet, etc.Details
bathroom remodel. no walls of fixtures moving. remdel like in kind. new tiles, vanity, shower, toilet, etc. | $35,000 |
| Oct 15, 2024 | Expired or cancelled expired Mar 2026 | 1362 19th Av | repair front stairs a like in-kind, less than 50% repair. dry rot repair to back of buiding 100sf. interior sheetrock work repir. remodel small bathroom like in-kind. no walls or fixtures moving. new tilet, toilet, vanity shower etc new fixtures. work at rectory/residence.Details
repair front stairs a like in-kind, less than 50% repair. dry rot repair to back of buiding 100sf. interior sheetrock work repir. remodel small bathroom like in-kind. no walls or fixtures moving. new tilet, toilet, vanity shower etc new fixtures. work at rectory/residence. | $83,000 |
| Aug 19, 2024 | Completed final sign-off Apr 2025 | 143 Chilton Av | in kind kitchen remodel: flooring, walls, cabinets, appliances & window (non st visible). bath remodel: flooring,walls, windows,fixtures, shower in lieu of tub,new laundry area adjacent to the bathroom, new electrical tankless water heater next to laundry,new elec panel 100 to 200amp.Details
in kind kitchen remodel: flooring, walls, cabinets, appliances & window (non st visible). bath remodel: flooring,walls, windows,fixtures, shower in lieu of tub,new laundry area adjacent to the bathroom, new electrical tankless water heater next to laundry,new elec panel 100 to 200amp. | $75,000 |
| Jun 4, 2024 | Completed final sign-off Feb 2025 | 651 15th Av | 1 bathroom remodel. no walls or fixtures moving. remodel a like in kind. new tile, toilet, sink, pocket door(door-in same location) etc.Details
1 bathroom remodel. no walls or fixtures moving. remodel a like in kind. new tile, toilet, sink, pocket door(door-in same location) etc. | $35,000 |
| May 3, 2024 | Completed final sign-off Dec 2024 | 570 Diamond St | remodel of 3 existing bathrooms.Details
remodel of 3 existing bathrooms. | $110,000 |
| Dec 21, 2023 | Completed final sign-off Jul 2025 | 1448 Hyde St | bathroom remodel. remodel a like in kind. no walls moving. new fixtures, tile, floors, vanity, tub etc.Details
bathroom remodel. remodel a like in kind. no walls moving. new fixtures, tile, floors, vanity, tub etc. | $25,000 |
| Sep 27, 2023 | Completed final sign-off May 2024 | 856 Green St | upstairs kitchen and bath remodel,no layout changes- in kind no walls moving, no counters, tile,vanity, appliances, sink and fixturesDetails
upstairs kitchen and bath remodel,no layout changes- in kind no walls moving, no counters, tile,vanity, appliances, sink and fixtures | $50,000 |
| Aug 30, 2023 | Completed final sign-off Aug 2024 | 16 Entrada Ct | @ basement turn powder rm into full bathrm; (n) walls to seperate storage rms and garage; replacement (e) door & windows; (n) posts and beam at garage; at 1st fl turn closet intp powder rm; remodel bathroom. (n) window at bathrm; (n) skylight on flat roof. new basement bathrm. window to be alum.Details
@ basement turn powder rm into full bathrm; (n) walls to seperate storage rms and garage; replacement (e) door & windows; (n) posts and beam at garage; at 1st fl turn closet intp powder rm; remodel bathroom. (n) window at bathrm; (n) skylight on flat roof. new basement bathrm. window to be alum. | $100,000 |
| Jun 5, 2023 | Completed final sign-off Oct 2023 | 301 Kensington Wy | master bath remodel on main levelDetails
master bath remodel on main level | $60,000 |
| Oct 12, 2022 | Never finaled issued Apr 2023, no final | 2823 Laguna St | 3rd fl: convert (e) living room and (e) bathroom to (n) primary bedroom and bathroom. remove (e) bedroom for (n) office 52 sf.Details
