Block 6593, lot 003
1442 Dolores St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 2
- Units
- 4
- Rooms
- 4 bathrooms
- Building
- 3,754 sq ft
- Lot
- 2,610 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 21, 2025 | Completed final sign-off May 2026 | 1442 Dolores St | Jjj & K Inc./Dba: Alexander Company | replace(6) street facing windows. material is wood alumnium clad. no size change. all double hung.Details
replace(6) street facing windows. material is wood alumnium clad. no size change. all double hung. | $23,000 |
| Aug 14, 2024 | Completed final sign-off Jul 2025 | 1442 Dolores St | American Standard Roofing Inc | reroofingDetails
reroofing | $16,000 |
| Nov 5, 2020 | Never finaled issued Jul 2021, no final | 202 Duncan St | Gil Construction & Assoc Inc. | renovate (e) studio unit at level 1. reconfigure (e) laundry closet at level 2.Details
renovate (e) studio unit at level 1. reconfigure (e) laundry closet at level 2. | $20,000 |
| Nov 5, 2020 | Never finaled issued Jan 2022, no final | 202 Duncan St | Gil Construction & Assoc Inc. | replace (e) aluminum sliding windows on 1/f south and east facades with (n) wood double hungDetails
replace (e) aluminum sliding windows on 1/f south and east facades with (n) wood double hung | $40,000 |
| Sep 30, 2020 | Completed final sign-off Nov 2023 | 202 Duncan St | Gil Construction & Assoc Inc. | remodel (1) kitchen & (1) bathroom, studio apartment. nove moving walls, new appliances, fixtures, floors, courters, etc. new new walls, new lighting shall comply with cec 150.0(k)3 & (k)5. all new fixtures remain at same location as (e).Details
remodel (1) kitchen & (1) bathroom, studio apartment. nove moving walls, new appliances, fixtures, floors, courters, etc. new new walls, new lighting shall comply with cec 150.0(k)3 & (k)5. all new fixtures remain at same location as (e). | $70,000 |
| May 13, 2008 | Never finaled issued May 2008, no final | 1444 Dolores St | street space permit only.Details
street space permit only. | ||
| Feb 11, 2008 | Never finaled issued Feb 2008, no final | 1444 Dolores St | street spaceDetails
street space | ||
| Nov 7, 2007 | Completed final sign-off Jul 2008 | 1444 Dolores St | in unit #1444: remodel the kitchen and bathroom, including removing existing interior walls and installation of new walls, install new electrical and new heating, install new water heater and new forced air unit.Details
in unit #1444: remodel the kitchen and bathroom, including removing existing interior walls and installation of new walls, install new electrical and new heating, install new water heater and new forced air unit. | $53,000 | |
| Oct 7, 2003 | Expired or cancelled expired Jun 2004 | 1442 Dolores St | Tara Roofing | reroofingDetails
reroofing | $6,500 |
| Apr 23, 2002 | Completed final sign-off Jun 2002 | 1442 Dolores St | reconfigure grnd flr kitchen layout (*rev to 2001071637o1)Details
reconfigure grnd flr kitchen layout (*rev to 2001071637o1) | ||
| Nov 2, 2001 | Expired or cancelled expired Oct 2004 | 1442 Dolores St | site plan app to demolish existing garage & replace w/new 2 car garage including a roof deck.residenDetails
site plan app to demolish existing garage & replace w/new 2 car garage including a roof deck.residen | $20,000 | |
| Jul 16, 2001 | Completed final sign-off Jun 2002 | 1442 Dolores St | renovation of extg kchn and upper bthrm/construction of addtional bthrm- remove (e) stair (horiz.)Details
renovation of extg kchn and upper bthrm/construction of addtional bthrm- remove (e) stair (horiz.) | $70,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Gil Construction & Assoc Inc. (3), American Standard Roofing Inc, Jjj & K Inc./Dba: Alexander Company, Tara Roofing
- Architects
- Daniel Ewald (2), Holger Menendez
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.