3rd fl: convert (e) living room and (e) bathroom to (n) primary bedroom and bathroom. remove (e) bedroom for (n) office 52 sf. | $15,000 |
| Aug 2, 2022 | Never finaled issued Aug 2022, no final | 649 15th Av | bathroom remodel, no walls moving. remodel in-kind. new cabinets, vanity, sink, toilet, fan, tile, etc.Details
bathroom remodel, no walls moving. remodel in-kind. new cabinets, vanity, sink, toilet, fan, tile, etc. | $12,500 |
| Jul 7, 2022 | Completed final sign-off Aug 2023 | 18 Manzanita Av | convert laundry area to new office, convert extg closet to laundry, replace bathroom fixtures at 1st floor, remodel kitchen, enlarge primary bedroom's closet.Details
convert laundry area to new office, convert extg closet to laundry, replace bathroom fixtures at 1st floor, remodel kitchen, enlarge primary bedroom's closet. | $150,000 |
| Jun 13, 2022 | Completed final sign-off Oct 2022 | 3428 16th St | one bathroom remodel. remodel shower only, new shower door, new tile, new niche, new fixtures, new shower curb.Details
one bathroom remodel. remodel shower only, new shower door, new tile, new niche, new fixtures, new shower curb. | $12,000 |
| Apr 21, 2022 | Completed final sign-off Feb 2023 | 2555 Market St | unit #11: one bathroom remodel, no walls moving, new vanity, tile, counters tile, toilet, new shower, remodel a like in kind, one kitchen remodel, no walls moving, new counters, cabinets, and floors remodel a like in-kindDetails
unit #11: one bathroom remodel, no walls moving, new vanity, tile, counters tile, toilet, new shower, remodel a like in kind, one kitchen remodel, no walls moving, new counters, cabinets, and floors remodel a like in-kind | $45,000 |
| Apr 13, 2022 | Completed final sign-off Oct 2022 | 28 Cumberland St | one kitchen and one bathroom remodle. no walls or fixtures moving. remodel alike in kind. new cabinets, counters, tile, vanity, appliances, shower, shower glass. replace (6) existing windows, not street facing with new windows alike in kind.Details
one kitchen and one bathroom remodle. no walls or fixtures moving. remodel alike in kind. new cabinets, counters, tile, vanity, appliances, shower, shower glass. replace (6) existing windows, not street facing with new windows alike in kind. | $60,000 |
| Jan 4, 2022 | Completed final sign-off Jun 2022 | 1522 Sanchez St | one bathroom remodel: new shower, toilet, tile, vanity, no walls moving.Details
one bathroom remodel: new shower, toilet, tile, vanity, no walls moving. | $20,000 |
| Oct 12, 2021 | Completed final sign-off Mar 2022 | 463 17th Av | one small bathroom remodel. a like in kind. no fixtures or walls moving. new shower in same location. new tile. new lighting in same location.Details
one small bathroom remodel. a like in kind. no fixtures or walls moving. new shower in same location. new tile. new lighting in same location. | $14,000 |
| Oct 6, 2021 | Completed final sign-off Apr 2022 | 1025 Minna St | #4: bathroom remodel. new sink, vanity, fixtures etc. no walls moving. remodel a like in kind.Details
#4: bathroom remodel. new sink, vanity, fixtures etc. no walls moving. remodel a like in kind. | $30,000 |
| Jun 11, 2021 | Completed final sign-off Feb 2022 | 62 Santa Ysabel Av | the project will use 40 sq ft. of (e) basement space to create a new full bathroom with sink, toilet and shower, the bathroom is unconditionedDetails
the project will use 40 sq ft. of (e) basement space to create a new full bathroom with sink, toilet and shower, the bathroom is unconditioned | $20,000 |
| Apr 21, 2021 | Completed final sign-off Nov 2021 | 1755 Page St | bathroom remodel,in kind, no walls moving. new sink, tile, vanity,toilet, bathrub.Details
bathroom remodel,in kind, no walls moving. new sink, tile, vanity,toilet, bathrub. | $35,000 |
| Mar 16, 2021 | Completed final sign-off Nov 2021 | 110 Fernwood Dr | bathroom remodel to downstairs bathroom. remodel bathroom a like in kind. new shower, tub, sink, vanity, tile, etc.Details
bathroom remodel to downstairs bathroom. remodel bathroom a like in kind. new shower, tub, sink, vanity, tile, etc. | $40,000 |
| Feb 10, 2021 | Completed final sign-off Oct 2021 | 2518 17th Av | remodel hall bathroom. (n) french doors to replace (e) window at rear with (n) wood deck, less than 30" above grade. replace 2 windows at light well in kind.Details
remodel hall bathroom. (n) french doors to replace (e) window at rear with (n) wood deck, less than 30" above grade. replace 2 windows at light well in kind. | $22,500 |
| Feb 4, 2021 | Completed final sign-off Aug 2021 | 356 Hazelwood Av | kitchen remodel includes new countertop, cabinets, sink, stove, and hood. bathroom remodel incluldes new tile, floors, and vanity.Details
kitchen remodel includes new countertop, cabinets, sink, stove, and hood. bathroom remodel incluldes new tile, floors, and vanity. | $20,000 |
| Jan 27, 2021 | Completed final sign-off Sep 2021 | 272 Oneida Av | rev to pa202008051173: remove property line window & remove illegal bathroom on g/f.Details
rev to pa202008051173: remove property line window & remove illegal bathroom on g/f. | $600 |
| Jan 25, 2021 | Never finaled issued Mar 2023, no final | 139 Edinburgh St | horizontal expansion to add breakfast area on 1st fl & bedroom & bathroom on 2nd fl. renovation of bathrooms. replace windows as notedDetails
horizontal expansion to add breakfast area on 1st fl & bedroom & bathroom on 2nd fl. renovation of bathrooms. replace windows as noted | $275,000 |
| Jan 7, 2021 | Completed final sign-off Nov 2021 | 45 26th Av | revision to app#202007019458: 1) revise 2nd floor framing per as built conditions. 2)relocate shear walls at 3rd floor framing plan. 2)remodel master bathroom.Details
revision to app#202007019458: 1) revise 2nd floor framing per as built conditions. 2)relocate shear walls at 3rd floor framing plan. 2)remodel master bathroom. | $17,000 |
| Dec 28, 2020 | Completed final sign-off Aug 2021 | 267 23rd Av | revision to 202012080465. no bath remodels at this timeDetails
revision to 202012080465. no bath remodels at this time | |
| Dec 8, 2020 | Completed final sign-off Aug 2021 | 267 23rd Av | unit #267 & 269: bathroom remodel in-kind. new tile, cabinets, vanity, sink, shower, etc. unit #269: remodel kitchen in kind, new tile, floors, sink, etc. no moving walls, new fixtures, new counters.Details
unit #267 & 269: bathroom remodel in-kind. new tile, cabinets, vanity, sink, shower, etc. unit #269: remodel kitchen in kind, new tile, floors, sink, etc. no moving walls, new fixtures, new counters. | $80,000 |
| Nov 23, 2020 | Completed final sign-off Jun 2023 | 535 Urbano Dr | renovation of kitchen & (2) bathrooms in (e) split level house @ 535 urbano dr. project also includes the addition of (2)(n) closets & replacement of (e) windows in kitchen & all bedrooms & bathrooms.Details
renovation of kitchen & (2) bathrooms in (e) split level house @ 535 urbano dr. project also includes the addition of (2)(n) closets & replacement of (e) windows in kitchen & all bedrooms & bathrooms. | $50,000 |
| Sep 30, 2020 | Completed final sign-off Nov 2023 | 202 Duncan St | remodel (1) kitchen & (1) bathroom, studio apartment. nove moving walls, new appliances, fixtures, floors, courters, etc. new new walls, new lighting shall comply with cec 150.0(k)3 & (k)5. all new fixtures remain at same location as (e).Details
remodel (1) kitchen & (1) bathroom, studio apartment. nove moving walls, new appliances, fixtures, floors, courters, etc. new new walls, new lighting shall comply with cec 150.0(k)3 & (k)5. all new fixtures remain at same location as (e). | $70,000 |
| Sep 16, 2020 | Completed final sign-off Dec 2024 | 1478 Funston Av | remodel first floor kitchen and bathroom, add 103 sqft room on the back of the house on the basement level, add 220 sqft of elevated deck and stair on the backyard.Details
remodel first floor kitchen and bathroom, add 103 sqft room on the back of the house on the basement level, add 220 sqft of elevated deck and stair on the backyard. | $200,000 |
| Jul 15, 2020 | Never finaled issued Jul 2020, no final | 40 28th St | bathroom (~6'x8') and kitchen (~12'x8') remodel. replace bathroom sink, shower, faucet, toilet . replace kitchen sink. all work in kind.Details
bathroom (~6'x8') and kitchen (~12'x8') remodel. replace bathroom sink, shower, faucet, toilet . replace kitchen sink. all work in kind. | $45,000 |
| Jul 1, 2020 | Completed final sign-off Nov 2021 | 45 26th Av | remodel e kitchen, change e bedroom and bath at 1st fl into a family rm. add a bath at 2nd fl. remodel existing bath at 2nd fl, relocate laundry to 2nd flDetails
remodel e kitchen, change e bedroom and bath at 1st fl into a family rm. add a bath at 2nd fl. remodel existing bath at 2nd fl, relocate laundry to 2nd fl | $95,000 |
| May 19, 2020 | Completed final sign-off Nov 2020 | 348 Hazelwood Av | 2nd flr-remodel (e) kitchen and mudroom w/ (n) cabinetry, appliances & finishes. remove wall btwn dining & kitchen and add (n) wall. (n) openings at living rm north wall. 3rd flr-hall bathrm: (n) fixture locations & finishes. (n) master bath & closet in north flr area of (e) master bedroomDetails
2nd flr-remodel (e) kitchen and mudroom w/ (n) cabinetry, appliances & finishes. remove wall btwn dining & kitchen and add (n) wall. (n) openings at living rm north wall. 3rd flr-hall bathrm: (n) fixture locations & finishes. (n) master bath & closet in north flr area of (e) master bedroom | $38,500 |
| Dec 17, 2019 | Completed final sign-off Dec 2021 | 163 04th Av | convert 354.2 sq ft ground floor storage space - unconditioned to conditioned livable space - home office. new rear door & window facing rear yard and 2 side property line windows, 3/4 hour fire rated units. new full bathroom added to space.Details
convert 354.2 sq ft ground floor storage space - unconditioned to conditioned livable space - home office. new rear door & window facing rear yard and 2 side property line windows, 3/4 hour fire rated units. new full bathroom added to space. | $30,000 |
| Oct 29, 2019 | Completed final sign-off Mar 2020 | 1025 Minna St | unit 4 - remodel 1 bathroom: new toilet, sink, fixtures, and flooring. remodel kitchen: new fixtures, counter tops, cabinets, backsplashDetails
unit 4 - remodel 1 bathroom: new toilet, sink, fixtures, and flooring. remodel kitchen: new fixtures, counter tops, cabinets, backsplash | $20,000 |
| Sep 27, 2019 | Expired or cancelled withdrawn Mar 2023 | 463 17th Av | remodel (e) bath and add a bedrm on ground flr. enclose utilities and construct storage closets(within (e) bldg envelope). extend (e) deck into rear yard and add stairs from 1st flr to rear yard.Details
remodel (e) bath and add a bedrm on ground flr. enclose utilities and construct storage closets(within (e) bldg envelope). extend (e) deck into rear yard and add stairs from 1st flr to rear yard. | $125,000 |
| Aug 30, 2019 | Completed final sign-off Sep 2022 | 330 Moultrie St | remodel basement to include family room (den), bedroom, and bathroom. modify layout of upstairs to accommodate stairs down to basement. bump out back approx 5 feet to accomodate stairwell.Details
remodel basement to include family room (den), bedroom, and bathroom. modify layout of upstairs to accommodate stairs down to basement. bump out back approx 5 feet to accomodate stairwell. | $275,000 |
| Jul 11, 2019 | Completed final sign-off Oct 2020 | 99 San Anselmo Av | remodel of (e) office and bathroom at ground floorDetails
remodel of (e) office and bathroom at ground floor | $15,000 |
| Nov 6, 2018 | Completed final sign-off Jul 2019 | 534 Spruce St | bathroom remodel, all fixtures in same location, new medicine cabinet, vanitey, new bathtub, new tileDetails
bathroom remodel, all fixtures in same location, new medicine cabinet, vanitey, new bathtub, new tile | $40,000 |
| Nov 6, 2018 | Completed final sign-off Feb 2019 | 136 Mountain Springs Av | bathroom remodel, same locations, new shower because of leak, new tile 5'x 8'Details
bathroom remodel, same locations, new shower because of leak, new tile 5'x 8' | $15,000 |
| Jul 6, 2018 | Completed final sign-off Nov 2018 | 543 Ramsell St | revision to bpa#201805229830, bathroom remodel, remove/replace in-kind toilet, sink, faucet, vanity, tile & finishesDetails
revision to bpa#201805229830, bathroom remodel, remove/replace in-kind toilet, sink, faucet, vanity, tile & finishes | |
| Jun 12, 2018 | Completed final sign-off Mar 2019 | 371 Diamond St | bathroom remodel, new sink, vanity, tile and shower. shower outler in same location. new toilet and sinks in same location. install sheetrock at disturbed areas. new medicine cabinets. no change on walls and openings.Details
bathroom remodel, new sink, vanity, tile and shower. shower outler in same location. new toilet and sinks in same location. install sheetrock at disturbed areas. new medicine cabinets. no change on walls and openings. | $10,000 |
| May 22, 2018 | Completed final sign-off Oct 2018 | 119 07th Av | bathroom remodel - frame in new medicine cabinet over sink, and niche at shower area. new toilet in same location, new vanity sink. new tile and floor install weinscoting ib bathroom walls. remodel in kind. same location.Details
bathroom remodel - frame in new medicine cabinet over sink, and niche at shower area. new toilet in same location, new vanity sink. new tile and floor install weinscoting ib bathroom walls. remodel in kind. same location. | $17,000 |
| May 7, 2018 | Completed final sign-off Sep 2018 | 109 St Marys Av | bathroom size 5x7. bathroom remodel, remove toilet, sink, vanity ect. relocate and install new shower valves and drain. no electrical. new toilet. new vanity. lighting per cec 150.01kDetails
bathroom size 5x7. bathroom remodel, remove toilet, sink, vanity ect. relocate and install new shower valves and drain. no electrical. new toilet. new vanity. lighting per cec 150.01k | $17,000 |
| Feb 27, 2018 | Completed final sign-off Jul 2018 | 1567 42nd Av | remodel of bathroom, replace light fixtures, replace window, replace 3 flat skylights, new interior finishes, second floor bathroom. replace double hung clad window at front of building in-kind as existing.Details
remodel of bathroom, replace light fixtures, replace window, replace 3 flat skylights, new interior finishes, second floor bathroom. replace double hung clad window at front of building in-kind as existing. | $70,000 |
| Jul 13, 2017 | Completed final sign-off Apr 2018 | 117 St Marys Av | #117- bathroom repair, remove dry rot adjacent to tub. #119- remove sheatrock at ceiling, remove sub floor, complete install new subfloor at disturbed area. all work repair in kind.Details
#117- bathroom repair, remove dry rot adjacent to tub. #119- remove sheatrock at ceiling, remove sub floor, complete install new subfloor at disturbed area. all work repair in kind. | $13,000 |
| May 24, 2017 | Completed final sign-off Oct 2017 | 1966 Grove St | bathroom remodel. remodel in kind. no structural work.Details
bathroom remodel. remodel in kind. no structural work. | $47,700 |
| May 16, 2017 | Completed final sign-off Aug 2017 | 33 Miraloma Dr | 7'x10' bathroom remodel.Details
7'x10' bathroom remodel. | $22,000 |
| Apr 10, 2017 | Expired or cancelled cancelled Aug 2018 | 371 Diamond St | 8 x 5 bathroom remodel.Details
8 x 5 bathroom remodel. | $11,000 |
| Jan 13, 2017 | Completed final sign-off Jun 2017 | 115 Kenwood Wy | bathroom remodel in kind: shower, med cabinet, vanity, membrane.Details
bathroom remodel in kind: shower, med cabinet, vanity, membrane. | $8,000 |
| Dec 13, 2016 | Completed final sign-off Dec 2017 | 99 San Anselmo Av | replace 1 bathroom window replace master bathroom window with a new larger size-match existing detailDetails
replace 1 bathroom window replace master bathroom window with a new larger size-match existing detail | $3,000 |
| Nov 1, 2016 | Completed final sign-off Jul 2017 | 56 Levant St | remodel (2) bath in kind, 8x6, 5x8Details
remodel (2) bath in kind, 8x6, 5x8 | $60,000 |
| Oct 13, 2016 | Completed final sign-off Feb 2022 | 2264 Green St | add dwelling units #2266 #4 & 2266 #5. ordinance #162-16. renovation to 2266 #4 to include (n) opening from sleeping space. renovation to 2266 #6 to include (n) entry & remodel kitchen & bathroom. exterior work:(n) egress door @ facade per sffd.Details
add dwelling units #2266 #4 & 2266 #5. ordinance #162-16. renovation to 2266 #4 to include (n) opening from sleeping space. renovation to 2266 #6 to include (n) entry & remodel kitchen & bathroom. exterior work:(n) egress door @ facade per sffd. | $5,500 |
| Oct 3, 2016 | Completed final sign-off Dec 2017 | 99 San Anselmo Av | remodel master bathroom and hall bathroom on 2/fDetails
remodel master bathroom and hall bathroom on 2/f | $30,000 |
| Jul 14, 2016 | Completed final sign-off Aug 2016 | 189 Commonwealth Av | remove & replace damaged joist @ bath & bedroom ceiling. repair in kindDetails
remove & replace damaged joist @ bath & bedroom ceiling. repair in kind | $8,000 |
| Jun 6, 2016 | Completed final sign-off May 2017 | 214 Shrader St | interior remodel of existing 3rd fl flat, remodel existing kitchen and existing bath. add 1 new bath, laundry room. convert e laundry room to office. no building expansion, no work visable from street, interior wall demo less than 75%Details
interior remodel of existing 3rd fl flat, remodel existing kitchen and existing bath. add 1 new bath, laundry room. convert e laundry room to office. no building expansion, no work visable from street, interior wall demo less than 75% | $200,000 |
| May 11, 2016 | Completed final sign-off Apr 2017 | 479 14th Av | interior remodel of bathrooms, kitchen and new hallway to (e) sunroom, convert sunroom to a third bedroom. n/a maher ordinance #155-13Details
interior remodel of bathrooms, kitchen and new hallway to (e) sunroom, convert sunroom to a third bedroom. n/a maher ordinance #155-13 | $30,000 |
| Apr 19, 2016 | Completed final sign-off Nov 2016 | 261 Waller St | one bathroom and one kitchen remodel, in kindDetails
one bathroom and one kitchen remodel, in kind | $70,000 |
| Apr 12, 2016 | Completed final sign-off Jul 2016 | 471 29th St | bath remodel 5x6.5Details
bath remodel 5x6.5 | $18,000 |
| Mar 1, 2016 | Completed final sign-off Mar 2016 | 180 Santa Rosa Av | remove & replace bath fan & drywall. install voluntary to foundation bolts.Details
remove & replace bath fan & drywall. install voluntary to foundation bolts. | $5,000 |
| Feb 11, 2016 | Completed final sign-off Aug 2016 | 3619 19th St | bathroom remodel in-kind 6x8.Details
bathroom remodel in-kind 6x8. | $28,500 |
| Oct 26, 2015 | Completed final sign-off Feb 2016 | 3519 Sacramento St | rev. to 201309267828 - & 201507302921 - closet & bathroom flipped so unit below is not affected.Details
rev. to 201309267828 - & 201507302921 - closet & bathroom flipped so unit below is not affected. | |
| Sep 1, 2015 | Completed final sign-off Dec 2015 | 136 Mountain Springs Av | bathroom remodel in-kind, 4' x 6'.Details
bathroom remodel in-kind, 4' x 6'. | $26,000 |
| Aug 14, 2015 | Completed final sign-off Jan 2016 | 8325 Geary Bl | bath remodel in kind, 11x7 area.Details
bath remodel in kind, 11x7 area. | $26,000 |
| Aug 14, 2015 | Completed final sign-off Sep 2015 | 354 Lexington St | remove & replace tub & tile in kind. 5x5 bath.Details
remove & replace tub & tile in kind. 5x5 bath. | $5,500 |
| Aug 14, 2015 | Completed final sign-off Dec 2015 | 455 Vallejo St | kitchen 10x8 & bath 6x7 remodel. everything in kind.Details
kitchen 10x8 & bath 6x7 remodel. everything in kind. | $39,000 |
| Jul 9, 2015 | Completed final sign-off Nov 2015 | 1 Douglass St | rev. to pa#201506189297: addt'l dry rot damage under bath wall.Details
rev. to pa#201506189297: addt'l dry rot damage under bath wall. | $3,400 |
| Jul 7, 2015 | Completed final sign-off Nov 2016 | 669 Shrader St | legalize existing basement by increasing head height. add new bath, bddroom, laundry/tv room at baseement at 1st fl, remodel kitchen and bathDetails
legalize existing basement by increasing head height. add new bath, bddroom, laundry/tv room at baseement at 1st fl, remodel kitchen and bath | $150,000 |
| Jun 18, 2015 | Completed final sign-off Nov 2015 | 1 Douglass St | bathroom remodel 8x10, remove & replace in-kind.Details
bathroom remodel 8x10, remove & replace in-kind. | $28,000 |
| Mar 12, 2015 | Completed final sign-off Feb 2016 | 2105 Buchanan St | #3 - kitchen & bathrooms remodel. new cabinetry, appliances & finishes in kitchen. new tile, fixtures & cabinetry in bathrooms. new master closet/study. no change to exterior facade, no structural work.Details
#3 - kitchen & bathrooms remodel. new cabinetry, appliances & finishes in kitchen. new tile, fixtures & cabinetry in bathrooms. new master closet/study. no change to exterior facade, no structural work. | $90,000 |
| Mar 12, 2015 | Completed final sign-off Feb 2016 | 2105 Buchanan St | #1 - kitchen & bathrooms remodel. new cabinetry, appliances & finishes in kitchen. new tile, fixtures & cabinetry in bath #1. new tile & lighitng only bath #2. no change to exterior facade, no structural work.Details
#1 - kitchen & bathrooms remodel. new cabinetry, appliances & finishes in kitchen. new tile, fixtures & cabinetry in bath #1. new tile & lighitng only bath #2. no change to exterior facade, no structural work. | $70,000 |
| Jan 27, 2015 | Completed final sign-off Jun 2016 | 3162 Clay St | interior kitchen and bathroom remodel of 3162 clay street condo. minor movement of non-structural walls to accomodate for remodel.Details
interior kitchen and bathroom remodel of 3162 clay street condo. minor movement of non-structural walls to accomodate for remodel. | $40,000 |
| Dec 19, 2014 | Completed final sign-off Nov 2015 | 1960 Jefferson St | revision to 201409186689. remove dryrot and reframe wd ceiling at master bathDetails
revision to 201409186689. remove dryrot and reframe wd ceiling at master bath | |
| Nov 7, 2014 | Completed final sign-off May 2015 | 156 Dolores St | rear building- to comply with physical report #cc-7659 per drawings item # 1, add closet, bath & den at ground floor to make habitableDetails
rear building- to comply with physical report #cc-7659 per drawings item # 1, add closet, bath & den at ground floor to make habitable | $7,500 |
| Oct 6, 2014 | Completed final sign-off Sep 2015 | 763 Bay St | demo kitchen and 1 bathroom only.Details
demo kitchen and 1 bathroom only. | $1,800 |
| Sep 23, 2014 | Completed final sign-off Jan 2015 | 146 Galewood Cr | 2 bathroom remodelDetails
2 bathroom remodel | $45,000 |
| Sep 18, 2014 | Completed final sign-off Feb 2016 | 1960 Jefferson St | kitchen remodel, bathroom remodel on 2nd floor, added master bathroom, new stair connecting 1st floor and 2nd floors, create new bedroom and laundry at 1st floor, remodel 1st floor bathroom. n/a for the maher ordinance #155-13Details
kitchen remodel, bathroom remodel on 2nd floor, added master bathroom, new stair connecting 1st floor and 2nd floors, create new bedroom and laundry at 1st floor, remodel 1st floor bathroom. n/a for the maher ordinance #155-13 | $135,000 |
| Jul 31, 2014 | Completed final sign-off Apr 2015 | 3555 17th St | bathroom remodel, remove and replace in kind to codeDetails
bathroom remodel, remove and replace in kind to code | $22,000 |
| Jun 2, 2014 | Completed final sign-off Jun 2014 | 2040 Franklin St | new tile at bathroom and kitchen. new kitchen floor. flooring onlyDetails
new tile at bathroom and kitchen. new kitchen floor. flooring only | $6,000 |
| May 22, 2014 | Completed final sign-off Oct 2014 | 410 Gellert Dr | remodel in-kind, kitchen - replace countertop and floor, bring up lighting to code and install new appliance in-kind bath 5x4, bath 8x6Details
remodel in-kind, kitchen - replace countertop and floor, bring up lighting to code and install new appliance in-kind bath 5x4, bath 8x6 | $75,000 |
| Feb 18, 2014 | Completed final sign-off Jun 2014 | 3936 Clay St | remodel (2) baths & (1) laundy room.Details
remodel (2) baths & (1) laundy room. | $65,000 |
| Feb 7, 2014 | Completed final sign-off Nov 2014 | 150 Lombard St | bathroom 7x5 remodel , kitchen 8x8 remodel,in unit # 808a plumbing & electrical under seperate permit no changes to windows & doorsDetails
bathroom 7x5 remodel , kitchen 8x8 remodel,in unit # 808a plumbing & electrical under seperate permit no changes to windows & doors | $32,000 |
| Jan 14, 2014 | Never finaled issued Jan 2014, no final | 772 Clayton St | at 1/2 bath replace sink, toilet, vanity & tile floor, englarge closet opening non structural, replace lath & plaster at bedroom, ceiling in kind.Details
at 1/2 bath replace sink, toilet, vanity & tile floor, englarge closet opening non structural, replace lath & plaster at bedroom, ceiling in kind. | $7,200 |
| Jan 7, 2014 | Completed final sign-off Sep 2014 | 828 Clayton St | remodel three (3) bathrooms in-kind 6x7, 6x7 & 6x7.Details
remodel three (3) bathrooms in-kind 6x7, 6x7 & 6x7. | $38,000 |